Tender For Supply Of Item 2000165586 10 10 10 HIRING OF SKIP LOADER 9 MON 20 HIRING OF SKIP LOADER 9 MON Email : ANKITA.MISHRA@AMNS.IN Contact : Name : Ankita Mishra Item Details : SCOPE OF WORK:- -VEHICLE FOR LIFTING AND SHIFTING OF SCRAP BUCKET OF 14T CAPACITY IN AMNS PREMISES. -SERVICE IS REQUIRED FOR EVACUATION OF SCRAP FROM PROCESS LINE AND DUMPING SCRAP TO SCRAP PIT OF SMP-1 OR OTHER STEEL MELTING SCRAP YARD SITE INSIDE AMNS PLANT. -SERVICE REQUIRED WILL BE 24 HRS/DAY *7 DAYS .OPERATING HOURS-20HRS/ DAY -MATERIAL MOVEMENT-METAL SCRAP/OTHER SOLID MATERIAL. 1. Contract Period shall be 1st APR 2025 to 31st DEC 2025, and Work Order Delivery Period shall be 1st APR 2025 to 31st Dec 2025 which will be renewed in next calendar year if required. 2. The vendor shall provide the specified equipment in healthy condition with competent manpower to perform operation and maintenance activities as per instructions of the AMNS site in-charge. 3. Necessary Attachment needs to be provided with Machines as per Operational Requirement. Any special attachment, if required, to be mentioned during submission of technical proposal. 4. Equipment manufacturing year must be 2018 or later (Equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. Any decision regarding acceptance of equipment of YOM earlier than 2018 will be taken by AMNS only in exceptional cases and rights for accepting such equipment’s will be only with AMNS. (Equipment age shall be less than 7 years, however Equipment completing 7 years during service delivery period shall be allowed up to service delivery period) 5. All new operator / driver will be deployed only after prior approval from AMNS site in-charge as per CHSE competency matrix. The vendor shall also deploy competent maintenance personnel to maintain equipment in healthy condition. 6. No Operation or maintenance personnel shall work beyond 12 hours for a given day and must be provided weekly off. In no case any person shall work more than 9 days in continuation. 7. All equipment / vehicle final check will be done by AMNS CHSE, and all required PPEs shall be in vendor’s scope. 8. For single shift operation, availability of machine <(>&<)> operator per shift, without any breakdown, certification will be considered 10 hours, as 2 hours to be considered for operators’ break and equipment maintenance. Similarly for double shift, certification will be considered 20 hours, as 4 hours to be considered for operators’ break and equipment maintenance. 9. The Contractor shall not move the equipment from designated work area to another area without prior approval from the AMNS site in-charge. Equipment must be parked safely only in assigned parking area. All Equipment must have reflective stickers on all around the equipment for nighttime visibility. 10. All equipment must comply with all applicable State and Central Govt. rules including but not limited to RTO rules <(>&<)> regulations. 11. Contractor shall deploy alternate equipment for any breakdown above 48 hours duration. 12. Daily logbook and equipment checklist as per format provided by the AMNS site in-charge, must be filled by operators and to be maintained by vendor throughout delivery period. Summary of equipment checklist to be submitted to user on 15th day of every month without fail. 13. All equipment maintenance records to be maintained by vendor throughout the contract period and to be produced as and when asked for. 14. GPS system to be installed from common vendor which is selected by AM/NS India, and provide data access to AM/NS India. 15. Fuel filling must be done at nearest safe place to the worksite and fuel bowser should have experienced crew for the said operation ensuring safety as per AMNS safety standards. 16. No workshop space / maintenance area will be provided for equipment maintenance work within the plant. Routine maintenance may be carried out at worksite with approval from the AMNS site in-charge. 17. The Contractor must restrict number of support vehicles (i.e., maintenance van, diesel bowsers, utility vehicles, etc.) based on fleet size. All such vehicles will be permitted only with approval of the AMNS site in-charge. 18. In case of discontinuation of services, either parties must give one month prior notice. 19.Maintenance of vehicle and regular checkup for smooth functioning of vehicle will be under vendor scope. Safety: 1. Violation of CHSE Policy will be dealt as per AMNS Consequence management policy and it will attract penalty accordingly. 2. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Whee lers movement will be allowed inside the Plant Premises. Road safety rules must be followed for safe movement inside plant premises. 3. Contract Owners must attend Contract Owner’s Meeting without fail as and when advised by AM/NS India. 4. Contracted Equipment should have all standard OEM safety devices and must adhere to AM/NS India Safety Device Matrix, provided along with this tender / work order. Note: As per PPES Matrix shall issue the PPES to each workman which include goggles,safety shoes,safety jacket <(>&<)> cut resistance hand gloves. Item Note : 2 2000165586 10 20 20 HIRING OF SKIP LOADER 9 MON 10 HIRING OF SKIP LOADER 9 MON Email : ANKITA.MISHRA@AMNS.IN Contact : Name : Ankita Mishra Item Details : SCOPE OF WORK:- -VEHICLE FOR LIFTING AND SHIFTING OF SCRAP BUCKET OF 14T CAPACITY IN AMNS PREMISES. -SERVICE IS REQUIRED FOR EVACUATION OF SCRAP FROM PROCESS LINE AND DUMPING SCRAP TO SCRAP PIT OF SMP-1 OR OTHER STEEL MELTING SCRAP YARD SITE INSIDE AMNS PLANT. -SERVICE REQUIRED WILL BE 24 HRS/DAY *7 DAYS .OPERATING HOURS-20HRS/ DAY -MATERIAL MOVEMENT-METAL SCRAP/OTHER SOLID MATERIAL. 1. Contract Period shall be 1st APR 2025 to 31st DEC 2025, and Work Order Delivery Period shall be 1st APR 2025 to 31st Dec 2025 which will be renewed in next calendar year if required. 2. The vendor shall provide the specified equipment in healthy condition with competent manpower to perform operation and maintenance activities as per instructions of the AMNS site in-charge. 3. Necessary Attachment needs to be provided with Machines as per Operational Requirement. Any special attachment, if required, to be mentioned during submission of technical proposal. 4. Equipment manufacturing year must be 2018 or later (Equipment of manufacturing year before 2018 will not be allowed) and it should be in of YOM earlier than 2018 will be taken by AMNS only in exceptional cases and rights for accepting such equipment’s will be only with AMNS. (Equipment age shall be less than 7 years, however Equipment completing 7 years during service delivery period shall be allowed up to service delivery period) 5. All new operator / driver will be deployed only after prior approval from AMNS site in-charge as per CHSE competency matrix. The vendor shall also deploy competent maintenance personnel to maintain equipment in healthy condition. 6. No Operation or maintenance personnel shall work beyond 12 hours for a given day and must be provided weekly off. In no case any person shall work more than 9 days in continuation. 7. All equipment / vehicle final check will be done by AMNS CHSE, and all required PPEs shall be in vendor’s scope. 8. For single shift operation, availability of machine <(>&<)> operator per shift, without any breakdown, certification will be considered 10 hours, as 2 hours to be considered for operators’ break and equipment maintenance. Similarly for double shift, certification will be considered 20 hours, as 4 hours to be considered for operators’ break and equipment maintenance. 9. The Contractor shall not move the equipment from designated work area to another area without prior approval from the AMNS site in-charge. Equipment must be parked safely only in assigned parking area. All Equipment must have reflective stickers on all around the equipment for nighttime visibility. 10. All equipment must comply with all applicable State and Central Govt. rules including but not limited to RTO rules <(>&<)> regulations. 11. Contractor shall deploy alternate equipment for any breakdown above 48 hours duration. 12. Daily logbook and equipment checklist as per format provided by the AMNS site in-charge, must be filled by operators and to be maintained by vendor throughout delivery period. Summary of equipment checklist to be submitted to user on 15th day of every month without fail. 13. All equipment maintenance records to be maintained by vendor throughout the contract period and to be produced as and when asked for. 14. GPS system to be installed from common vendor which is selected by AM/NS India, and provide data access to AM/NS India. 15. Fuel filling must be done at nearest safe place to the worksite and fuel bowser should have experienced crew for the said operation ensuring safety as per AMNS safety standards. 16. No workshop space / maintenance area will be provided for equipment maintenance work within the plant. Routine maintenance may be carried out at worksite with approval from the AMNS site in-charge. 17. The Contractor must restrict number of support vehicles (i.e., maintenance van, diesel bowsers, utility vehicles, etc.) based on fleet size. All such vehicles will be permitted only with approval of the AMNS site in-charge. 18. In case of discontinuation of services, either parties must give one month prior notice. 19.Maintenance of vehicle and regular checkup for smooth functioning of vehicle will be under vendor scope. Safety: 1. Violation of CHSE Policy will be dealt as per AMNS Consequence management policy and it will attract penalty accordingly. 2. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Whee lers movement will be allowed inside the Plant Premises. Road safety rules must be followed for safe movement inside plant premises. 3. Contract Owners must attend Contract Owner’s Meeting without fail as and when advised by AM/NS India. 4. Contracted Equipment should have all standard OEM safety devices and must adhere to AM/NS India Safety Device Matrix, provided along Note: As per PPES Matrix shall issue the PPES to each workman which include goggles,safety shoes,safety jacket <(>&<)> cut resistance hand gloves. Item Note : 3 2000165586 10 30 20 HIRING OF SKIP LOADER 9 MON 10 HIRING OF SKIP LOADER 9 MON Email : ANKITA.MISHRA@AMNS.IN Contact : Name : Ankita Mishra Item Details : SCOPE OF WORK:- -VEHICLE FOR LIFTING AND SHIFTING OF SCRAP BUCKET OF 14T CAPACITY IN AMNS PREMISES. -SERVICE IS REQUIRED FOR EVACUATION OF SCRAP FROM PROCESS LINE AND DUMPING SCRAP TO SCRAP PIT OF SMP-1 OR OTHER STEEL MELTING SCRAP YARD SITE INSIDE AMNS PLANT. -SERVICE REQUIRED WILL BE 24 HRS/DAY *7 DAYS .OPERATING HOURS-20HRS/ DAY -MATERIAL MOVEMENT-METAL SCRAP/OTHER SOLID MATERIAL. 1. Contract Period shall be 1st APR 2025 to 31st DEC 2025, and Work Order Delivery Period shall be 1st APR 2025 to 31st Dec 2025 which will be renewed in next calendar year if required. 2. The vendor shall provide the specified equipment in healthy condition with competent manpower to perform operation and maintenance activities as per instructions of the AMNS site in-charge. 3. Necessary Attachment needs to be provided with Machines as per Operational Requirement. Any special attachment, if required, to be mentioned during submission of technical proposal. 4. Equipment manufacturing year must be 2018 or later (Equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. Any decision regarding acceptance of equipment of YOM earlier than 2018 will be taken by AMNS only in exceptional cases and rights for accepting such equipment’s will be only with AMNS. (Equipment age shall be less than 7 years, however Equipment completing 7 years during service delivery period shall be allowed up to service delivery period) 5. All new operator / driver will be deployed only after prior approval from AMNS site in-charge as per CHSE competency matrix. The vendor shall also deploy competent maintenance personnel to maintain equipment in healthy condition. 6. No Operation or maintenance personnel shall work beyond 12 hours for a given day and must be provided weekly off. In no case any person shall work more than 9 days in continuation. 7. All equipment / vehicle final check will be done by AMNS CHSE, and all required PPEs shall be in vendor’s scope. 8. For single shift operation, availability of machine <(>&<)> operator per shift, without any breakdown, certification will be considered 10 hours, as 2 hours to be considered for operators’ break and equipment maintenance. Similarly for double shift, certification will be considered 20 hours, as 4 hours to be considered for operators’ break and equipment maintenance. 9. The Contractor shall not move the equipment from designated work area to another area without prior approval from the AMNS site in-charge. Equipment must be parked safely only in assigned parking area. All Equipment must have reflective stickers on all around the equipment for nighttime visibility. 10. All equipment must comply with all applicable State and Central Govt. rules including but not limited to RTO rules <(>&<)> regulations. 11. Contractor shall deploy alternate equipment for any breakdown above 48 hours duration. 12. Daily logbook and equipment checklist as per format provided by the AMNS site in-charge, must be filled by operators and to be maintained by vendor throughout delivery period. Summary of equipment checklist to be submitted to user on 15th day of every month without fail. 13. All equipment maintenance records to be maintained by vendor throughout the contract period and to be produced as and when asked for. AM/NS India, and provide data access to AM/NS India. 15. Fuel filling must be done at nearest safe place to the worksite and fuel bowser should have experienced crew for the said operation ensuring safety as per AMNS safety standards. 16. No workshop space / maintenance area will be provided for equipment maintenance work within the plant. Routine maintenance may be carried out at worksite with approval from the AMNS site in-charge. 17. The Contractor must restrict number of support vehicles (i.e., maintenance van, diesel bowsers, utility vehicles, etc.) based on fleet size. All such vehicles will be permitted only with approval of the AMNS site in-charge. 18. In case of discontinuation of services, either parties must give one month prior notice. 19.Maintenance of vehicle and regular checkup for smooth functioning of vehicle will be under vendor scope. Safety: 1. Violation of CHSE Policy will be dealt as per AMNS Consequence management policy and it will attract penalty accordingly. 2. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Whee lers movement will be allowed inside the Plant Premises. Road safety rules must be followed for safe movement inside plant premises. 3. Contract Owners must attend Contract Owner’s Meeting without fail as and when advised by AM/NS India. 4. Contracted Equipment should have all standard OEM safety devices and must adhere to AM/NS India Safety Device Matrix, provided along with this tender / work order. Note: As per PPES Matrix shall issue the PPES to each workman which include goggles,safety shoes,safety jacket <(>&<)> cut resistance hand gloves. Item Note : 4 2000165586 10 40 10 HIRING OF SKIP LOADER 9 MON 20 HIRING OF SKIP LOADER 9 MON Email : ANKITA.MISHRA@AMNS.IN Contact : Name : Ankita Mishra Item Details : SCOPE OF WORK:- -VEHICLE FOR LIFTING AND SHIFTING OF SCRAP BUCKET OF 14T CAPACITY IN AMNS PREMISES. -SERVICE IS REQUIRED FOR EVACUATION OF SCRAP FROM PROCESS LINE AND DUMPING SCRAP TO SCRAP PIT OF SMP-1 OR OTHER STEEL MELTING SCRAP YARD SITE INSIDE AMNS PLANT. -SERVICE REQUIRED WILL BE 24 HRS/DAY *7 DAYS .OPERATING HOURS-20HRS/ DAY -MATERIAL MOVEMENT-METAL SCRAP/OTHER SOLID MATERIAL. 1. Contract Period shall be 1st APR 2025 to 31st DEC 2025, and Work Order Delivery Period shall be 1st APR 2025 to 31st Dec 2025 which will be renewed in next calendar year if required. 2. The vendor shall provide the specified equipment in healthy condition with competent manpower to perform operation and maintenance activities as per instructions of the AMNS site in-charge. 3. Necessary Attachment needs to be provided with Machines as per Operational Requirement. Any special attachment, if required, to be mentioned during submission of technical proposal. 4. Equipment manufacturing year must be 2018 or later (Equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. Any decision regarding acceptance of equipment of YOM earlier than 2018 will be taken by AMNS only in exceptional cases and rights for accepting such equipment’s will be only with AMNS. (Equipment age shall be less than 7 years, however Equipment completing 7 years during service delivery period shall be allowed up to service delivery period) 5. All new operator / driver will be deployed only after prior approval from AMNS site in-charge as per CHSE competency matrix. The vendor shall also deploy competent maintenance personnel to maintain equipment in healthy condition. 6. No Operation or maintenance personnel shall work beyond 12 hours for a given day and must be provided weekly off. In no case any person shall work more than 9 days in continuation. 7. All equipment / vehicle final check will be done by AMNS CHSE, and all required PPEs shall be in vendor’s scope. 8. For single shift operation, availability of machine <(>&<)> operator per shift, without any breakdown, certification will be considered 10 hours, as 2 hours to be considered for operators’ break and equipment maintenance. Similarly for double shift, certification will be considered 20 hours, as 4 hours to be considered for operators’ break and equipment maintenance. 9. The Contractor shall not move the equipment from designated work area to another area without prior approval from the AMNS site in-charge. Equipment must be parked safely only in assigned parking area. All Equipment must have reflective stickers on all around the equipment for nighttime visibility. 10. All equipment must comply with all applicable State and Central Govt. rules including but not limited to RTO rules <(>&<)> regulations. 11. Contractor shall deploy alternate equipment for any breakdown above 48 hours duration. 12. Daily logbook and equipment checklist as per format provided by the AMNS site in-charge, must be filled by operators and to be maintained by vendor throughout delivery period. Summary of equipment checklist to be submitted to user on 15th day of every month without fail. 13. All equipment maintenance records to be maintained by vendor throughout the contract period and to be produced as and when asked for. 14. GPS system to be installed from common vendor which is selected by AM/NS India, and provide data access to AM/NS India. 15. Fuel filling must be done at nearest safe place to the worksite and fuel bowser should have experienced crew for the said operation ensuring safety as per AMNS safety standards. 16. No workshop space / maintenance area will be provided for equipment maintenance work within the plant. Routine maintenance may be carried out at worksite with approval from the AMNS site in-charge. 17. The Contractor must restrict number of support vehicles (i.e., maintenance van, diesel bowsers, utility vehicles, etc.) based on fleet size. All such vehicles will be permitted only with approval of the AMNS site in-charge. 18. In case of discontinuation of services, either parties must give one month prior notice. 19.Maintenance of vehicle and regular checkup for smooth functioning of vehicle will be under vendor scope. Safety: 1. Violation of CHSE Policy will be dealt as per AMNS Consequence management policy and it will attract penalty accordingly. 2. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Whee lers movement will be allowed inside the Plant Premises. Road safety rules must be followed for safe movement inside plant premises. 3. Contract Owners must attend Contract Owner’s Meeting without fail as and when advised by AM/NS India. 4. Contracted Equipment should have all standard OEM safety devices and must adhere to AM/NS India Safety Device Matrix, provided along with this tender / work order. Note: As per PPES Matrix shall issue the PPES to each workman which include goggles,safety shoes,safety jacket <(>&<)> cut resistance hand