| 1 | Supply of Following Material As Per Respo Drawings/Standard Technical Specifications. |
| 2 | 33 KV 3x300 Sqmm Cable Jointing Kit Outdoor Type |
| 3 | GI Pipe 6\" Dia |
| 4 | GI Pipe Clamp With Nut & Bolt 33 KV |
| 5 | HDPE Pipe 140 MM |
| 6 | HDPE Pipe 120 MM |
| 7 | 11 KV 3x120 Sqmm Cable Jointing Kit Outdoor Type |
| 8 | 11 KV 3x120 Sqmm Cable Jointing Kit Indoor Type |
| 9 | 11 KV 3x185 Sqmm Cable Jointing Kit Outdoor Type |
| 10 | 11 KV 3x185 Sqmm Cable Jointing Kit Indoor Type |
| 11 | M.S. Angle 65x65x6Mm, 2700 Mm Long Bracing With 4 Clamp |
| 12 | Ms Base Angle 75x75x6x2028 mm with Clamp & Bolt and nut (T/F Base) |
| 13 | F Clamp For ST Pole |
| 14 | Cross Arm Holding Clamp With Nut & Bolt |
| 15 | Ms Top Channel (125x65x2240 mm) |
| 16 | Stone Pad 300x300x75 Mm |
| 17 | Ms T-Off Channel |
| 18 | 11 KV Disc Insulator 45 Kn |
| 19 | 11 KV Disc Fitting |
| 20 | Ms T-Off Channel Clamp |
| 21 | Clamp With Nut & Bolt |
| 22 | Guarding Angle (M.S. Angle) 65x65x6mm/1.6 Meter long) 5.8 Kg./M=9.28 Kg. |
| 23 | Guarding Angle Clamp |
| 24 | GI Wire 6 Swg |
| 25 | Number Plate |
| 26 | Danger Board With Clamp |
| 27 | Barbade Wire |
| 28 | LT Clamp With Nut & Bolt |
| 29 | Suspension Clamp |
| 30 | I Hook |
| 31 | Dead & Clamp |
| 32 | Distribution Box Clamp |
| 33 | Distribution Box Single Phase |
| 34 | Pearcing Connector |
| 35 | DP Clamp |
| 36 | MS Channel (Dropper) 100x50x2028 mm |
| 37 | 11 KV Do Fuse Set |
| 38 | Erection,Installation And Commissioning of Single Pole LT Overhead Line By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With Centralized And Decentralized Materials.Work Includes All Cartage, Carriage, T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 39 | Erection of Single Pole Structure of 8.5 Mtrs. Long PCC Pole With All Accessories.. |
| 40 | Erection of Single Pole Structure of 11 Mtrs. Long ST Pole With All Accessories. |
| 41 | Concreating of Support With All Raw Material, Labour Etc. |
| 42 | Earthing Complete By MS Earth Rod 6 Swg Earth Wire. Work Includes All Material And Labour Required For Proper Completion of Work. |
| 43 | Erection/Fixing of Stay Complete With Grouting. Work Includes All Material And Labour Required For Proper Completion of Work. |
| 44 | Laying of AB Cable (3x95+1x70+1x16) Sqmm |
| 45 | Installation of Distribution Box Single Phase with Clamp etc. |
| 46 | Centralized And Decentralized Materials To Be Used In Above Work Mentioned Below :- |
| 47 | ST Pole Long 11 Mtr |
| 48 | PCC Pole 8.5 Mtr Long |
| 49 | Laying Of Ab Cable (3X95+1X70+1X16) Sqmm |
| 50 | Lt Clamp With Nut & Bolt |
| 51 | Suspension Clamp |
| 52 | I Hook |
| 53 | Dead & Clamp |
| 54 | Distribution Box Clamp |
| 55 | Distribution Box Single Phase |
| 56 | Pearcing Connector |
| 57 | Erection,Installation And Commissioning of Single Pole 11 KV Overhead Line By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With Centralized And Decentralized Materials.Work Includes All Cartage, Carriage, T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 58 | Erection of Single Pole Structure of 8.5 Mtrs. Long PCC Pole With All Accessories. |
| 59 | Erection of Single Pole Structure of 11 Mtrs. Long ST Pole With All Accessories. |
| 60 | Concreating of Support With All Raw Material, Labour Etc. |
| 61 | Earthing Complete By Ms Earth Rod 6 Swg Earth Wire. Work Includes All Material And Labour Required For Proper Completion of Work. |
| 62 | Laying of ACSR Dog Conductor |
| 63 | Making of Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as RESPO Norms. |
| 64 | Centralized And Decentralized Materials To Be Used In Above Work Mentioned Below :- |
| 65 | ST Pole Long 11 Mtr |
| 66 | PCC Pole 8.5 Mtr Long |
| 67 | V-Type Cross Arm 11 Kv |
| 68 | F Clamp For St Pole |
| 69 | Cross Arm Holding Clamp With Nut & Bolt |
| 70 | MS Top Channel |
| 71 | Stone Pad 300X300X75 Mm |
| 72 | 11 KV Pin Insulator With Nut |
| 73 | ACSR Dog Conductor |
| 74 | MS T-Off Channel |
| 75 | 11 KV Disc Insulator 45 Kn |
| 76 | 11 KV Disc Fitting |
| 77 | Guarding Angle |
| 78 | Guarding Angle Clamp |
| 79 | GI Wire 6 Swg |
| 80 | Erection,Installation And Commissioning of Double Pole 11 KV Overhead Line and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With Centralized And Decentralized Materials.Work Includes All Cartage, Carriage, T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 81 | Erection of Double Pole Structure of 8.5 Mtrs. Long PCC Pole With All Accessories. |
| 82 | Erection of Double Pole Structure of 11 Mtrs. Long ST Pole With All Accessories. |
| 83 | Concreating of Support With All Raw Material, Labour Etc. |
| 84 | Earthing Complete By Ms Earth Rod 6 Swg Earth Wire. Work Includes All Material And Labour Required For Proper Completion of Work. |
| 85 | Erection/Fixing of Stay Complete With Grouting. Work Includes All Material And Labour Required For Proper Completion of Work. |
| 86 | Laying of ACSR Dog Conductor |
| 87 | Making of Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as RESPO Norms. |
| 88 | Mounting of 63/100 KVa T/F On Double Pole Including All Accessories And Connection Thereof. |
| 89 | Centralized And Decentralized Materials To Be Used In Above Work Mentioned Below :- |
| 90 | ST Pole Long 11 Mtr |
| 91 | PCC Pole 8.5 Mtr Long |
| 92 | Cross Brancing Ms Angle |
| 93 | MS Base Angle |
| 94 | V-Type Cross Arm 11 Kv |
| 95 | F Clamp For St Pole |
| 96 | Cross Arm Holding Clamp With Nut & Bolt |
| 97 | MS Top Channel |
| 98 | Stone Pad 300X300X75 Mm |
| 99 | 11 KV Pin Insulator With Nut |
| 100 | ACSR Dog Conductor |
| 101 | MS T-Off Channel |
| 102 | 11 KV Disc Insulator 45 Kn |
| 103 | 11 KV Disc Fitting |
| 104 | Clamp With Nut & Bolt |
| 105 | Guarding Angle |
| 106 | Guarding Angle Clamp |
| 107 | GI Wire 6 Swg |
| 108 | Number Plate |
| 109 | Danger Board With Clamp |
| 110 | Barbade Wire |
| 111 | 63 Kva T/F |
| 112 | 100 Kva T/F |
| 113 | DP Clamp |
| 114 | Dropper Chnnel |
| 115 | 11 KV Do Fuse Set |
| 116 | Erection,Installation, Laying And Commissioning of 33 KV/11 KV CableFor Overhead/Underground Line and Installation of VCB By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With Centralized And Decentralized Materials.Work Includes All Cartage, Carriage, T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 117 | Complete Laying And Commissioning of 33 KV 3x300 Sqmm XLPE Cable In HDPE Pipe By HDD Method. Work Includes Making of Loops, Connection With Double Pole Etc. |
| 118 | Installation of 33 KV 3x300 Sqmm Cable Jointing Kit Outdoor Type |
| 119 | Complete Laying And Commissioning of 11 KV 3x120 Sqmm XLPE Cable In HDPE Pipe By HDD Method. Work Includes Making of Loops, Connection With Double Pole Etc. |
| 120 | Installation of 11 KV 3x120 Sqmm Cable Jointing Kit Outdoor Type |
| 121 | Installation of 11 KV 3x120 Sqmm Cable Jointing Kit Indoor Type |
| 122 | Complete Laying And Commissioning of 11 KV 3x185 Sqmm XLPE Cable In HDPE Pipe By HDD Method. Work Includes Making of Loops, Connection With Double Pole Etc. |
| 123 | Installation of 11 KV 3x185 Sqmm Cable Jointing Kit Outdoor Type |
| 124 | Installation of 11 KV 3x185 Sqmm Cable Jointing Kit Indoor Type |
| 125 | Installation of 11 KV VCB Outgoing |
| 126 | Laying of ACSR Weasel Conductor. |
| 127 | Centralized And Decentralized Materials To Be Used In Above Work Mentioned Below :- |
| 128 | 3X300 Sqmm 33 KV XLPE Cable 33 KV |
| 129 | Cable Jointing Kit Outdoor Type 33 KV |
| 130 | GI Pipe 6\" Dia |
| 131 | GI Pipe Clamp With Nut & Bolt |
| 132 | HDPE Pipe 140 MM |
| 133 | HDPE Pipe 120 MM |
| 134 | 11 KV VCB Outgoing |
| 135 | 3X120 Sqmm 11 KV XLPE Cable |
| 136 | 3X185 Sqmm 11 KV XLPE Cable |
| 137 | 11 KV 3x120 Sqmm Cable Jointing Kit Outdoor Type |
| 138 | 11 KV 3x120 Sqmm Cable Jointing Kit Indoor Type |
| 139 | 11 KV 3x185 Sqmm Cable Jointing Kit Outdoor Type |
| 140 | 11 KV 3x185 Sqmm Cable Jointing Kit Indoor Type |
| 141 | 11 KV Pin Insulator With Nut |
| 142 | MS T-Off Channel |
| 143 | 11 KV Disc Insulator 45 Kn |
| 144 | 11 KV Disc Fitting |
| 145 | Ms T-Off Channel Clamp |
| 146 | ACSR Weasel Conductor |
| 147 | Dismentling of Iron Scrap i.e. Conductor, ST Pole, All. Wire etc. and its carriage to J.E. Store/Store Center Mathura as per direction by supervising engineer. |
| 148 | Process of Payment to Railway Departmentagainst permission of laying 33 KV UG Line across the Railway Crossing (Railway Department). Payment to the contractor of said work will be done on actual tax invoice issued by Railway Department. |