}

Tender For Kseb Line Work Stringing Ht/Lt Line Using Abc At Pokkanamttam Kooroppada Kottayam, kottayam-Kerala

Kerala State Electricity Board has published Tender For Kseb Line Work Stringing Ht/Lt Line Using Abc At Pokkanamttam Kooroppada Kottayam. Submission Date for this Tender is 24-04-2025. Overhead Line Tenders in kottayam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

48585515
Corrigendum : Tender For Kseb Line Work Stringing Ht/Lt Line Using Abc At Pokkanamttam Kooroppada Kottayam
Open Tender
NCB
Kerala
Kottayam
24-04-2025

Tender Details

Kseb Line Work Stringing Ht/Lt Line Using Abc At Pokkanamttam Kooroppada Kottayam- 1 VI work at Pokkanamattom area 2 Providing concrete muffing(0.45x0.45x1.5m)inclusiveofcostofall material (as per specification). 3 Additional rate for providing one discseton any type of HTpolefor making cut point. 4 Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. 5 Fitting5channelcrossarms,ABswitch,DOfuse,LA,HT< connections on existing DP, 3 LT fuses. 6 Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. 7 Drilling hole of various sizes on existing Channel/Cross Arm. 8 Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). 9 Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. 10 Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. 11 Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. 12 Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. 13 Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. 14 AdditionalrateforexcavationofonePitforHTPole/HTStayinSoft Rock. 15 Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. 16 FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP incl. conveyance of materials. 17 ProvidingoneCoilEarthusingGIearthwire,diggingseparatepitat standard distance away from the pole/structure & backfilling. 18 ProvidingTransformerfencing,using50x50x6mmAngleiron,40x6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation 19 Providingyardmetallingwith6mm&40mmthickbluemetalas specified after constructing a curb wall. 20 InstallingoneDTRMeterwithboxonexistingpolesandgivingthe complete connections incl. conveyance of materials. 21 Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. 22 TransportingLTABCbyhiredvehicletoadistanceupto5kmand carring up to 2 drum including loading and un loading using crane 23 Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles 24 Erection of suspension clamp for LT ABC of any size 25 Erection of Anchor clamp / dead end clamp for LT ABC of any size 26 Providing Cable Tie 27 Providing End Caps 28 Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. 29 Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. 30 Renewal of existing damaged/broken old LT stay with existing stay rod. 31 Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. 32 StraighteningoneSlantedLTCutpoleafterunbindingthelineand rebinding the line after work. 33 Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. 34 Cutting Channel/Cross Arm/Angle Iron into two pieces. 35 Providing Strut using LT PSC pole incl. digging & back filling pit. 36 Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). 37 Installation of Pre-insulated straight through joints for 16sqmm cable 38 Installation of Pre-insulated straight through joints for 70sqmm cable 39 Fitting one set AB switch and giving connection 40 FittingoneAdditional2.4m/3mChannelcrossarm(75x40x6mm),in existing 11kV DP incl. conveyance of materials. 41 Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. 42 Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). 43 Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. 44 Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. 45 Stringingofonekm3PH11kVlinewithXLPEInsulatedACSR Raccoon 46 FittingoneAdditional75x40mm,1.8mChannelcrossarminexisting single pole incl. conveyance of materials. 47 Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. 48 Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. 49 DismantlingonedamagedLTTW/RSJ/RailStrutpoleincl.removalof clamps and stacking. 50 Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. 51 Erecting one LT PSC Pole in position incl. digging & back filling pit. 52 Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. 53 AdditionalrateforexcavationofonePitforLTPole/LTStayinHard Laterite. 54 AdditionalrateforexcavationofonePitforLTPole/LTStayinSoft Rock. 55 Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. 56 Providing Stay for LT poles incl. digging & back filling pit. 57 InstallingOneNo.4waySatelliteConnectorofsizeMain:16to95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size 58 Dismantling(withoutdamage)onekmLT3ph4wireOHline,cross arms, insulators and stacking the conductors in rolls. 59 Dismantling(withoutdamage)onekmLTadditionalconductorline, cross arms, insulators and stacking the conductors in rolls. 60 Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. 61 Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. 62 Transportingpolesbyhiredvehicletoadistancebeyond5kmand carrying upto 4 poles. (Running km).

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 19-04-2025 TIME EXTENSION Date 24-04-2025

Key Value

Document Fees
INR 1800 /-
EMD
INR 17900.0 /-
Tender Value
INR 7.14 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail