|
| 1 | Providing 150mm dia borewell and erection of Submersible Pumpset @ Water Supply for Nedungudi Samathuvapuram Buriyal Ground in Semangalam Panchayat |
| 2 | Conducting Geophysical Survey in Fixing the Location |
| 3 | Drilling of borewell anywhere in Tiruvarur dt incl transportation from one place to another with in Tiruvarur dist in allvial soil or sedimentary stata of claaay ans sand stone shale pebbles, boulers etc . |
| 4 | Reaming of 150mm dia bore to 300mm dia bore |
| 5 | Labour charges for inserting PVC casingpipe (with slot or without slot) in drilled hole incl jointing the pipes with pvc coupler with cement paste complete and supplying and packing the annular space with pebbles of size and quality 150mm a)150mm OD PVC casing pipe assembly |
| 6 | b)Supply and delivery of PVC MW casing pipes (plain) |
| 7 | c)Supply and delivery of PVC MW casing pipes (slot) |
| 8 | d)Supply and delivery of PVC End cap |
| 9 | Charges for developing the bore well by required air compressor of 600 cfm capacity (min 8 hrs) incl cost of fuel ,transport etc complete |
| 10 | Supply and dlivery of wet type submesible-pump set 3HB(Threephase) with Out panel boardwith bore with is mark and suitable for installation in 150mm dia borewell and the pumpset shold be suppliyed with 5m of flat submersiable copper cale (duty condition-15pmx50m-5HP) |
| 11 | Cost and supply of3 core PVC insulated 4.0 sq.mm copper flat submersible cable as per IS 694/1990 andmultistand fire retartor flexible copper cable with ISI marking of reputed make for submersible motor erected in the bore well |
| 12 | Cost and supply of 65 mm dia HDPE pipes for submersible pump in borewell. PN 16 |
| 13 | Labour charges erection of ( 3.0 HP)submersiblepump set in bore well including fixing andjoiting the submersible cable clamps to the required depth,valves andverrection panel board control room twin earthing as per I.E Rules,GI wire etc. compelete including testing pumpset |
| 14 | Labour charges erection of ( 3.0 HP)submersiblepump set in bore well including fixing andjoiting the submersible cable clamps to the required depth,valves andverrection panel board control room twin earthing as per I.E Rules,GI wire etc. compelete including testing pumpset |
| 15 | Supply and delivery of wall mounting control Panelmade up of M.S sheet 18 SWG vermin proof, box tupe with hinged front door and fixed sides with inter locking facilty etc., compelete with internal wiring of Star Delta control panel with provision for cable end for D.O.L Banel Board |
| 16 | Provision for Name Board |
| 17 | Provision for Photographic charges |
| 18 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |