Upgradation Implementation Of Automation Work Based On Scada Of Phase-1 And Phase-2, Operation And Maintenance Of Complete Automation System (Up To 5 Year) Of Dehani Lift Irrigation Scheme Under Bembla River Project , Component For Phase-1 Automation (Pump House- Sdc) , Upgradation Of (Formerly Ge-Fanuc) 90-30 Plc System With Latest Rx3i Plc With Plc System For Pump House No.1& 2 Each , Upgradation Of Scada Pc Stations With 27” Monitor & Printers Along With Required Licenses For Each Pump House Locations. , Sitc Of Gsm Connectivity Between Pump Houses &Sdcs , Upgradation Of (Formerly Ge-Fanuc) Micro Plc System For Sdcs , Sitc Of 3Kva Online Double Conversion Ups System At Pumphouseno.1& 2 With 1 Hour Backup , Sitc Of 1Kva Online Double Conversion Ups System At Sdcs With 1 Hour Backup , Supply & Installation Of Following Instruments , Level Transmitter For Sump Level Measurement, 25 Meters Maximum , Level Transmitter For Sump Level Measurement, 5 Meters Maximum , Pressure Transmitter For The Pump Outlet Pressure Measurement , Pressure Switch , Clamp On Type Flow Meter For 900Mm Line , Clamp On Type Flow Meter For 1700Mm Line , Clamp On Type Flow Meter For 600Mm Line , Clamp On Type Flow Meter For 1100Mm Line , Pressure Gauge , Component For Phase-2 Automation For 1 Sdc/Zone (Total 57) , Filtration Unit , Automatic Primary Filter With Backwash Assembly 8/10” , Butterfly Valve8/10” , Water Meter8/10” , Pressure Reliefvalve 8/10” , Combination Air Release Valve , Pressure Gauge , Water Control Device , Pressure Reducing Valve 8/10” , Butterfly Valve 8/10” , Combination Air Release Valve , Solenoid Valve (On/Off) 8/10” , Automation , Irrigation Controller With 24 Outputs All Accessories , Center Unit Host+Base+Batt+Ps+Ant , Rtu2xdo2xdi , Expansion Card (2 X Do, 2 X Di) , Monopole Ant.430-470 3M , Solar Panel Kit 9V-3W , Operation And Maintenance For 5 Years , Supervision By 1 Supervisor + 2 Site Technicians, Spare Parts, Automation Support, Annual License Charges, Sim Charges, Software Handling Charges, For 5 Years