|
| 1 | Supply of following Decentralized materials at the works site as per RESSPO norms. |
| 2 | G.I. Pipe 6\" Dia(Provided by Contractor) |
| 3 | X-arms holding clamps with bolts & nuts for ST/PCC pole(Provided by Contractor) |
| 4 | M.S clamp for T-off channel with bolts & nutsfor ST/PCC pole(Provided by Contractor) |
| 5 | F-bracket with bolts & nutsfor ST/PCC pole(Provided by Contractor) |
| 6 | Stone pad, 300x300x75 mm.(Provided by Contractor) |
| 7 | PG Clamp (Provided by Contractor) |
| 8 | HDPE Pipe 120 mm(Provided by Contractor) |
| 9 | Number Plate with nuts & bolt (Provided by Contractor) |
| 10 | Aluminium Paint (Provided by Contractor) |
| 11 | Red oxide Paint (Provided by Contractor) |
| 12 | All Binding Wire (Provided by Contractor) |
| 13 | Barbed Wire G.I. (Provided by Contractor) |
| 14 | Earthing wire clamp nut & bolts (Provided by Contractor) |
| 15 | E-bracket with bolts & nuts.(Provided by Contractor) |
| 16 | E-Bracket 33 KV (Provided by Contractor) |
| 17 | 33 KV V Type X-arm Holding Clamp (Provided by Contractor) |
| 18 | 33 KV F-Bracket(Provided by Contractor) |
| 19 | Ded end clamp for pole/bracket with nuts & bolts (Provided by Contractor) |
| 20 | Armoured rod with ferules(Provided by Contractor) |
| 21 | Eye hook (Provided by Contractor) |
| 22 | Bolt, nuts & washer(Provided by Contractor) |
| 23 | Suspension Clamp with nut, bolt (Provided by Contractor) |
| 24 | J Hook(Provided by Contractor) |
| 25 | Three phase Distribution box(Provided by Contractor) |
| 26 | Three phase Distribution box (LS)(Provided by Contractor) |
| 27 | Neutral cum earth wire (Provided by Contractor) |
| 28 | 11 KV TPMO(Provided by Contractor) |
| 29 | 11 KV Fuse Set (Provided by Contractor) |
| 30 | LT Incoming Pannel with metering equipment & fixing arragement (Provided by Contractor) |
| 31 | All. Lug (Provided by Contractor) |
| 32 | Danger Board with clamps & boltsfor ST/PCC pole (Provided by Contractor) |
| 33 | 11 KV V Type X-arm Bracket (Provided by Contractor) |
| 34 | Clamps with nuts & bolts for Top /Dropper Channelfor ST/PCC pole.(Provided by Contractor) |
| 35 | PG clamps.(Provided by Contractor) |
| 36 | Stay Clamp.(Provided by Contractor) |
| 37 | LT Clamp. (Provided by Contractor) |
| 38 | LT shackle insulator. (Provided by Contractor) |
| 39 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 40 | ST Poes, 11 meter tong (Provided by Department) |
| 41 | PCC Pole8.5 mtr long. (Provided by Department) |
| 42 | ACSR Weasel Conductor.(Provided by Department) |
| 43 | ACSR Dog Conductor. (Provided by Department) |
| 44 | All Line Material (Provided by Department) |
| 45 | ABC 120+1X70+1X16 mmsq(Provided by Department) |
| 46 | Transformer 10 KVA.(Provided by Department) |
| 47 | Transformer 25 KVA (Provided by Department) |
| 48 | Transformer 63 KVA (Provided by Department) |
| 49 | Transformer 100 KVA. (Provided by Department) |
| 50 | 11 KV XLPE Cable size 3x70/120/185 mm2.(Provided by Department) |
| 51 | 11 KV Pilfer proof metering cubicle.(Provided by Department) |
| 52 | 11 KV CT/PT combined unit.(Provided by Department) |
| 53 | Erection |
| 54 | Erection of single support ST Pole/PCC for construction of 33 KV / 11 KV & LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 55 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractoron his own his own cost) |
| 56 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 57 | Earthing of Poles as per RESSPO norms |
| 58 | Erection of Sectional Double Pole ST/PCC for construction of 11 /33 KVline including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 59 | Laying, Streaching of Arial Bunch Cable size 3x120+1x70+1x16 mm2as per RESSPO norms |
| 60 | Laying of XLPE Cable 3x185 sqmm |
| 61 | Fixing & Making of cable jointing kit |
| 62 | Mounting of 10 KVA.(Provided by Department) |
| 63 | Mounting of 25 KVA (Provided by Department) |
| 64 | Mounting of 63 KVA (Provided by Department) |
| 65 | Mounting of 100 KVA. (Provided by Department) |
| 66 | Shifting of 25 KVA T/F at Propsed site |
| 67 | Shifting of 250 KVA T/F at Propsed site |
| 68 | Shifting of 630 KVA T/F at Propsed site |
| 69 | Mounting of 25 KVA T/F at Propsed site |
| 70 | Mounting of 250 KVA T/F at Propsed site |
| 71 | Mounting of 630 KVA T/F at Propsed site |
| 72 | Stringing & sagging of 3 phase HT line 33/11/LT KV upto proper sag including laying of ACSR Weasel /Dog Conductor, binding with insulators & jumpering. |
| 73 | Construction of Plinth |
| 74 | Dismantaling of Old 33 KV Line |
| 75 | Cartage of received back 33 KV Line Material from work site to ESC, Mirzapur including loading & unloading charge. |
| 76 | Disconnection & Reconnection of service cable |
| 77 | Dismantaling of Old 11 KV Line |
| 78 | Cartage of received back 11 KV Line Material from work site to ESC, Mirzapur including loading & unloading charge. |
| 79 | Dismantaling Charge of Old LT Line |
| 80 | Cartage of received back Old LT Line Material from work site to ESC, Mirzapur including loading & unloading charge. |
| 81 | Construction of Transformer plinth for 250 KVA Transformer of2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
| 82 | Construction of Transformer plinth for 630 KVA Transformer of2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
| 83 | Well type earthing of 250 KVA Transformer by using B class G.I. pipe of 1.5 \" dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6\" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor. |
| 84 | Well type earthing of 630 KVA Transformer by using B class G.I. pipe of 1.5 \" dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6\" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor. |
| 85 | Installation of 11 KV TPMO |
| 86 | Installation of 11 KV Fuse Set |
| 87 | Installation of LT Incomming Pannel with Metering equipment & fixing arrangement |
| 88 | Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamberas per RESPO norms |
| 89 | Installation of CT/PT combined unitas per RESPO norms |