Tender For Culvert crossing, soil/debris, painting, wire fencing etc. work in ward no. 24,29,33,43,44 under the municipality area - Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). Sl.No. 692 2 Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). SL.No.694 3 Excavation in foundation in ordinary soil(Loam, clay or sand) Including lift upto1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches. SI.No .51(A) 4 Concrete with 4 cm. gauge stone ballast, coarse sand of 1.25 F.M. and cement. In proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI.No.273 5 M-150 Brick Work in 1:4 cement &coarseSand 1.25 F.M. Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No 305a 6 R.C.C. Work with cement, approved coarsesand & 2 cm (3/4) guage approved stone ballast in proportions of 1:1.5:3 in R.C.C,SLABexcluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials,labour, tools & plants etc. required for proper completion of the work Excludingcost of binding wire Sl No288 7 M 150 (1:4) Brick Work ,coarse sand in superstructureincluding supply of all materials labour T&p etc.required for proper completion of the work . s.i no 305a+309+310 8 12 mm thick plaster (1:4) with cement &Fine sand minimum thickness n-ot to be less than 1 cm including supply of all material labour T&P etc. required for proper completion of the work s.i no 584 new item 9 Supplying, fiting and placing HYSD bar reinforcement in Foundation Complete as per Drawing and technical specifications Clause 1000 and 1202 10 Mild Steel in heaty size in chamber or roilying SI No 502 a 11 Mild Steel in heaty size in chamber or roilying SI No 502 12 E/W in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not be exceeding 0.50 m in depth and earth work in embankment to be in 20 cm. Layers including ramming and dressing the surface to required levels and slop and also including 1.5 m. lift and up to 15 km .SI NO. 253A+261B+231B 13 Cement Concrete with 2cm guage approved (4:2:1)stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work si no. 279 a 14 Laying of interlocking tiles of 60 to 80 mm thick including levelling and dressing of surface up to required level and slopes filling joints with local sand including cost of labour, T&P etc complete But excluding cost of material as directed by Engineer in charge. 15 Supplying & Laying of 80 mm precast cement concrete I -shapeInterlocking paver blocks with top layer of minimum 8 mm thickness having plan dimesion 200x(160+120mm) O.P. Cement , smoot high gloss finish, skid resistant manufactured from rubber moulds through vibro- compression mechanism . The compressive strength of concrete paver block shall not be less than 30Mpa (m-30) and weight 5kg per no. conferming to IS:15658-2006 including cost ofmaterial ,labour ,T&Petc required for proper completion of the work as directed by Egneer-in charge.(ISI MARK INTERLOKING TILES) 16 Disilting of Nala silt i/c of the work (SI No 251+25% for foul posion) 17 12mm thick plaster in 1:4 cement and f-sand with mortar SI No.583 18 12mm thick plaster in 1:4 cement and C-sand with mortar SI No.584 new item 19 Laying of brick laid on (only labour chage) edeg SI No.786 20 Providing & laying SOB brick or laid payment SI No.662B 21 Dismantling of old brick laid on eeged on kharnja i/c sttaking of old work. 22 deduct cost of old brick bats 23 Collection and consolidation of WBM top coat with 22.40- 53 mm gauge stone ballast including supply of stone ballast of approved quarry , royalty. Carriage upto site loading unloading stacking testing charges , trade tax and other taxes, octroy levies to and also including opening out stacks spereading stone ballast to required cambor and templete and making mendies to retain water and also all leads and lifts , water charges, watering and compacting with 8-10 tonne smooth wheeled road rollor, including all hire fuel charges of the rollar and blinding with type B Screening material required for proper completion work . Including all material, labour, T&P, taxes , labour coss etc . complete as per direction of engineer in charge but excluding GST (Mord 405) 24 Construction of granular sub base (GSB) by providing coarse grade material spreading in uniform layers with mortar grade on prepared surface mixing by mix in place method with rotavetar at OMGSB/RBM spreaing in uniform layor mortar grader on prepared surface mix in place method with rotavaror at OMC at compacting with vibratory roller to achive the desired complete surface. 25 Providing wall putty on new surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats. 26 Providing wall putty on OLD surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats. 27 Finishing wall with water proof cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. requied for proper completion of the work.661+662 28 Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesal or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 644+645 29 Distenpering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade ober and including a priming coat. With cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including the surface even with plaster of Paris or approved sunthetic materials and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. 30 Construction of un-reinforced. Dowel jointed at expansion and construction joint only, plain cement concrete pavement, Thickness as per design, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade)(1.1½.3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25mm. mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels.rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing ro lines and grade as per drawing and Technical specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc. 31 supply of barbed wire c/c cortage and loading &unloadingof 8 km lode &contrecter profit c/c allinclude completee of the work s.i.12 e 2021.+5% c.p. 32 Fixing of barbed wire only labour charges.(s.i.no.513)2017 33 Supply and fixing Galvanized corrugated iron roofing 24 B.W.G. in position including supply of all materials, labour, Tools & Plants etc. required for proper completion of the work and including wastage.