| 1 | Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 500 KW GROUND MOUNTED SOLAR POWER PROJECT AT KARIYAN & CHALLARA Rates for the Supply of material (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 2 | Supply of SPV Modules as specified in the Tender documents |
| 3 | Supply of Inverters as specified in the Tender documents |
| 4 | Supply of Inverter transformer as specified in the Tender documents |
| 5 | Supply of Panels & Switchgears as specified in the Tender documents |
| 6 | Supply of Module mounting structure as specified in the Tender documents |
| 7 | Spare Modules ( 0.50% of total supply of solar modules) |
| 8 | Mandatory spares excluding modules |
| 9 | Cables ( all DC, LT & HT) |
| 10 | Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents |
| 11 | Part B Rates for installation of 500 kw Solar Power Project,and other allied activities for successful completion of the Solar Power Project |
| 12 | Design, Engineering, Supply, Installation & Commissioning and performance testing of the equipments supplied and other services specified in the tender document. |
| 13 | Civil and allied works for construction of Module mounting structure, foundations etc for all the equipment supplied |
| 14 | Freight, Insurance, Loading unloading, storage at site, handling at site for allied works |
| 15 | Part C RATES FOR OPERATION & MAINTENENACE FOR FIVE YEARS |
| 16 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for first year |
| 17 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Projectfor second year |
| 18 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for third year |
| 19 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fourth year |
| 20 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fifthyear |
| 21 | Operation and Maintenance of the Solar PV Project with BESS for sixthyear |
| 22 | Operation and Maintenance of the Solar PV Project with BESS for seventhyear |
| 23 | Operation and Maintenance of the Solar PV Project with BESS for eigthyear |