Supply Of Materials For Construction Of Kitchen Room In Government Highschool At Tigadi Village Of Mudalagi Taluka. - Broken Stone Aggregate 40 Mm Size,,Broken Stone Aggregate 20 Mm Size,,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Coarse Sand (Zone Iii),,Portland Cement,.,Mixer (Concrete) - 1 Cum Capacity.,,Add Watering Charges At 1 % On Material.,,Size Stone 20 X 20 X 25 Cms.,,Bond Stone 20 X 20 X 45 Cm.,,Boulders.,,Mixer (Concrete Small Used In Culvert.),Mason Class I (With Tools).,.,,Mason Class Ii (With Tools).,.,Stone Chistler Class - Ii,Add Watering Charges At 1 % On Labour.,,Plasticizer / Super Plasticizer.,.,Hom Of Vibrator 0.71 Days.,,Tmt Bars Fe 500,.,Binding Wire,.,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Jungle Wood Runners And Plank.,,Casurina Poles 75 - 100 Mm Dia.,Casurina Poles 100 - 150 Mm.,,Ms Flat,.,Bolts And Nuts,,Latrite.,,Add Handling Loading And Unloading At 1% On Material.,,Ms Pipes Of 80 Mm To 100 Mm Dia,,Rms Gusset Plate,,Corbon Electrodes.,,Welder Grade I,,Hom Of Welding And Grinding Machine.,,Mechanic Class Ii / Mechanic Hmp Grade I/Eme Grade,Hom Of Cutting And Grinding Machine.,,Tools And Plants At 2% Of Material,Unit Cost As Per The Specification,,Dry Distemper.,.,Whitening,.,Painter Class I.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Plastic Emulision Paint 01,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Sal Wood(White),Add Cutting And Other Wastage 5% .,Honne Wood,,Honnewood Planks For Panels 20 Mm Thick,,Aluminium Window Frame Section 1.20Mm Thick,Nylon Rollers.,Rubber Beading For Shutters Beading.,Pvc Beading.,Alluminium Tower Bolt-20 Cm,Alluminium Handles-15 Mm,Cleat Angles.,Chrominum Plated Screws.,A 5.50 Mm Thick Plain Glass,Fabricator-01,Add Hom Of Welding And Grinding Machine 2% On Material-02,Polyenthylene Water Storage Tank Of Specified Capacity L-0,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material-02,Vitrified Tiles 600X600 Mm-02,Add Handling , Loading And Unloading At 2% On Material-02