Tender For Mines And Menerals 2025 - 2026 - Guzilimparai Block Of Mallapuram Panchayat 3 Works; 1 1. Name of work: Construction ofMini Multi prupose building at Multi purpose building at Mallapuram H/O MallapuramEstimate amount:Rs.55.00 Lakhs 2 Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., For Foundation 3 Supply and filling in Foundation and Basement with M.sand in layers not more than 15cm thickinculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., For Foundation 4 Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., For Foundation 5 Refilling the excavated earth other then sand including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete 6 Brick work with cement mortar 1:5 mix using country bricks of size 83/4x41/4x2 3/4 for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. 7 R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., 8 Supplying and fabrication of steel,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. 9 Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., 10 Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc 11 Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). 12 Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. 13 Providing weathering course with best quality of broken jelly of size 20mm uniform gauge in pure slacked lime (no sand to be used) over the roof slab in the proportion of brickjelly lime 32:121/2 by volume and laid over in a single layer and consolidated to the required thickness & beating the concrete with wooden beaters of approved pattern as per std. specifications etc., complete. 14 Finishing the top of roof with one course of machine pressed tiles of size20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc.,complete. 15 Distembering two coats with oil bound distember two coats over priming coat including cost and conveyance of all materials and labor charges etc complete. 16 Exterior Emulsion two coats over priming coat including cost and conveyance of all materials and labor charges etc complete. 17 Painting two coats with enamel paint over new iron work including cost & conveyance of all materials to site and all labour charges etc., complete. 18 Supply and fixing of Steel door of size 1.00 x 2.10 m including all materials and all labour charges etc complete 19 Supply and fixing of Steel window of size 0.90 x 1.60 m including all materials and all labour charges etc complete 20 Electrification arrangements 21 Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealedPVC light/ fan point (SD No.25) 22 Supply and fixing of 1200mm sweep AC ceiling fan complete with stepped electronic regulator with 300mm down rod on the existing clamp SD 106 23 Supply and fixing of4-18WLED tube with fitting inclusive of all charges (SD No.88) 24 Supply and fixing of water tight Bulk Head fitting with guard (Philips / Bajaj / Crompton / Klite) suitable for incandencent lamp and 60W bulb (SD N0.83) 25 Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathedSC.cu. conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealedPVC plug point (SD No.38) 5 pin plug point 26 Supply and fixing of TNEB meter Board suitable for 32A Single Phase service connection with 32A Fuse unit (500V) 32A neutral link and earth link (1 x 1/8 Copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1 thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit. (SD No. 125) 27 Supply and run of 2x4 sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 25mm dia GI pipe (Class B) suitably bent at both ends with necessary angle iron upright and end supports for mains SD 70 28 Supply and run of 2 of 1.50 Sq.mm polythene insulated PVC sheathed heavy duty SC Copper conductor of 1100 V grade on 7/20 GI bearer wire for service connection mains (SD No.64) 29 Supply and Fixing of 16 Amps DP Switch of500V with Metal Clad with Fuse and Neutral ( SD 142 ) 30 Construction of Toilet Building 31 Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete. 32 Supplying and Filling the foundation and basement with filling sand in layers not more than 15cm . Thick well rammed, watered and compacted Complete complying with standard specification. 33 Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete 34 Random Rubble Masonry in CM 1:5 mix using required bond stone with simultaneious pointing including all cost and conveyance of labour charges etc., 35 Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. 36 Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations 37 Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete. 38 RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. 39 Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). 40 Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials to site and labour charges etc. complete. 41 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 42 Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. 43 Distembering two coats with best quality of distember and the colour approved by the departmental officersincluding cost & conveyance of all materials to site and all labour charges etc., complete. 44 Painting two coats with best quality of Ready mixed Plastic emulison of Ist class paintWith appd. colour approved by the departmental officersincluding cost & conveyance of all materials to site and all labour charges etc., complete. 45 Painting two coats over new iron work using synthetic enamel paint including cost and conveyace of all materials to site etc. complete. 46 Supply of door of size of 0.90 x 2.10 including all cost and conveyance etc., 47 Supply of RCC jolly of size of 0.60 x 0.60 including all cost and conveyance etc., 48 Supply of Indian type water closet jolly of size of 0.60 x 0.45 including all cost and conveyance etc., 49 Electrification arrangements 50 Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealedPVC light/ fan point (SD No.25) 51 Supply and fixing of4-18WLED tube with fitting inclusive of all charges (SD No.88) 52 Water supply arrangements 53 63mm PVC pipe 54 63mm PVC MTA 55 63mm PVC Bend 56 Solvent oil 57 1000 lit HDPE tank 58 Earthwork exvacation in all classes of soila nd sub soil including all cost and conveyance of all materials and all labour charges etc complete 59 For pipe line 60 Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete 61 GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column BB for all works in this package} ( for Earthwork 18% ) 62 Part 2 : Construction of 30000 lit OHT at Nellamparai in Mallapuram panchayatEstimate Amount Rs.17.50 lakhs 63 Earthworkexcavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart 64 First depth of 2m 65 Second depth of 1m 66 Sand filling for foundation withM. sand including cost of sand watering, ramming and consolidationetc complete 67 Cementconcrete1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete 68 RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete 69 For items 1.5m to 4.5m below GL 70 For items 0 to 1.50m below GL 71 For items 0m to 4.5m above GL 72 For items 4.51m to 7.32m above GL 73 For items 7.32m to 10.98m above GL 74 For items 10.98m to 14.64m above GL 75 For items above 14.64m & up to 18.30m from GL 76 Supplying and erecting steel centering for sides and soffits I including necessary supports and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding 77 PLANE SURFACES 78 ABOVE G.L. to 3.30m 79 5.30m . to 6.30m 80 8.30m . to 9.30m 81 11.31m to 12.30m 82 Curved Surface 83 0 to 3.30mfrom floor level 84 Square column 85 Below G.L. 86 Ground level to 3.30 m 87 3.31 to 4.30m 88 4.31 to 5.30m 89 5.31 to 6.30m 90 6.31 to 7.30m 91 7.31 to 8.30m 92 8.31 to 9.30m 93 9.31 to 10.30m 94 10.31 to 11.30m 95 11.31 to 12.30m 96 Painting twocoats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers 97 Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. 98 FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c 99 Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu 100 Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes incluidng all materials and all labour charges 101 Providing cut stone slab in CM 1:3 incluidng all materials and all labour charges 102 Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edgesincluidng all materials and all labour charges 103 Pipe connection arrangements 104 65mm Ø GI pipes for over flow & 1xl 105 rain water harvesting pipe 65mm Ø GI pipes for over flow & 1xl 106 50mm Ø GI pipes for scour pipe 1xl 107 65mm Ø GI pipe for delivery 1x1 pipe 108 90mm Ø PVC Threaded coupler 109 65 mm Ø PVC threaded coupler 110 65mm Ø GI Tee 111 65mm Ø GI 900 Bend 112 65mm Ø GI coupler 113 65mm Ø GI union 114 65mm Ø GI Elbow 115 65x50mm Ø GI Reducer 116 75mmx 63mm PVC Reducer 117 75mm PVC Threaded coupler 118 75x90 PVC Reducer 119 75x63 PVC Reducer 120 65mm Ø GM Gate valve 121 50mm Ø GM gate valve 122 Delivery line pipe connection 123 63mm PVC pipe 4KSC 124 63mm PVC MTA 125 Solvent oil 126 Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete 127 Pipe line 128 Labour charges for laying and lowering PVC Pipe and specials including all cost and conveyance of all materials and all labour charges etc complete 129 Pipe line 130 Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. 131 Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete 132 GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column BB for all works in this package} 133 Part 2 : Construction of 30000 lit OHT at Nellamparai in Mallapuram panchayatEstimate Amount Rs.17.50 lakhs 134 Earthworkexcavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart 135 First depth of 2m 136 Second depth of 1m 137 Sand filling for foundation withM. sand including cost of sand watering, ramming and consolidationetc complete 138 Cementconcrete1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete 139 RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating withmechanical vibrator, finishing, curing etc., complete 140 For items 1.5m to 4.5m below GL 141 For items 0 to 1.50m below GL 142 For items 0m to 4.5m above GL 143 For items 4.51m to 7.32m above GL 144 For items 7.32m to 10.98m above GL 145 For items 10.98m to 14.64m above GL 146 For items above 14.64m & up to 18.30m from GL 147 Supplying and erecting steel centering for sides and soffits I including necessary supports and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding 148 PLANE SURFACES 149 ABOVE G.L. to 3.30m 150 5.30m . to 6.30m 151 8.30m . to 9.30m 152 11.31m to 12.30m 153 Curved Surface 154 0 to 3.30mfrom floor level 155 Square column 156 Below G.L. 157 Ground level to 3.30 m 158 3.31 to 4.30m 159 4.31 to 5.30m 160 5.31 to 6.30m 161 6.31 to 7.30m 162 7.31 to 8.30m 163 8.31 to 9.30m 164 9.31 to 10.30m 165 10.31 to 11.30m 166 11.31 to 12.30m 167 Painting twocoats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers 168 Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. 169 FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c 170 Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu 171 Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes incluidng all materials and all labour charges 172 Providing cut stone slab in CM 1:3 incluidng all materials and all labour charges 173 Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edgesincluidng all materials and all labour charges 174 Pipe connection arrangements 175 65mm Ø GI pipes for over flow & 1xl 176 rain water harvesting pipe 65mm Ø GI pipes for over flow & 1xl 177 50mm Ø GI pipes for scour pipe 1xl 178 65mm Ø GI pipe for delivery 1x1 pipe 179 90mm Ø PVC Threaded coupler 180 65 mm Ø PVC threaded coupler 181 65mm Ø GI Tee 182 65mm Ø GI 900 Bend 183 65mm Ø GI coupler 184 65mm Ø GI union 185 65mm Ø GI Elbow 186 65x50mm Ø GI Reducer 187 75mmx 63mm PVC Reducer 188 75mm PVC Threaded coupler 189 75x90 PVC Reducer 190 75x63 PVC Reducer 191 65mm Ø GM Gate valve 192 50mm Ø GM gate valve 193 Delivery line pipe connection 194 63mm PVC pipe 4KSC 195 63mm PVC MTA 196 Solvent oil 197 Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete 198 Pipe line 199 Labour charges for laying and lowering PVC Pipe and specials including all cost and conveyance of all materials and all labour charges etc complete 200 Pipe line 201 Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. 202 Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete 203 GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column BB for all works in this package}