| 1 | Erection of Material |
| 2 | Loading Carriage and unloading of poles from store to work site of vice versa or from one site to another. |
| 3 | Erection of four pole structure by digging of pit by hydra. |
| 4 | Erection of Double pole structure by digging of pit by hydra. |
| 5 | Erection of Single/Stud pole by digging of pit by hydra. |
| 6 | Grouting of pole with cement brick ballast and coarse sand as per standard specification. |
| 7 | Making plinth of single pole of 400 mm dia., 500 mm height (200 mm underground) with C.C., In ration 1:4:8 of caments, stone ballast and coarse sand including cost of materials. |
| 8 | Painting of S.T. Pole with one cost of red oxide and two coats of Aluminium Paid including cost of Ist class enamel paint. |
| 9 | Earthing of supports by sagging of M.S. earthing rod 20 mm and connecting with earth wire and related works as per standard specifications. |
| 10 | Loading Carriage and unloading of ACSR Dog Conductor from store to work site or vice-versa. |
| 11 | Laying, stringing, tensioning and final sagging of G.I. wire including of cross lacing. |
| 12 | Loading Carriage and unloading of Earth Wire/G.I. wire from store to work site of vice versa |
| 13 | Laying, stringing, tensioning and binding of ACSR Dog conductor for making jumpers on riser. |
| 14 | Taking out of 33/11 KV XLPE 3x300 Sq.mm cable from drum/complete drum of cable at site to work or store using JCB including carriage. |
| 15 | Digging of Pit Size 2x2x1 mtr. Deep for laying of cable cable through HDD Method. |
| 16 | Laying of Cable by HDD method as per site requirment. |
| 17 | Mounting of cable box on double pole With Pipe |
| 18 | Mounting of 33 kV Pin Insulator |
| 19 | Mounting of Disc Insulator |
| 20 | Erection ofDisc Fitting with disc string |
| 21 | Fixing of V-Type cross arm on erected/existing double/try/four pole. |
| 22 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 23 | Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa. |
| 24 | Laying G.I. Wire with cross lacing for guarding of Line. |
| 25 | Fabrication/modification of MS Item as per requirement of site |
| 26 | Fixing of MS Channel (100x50x6 )mm 2.4 / 2.8 mtr. Long/M.S. Angleand as per Required size |
| 27 | Fixing of guarding angle/guarding channel for laying of guarding |
| 28 | Fixing of cross bracing on double pole structure and related work. |
| 29 | Fixing of danger board on erected poles |
| 30 | Making 33 KV straight through joint including digging of pit upto 1,1 metre depth |
| 31 | Chopping of tree branches by hydra with Machinefor lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site |
| 32 | Dismentalling of jumpering from cable box to line, cable support switchgear panels. |
| 33 | Making jumpers from cable box to line, cable support switchgear panels, section poles of each phase. |
| 34 | Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely. |
| 35 | Carriage of all concerning stock materialfrom KESCo Store to site or vice-versa. |
| 36 | Dismentalling of Material |
| 37 | L/c for dismentalling of damaged S.T. Pole with the help of crane after removing all the accessories from damged pole and its all related work. Including digging of pit or by cutting with gas cutter. |
| 38 | L/c for dismentalling of binding wire from indulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixed conductor & rolling into bundles. |
| 39 | L/c for Dismentalling of M.S. Channel/X-arm/Guarding angle. |