| 1 | Construction of RCC Open well |
| 2 | Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan)for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter.All kinds of soil |
| 3 | From0 m to 3 m BGL |
| 4 | Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan)for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. |
| 5 | Ordinary rock |
| 6 | From3 m to 7 m BGL |
| 7 | Hard rock (requiring blasting) usefulmaterial 30 % |
| 8 | From7 m to 25 m BGL |
| 9 | Add extra over item No. 2.39.1 for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils. |
| 10 | In All Kind of soil |
| 11 | From1.5 m to 3 m BGL |
| 12 | In ordinary rock and hard rock |
| 13 | From3 m to 4.5 m BGL |
| 14 | From4.5 m to 6 m BGL |
| 15 | From6 m to 7.5 m BGL |
| 16 | From7.5 m to 9 m BGL |
| 17 | From9 m to 10.5 m BGL |
| 18 | From10.5 m to 12 m BGL |
| 19 | From12 m to 13.5 m BGL |
| 20 | From13.5 m to 15 m BGL |
| 21 | From15 m to 16.5 m BGL |
| 22 | From16.5 m to 18 m BGL |
| 23 | From18 m to 19.5 m BGL |
| 24 | From19.5 m to 21 m BGL |
| 25 | From21 m to 22.5 m BGL |
| 26 | From22.5 m to 24 m BGL |
| 27 | From24 m to 25 m BGL |
| 28 | Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. |
| 29 | From12 m to 25 m BWL |
| 30 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Walls (any thickness) including attached pilasters, buttresses plinth and string course. Add extra for shuttering in circular work (in respective centering and shuttering items) |
| 31 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position in binding (including cost of binding wire ) all complete up to floor three level Thermo mechanically treated bars (conforming to relevant IS code.) |
| 32 | Providing and laying in position specified grade of cement concretee for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc. M20 grade Nominal Mix / Design Mix |
| 33 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: |