| 1 | Electrical Items : |
| 2 | STAY CLAMP WITH N&B SP-72 (75X8mm) |
| 3 | Bracing Clamp Top SP-55 with N/B |
| 4 | LT Clamp(50x6mm) for SP-72with N&B |
| 5 | Bottom Bracing clamp 33KV for SP-72- N&B |
| 6 | E/WIRE CLAMP FOR SP-72 WITH N&B 65X6 |
| 7 | LT CLAMP WITH N&B ST POLE SP-55 |
| 8 | EARTHWIRE CLAMPFOR SP-55 WITHN/B |
| 9 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 10 | Stay Clamp for SP-55 With Nut & Bolt |
| 11 | PG CLAMP ALU ALLOY PANTHER TO PANTHER |
| 12 | PP & CLAMP WITH N&B ST POLE SP-72 |
| 13 | SHACKLE INSULATOR 100X115 mm WITH N&B |
| 14 | BRACING CLAMP BOTTOM WITH N&B SP-55 |
| 15 | Bolt & Nuts off Size |
| 16 | Top Bracing clamp 33KV for SP-72 withN&B |
| 17 | 33 KV Tension clamp with Bail & IPC |
| 18 | 33 KV Cable ties for Pin insulator |
| 19 | 33 KV IPC for covered to covered conduct |
| 20 | 33 KV IPC for covered to Bare conductor |
| 21 | 33 KV Mid span jointing kit |
| 22 | IPC with aluminium bail for earthing |
| 23 | 33 KV Disc insulator for AAAC conductor |
| 24 | 33KV Polymer Pin Ins.(For Convered Cond) |
| 25 | 33KV AAAC COVERED COND. AL-59,241 SQ.MM. |
| 26 | LABOUR(SERVICES) |
| 27 | ERECTION OF EARTHING ROD |
| 28 | FABRICATION OF STEEL |
| 29 | EXCAVATION OF PIT FOR STAY SET |
| 30 | ERECTION OF 33 KV STAY SET |
| 31 | GROUTING OF STAY SET |
| 32 | EXCAVATION OF PIT FOR POLE |
| 33 | ERECTION OF SINGLE SP-55 POLE |
| 34 | ERECTION OF SINGLE SP-72 POLE |
| 35 | ERECTION OF SP-55 DOUBLE POLE |
| 36 | ERECTION OF SP-72 DOUBLE POLE |
| 37 | ERECTION OF SP-55(11KV/33 KV) FOUR POLE |
| 38 | ERECTION OF SP-72(11KV/33 KV) FOUR POLE |
| 39 | GROUTING OF POLE |
| 40 | MUFFING OF POLE |
| 41 | DISMANTLING OF SP-21/SP-23 SINGLE POLE |
| 42 | DISMANTLING OF SP-55 SINGLE POLE |
| 43 | DISMANTLING OF RAIL SINGLE POLE |
| 44 | DISMANTLING OF SP-55 DOUBLE POLE |
| 45 | DISMANTLING OF 11 KV LINE(DOG) |
| 46 | DISMANTLING OF GUARDING IN 11 KV LINE |
| 47 | DISMANTLING OF GUARDING IN 33 KV LINE |
| 48 | FIXING OF FUSE SET |
| 49 | ERECTION OF BRACKET IN 11 KV LINE |
| 50 | ERECTION OF BRACKET IN 33 KV LINE |
| 51 | LAYING OF DOG CONDUCTOR IN HT LINE |
| 52 | GUARDING OF LT/11 KV LINE |
| 53 | GUARDING OF 33 KV LINE |
| 54 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 55 | T-OFF CONNECTION COMPLETE 33 KV LINE |
| 56 | CONST.,INST.OF DANGER BOARD/ NUMBER PLATE |
| 57 | CARTAGESP-55 POLE, 0-20 KM |
| 58 | CARTAGESP-72 POLE, 0-20 KM |
| 59 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 60 | HEADLOAD CARTAGESP-55 POLE(0-1 KM) |
| 61 | HEADLOAD CARTAGESP-72 POLE(0-1 KM) |
| 62 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 63 | DISMANTLING OF 33 KV LINE(PANTHER/DOG) |
| 64 | DISMANTLING OF SP-55 TRIPOLE STRUCTURE |
| 65 | Dismantling of AB Cable |
| 66 | DISMAN LT XLPE ABC 3X120+1X95+1X16 Sq.mm |
| 67 | Tightening of Stay Set |
| 68 | Resagging of 33 KV Line |
| 69 | Resagging of LT AB Cable |
| 70 | Laying Earth wire for Earth on 33KV Line |
| 71 | BACK CARTAGE OF PETTY MATERIAL,0-20 KM |
| 72 | Dismantling of ACSR Dog |
| 73 | FIXING OF 33 KV TENSION CLAMP WITH IPC |
| 74 | FIXING OF 33 KV IPC FOR CC TO CC COND. |
| 75 | FIXING OF 33 KV IPC FOR CC TO BARE COND. |
| 76 | FIXING OF 33 KV MID SPAN JOINTING KIT |
| 77 | FIXING OF IPC WITH AL. BAIL FOR EARTHING |
| 78 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 79 | FIXING OF 33KV CABLE TIES |
| 80 | DISCONN & RECONN. OF SERVICE CONN. 1PH. |
| 81 | DISCONN & RECONN. OF SERVICE CONN. 3PH. |
| 82 | Fixing of PG Clamp 120-120 sqmm |
| 83 | LAYING SPREADING,STRINGING AAAC CONDUCT. |
| 84 | RELAYING RESAGGING3x120 SQ.MM AB CABLE |
| 85 | LOOPING AND CHOPPING OF TREE BRANCHES |