}

Tender For Kala Bauji Open Veranda Construction Work. - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Dis, pratapgarh-Rajasthan

Department Of Local Bodies has published Tender For Kala Bauji Open Veranda Construction Work. - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Dis. Submission Date for this Tender is 08-04-2025. Earth Work Tenders in pratapgarh Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

48557232
Tender For Kala Bauji Open Veranda Construction Work. - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Dis
Open Tender
Indian
Rajasthan
Pratapgarh
08-04-2025

Tender Details

Tender For Kala Bauji Open Veranda Construction Work. - Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m 3 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) 4 Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) 5 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete 6 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 7 Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) 8 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. 9 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortarM-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) 10 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) 11 Kota stone slab flooring 25mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :Area of each slab 2001 to 5000 sqcm 12 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete 13 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work 14 Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with wooden plugs and screws or with dash fastener or rawl plugs and screws or with fixing clips or with bolts and nuts as require including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. 15 Providing and laying un-reinforced, dowel jointed, plain cement concrete mix With Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, epansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures (if required) as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including allmaterial, labour, machinery, lighting, guarding and maintenance ofdiversion.PCC M-20 16 Total S.No 02 to 15 Amount 36973.8Say 5.00 Lacs

Key Value

Document Fees
INR 500 /-
EMD
INR 10000.0 /-
Tender Value
INR 5 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail