| 1 | Page No. - 203/3Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface. |
| 2 | Page No. - 198/1Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 3 | Page No. - 1/2 (a) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 4 | P - 24/4 ( Analysis rate )Ordinary Cement concrete ( mix 1:2:4) with graded stone chips ( 20 mm nominal size ) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes. a) Pakur Variety |
| 5 | P - 101/2 A( 3rd Corrigenda, dt - 04.06.2018 )M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing &direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approvedmake and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made byadding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the ratefor each additional floor or 4m. beyond the initial 8 m. or part thereof. ii) For other Structural works like galleries etc. |
| 6 | Page No. - 200/1 (a) (a) Priming one coat on steel or other metal surface with synthetic oilbound primer of approved quality including smoothening surfaces by sandpapering etc. |
| 7 | Page No. - 200/2 (A) Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) |
| 8 | Page No. - 200/1 (b) (b) Priming one coat on plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 9 | Page No. - 197/17 (a)Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. Therate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.(Two Coat)a) Normal Acrylic Emulsion |
| 10 | P - 111/2 Welding in M.S. structural work with gas or electric:(a) Tack weld |
| 11 | GST Item (Effect from 18.07.2022)18 % GST on Estimated Cost of Sl No- 1 to 10 |
| 12 | Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 11 |