Maintenance of Various Sports Complexes.Sub Head : Running Maintenance and Operation of Sub-Station Equipments, DG Sets, IEI , Split AC, Window type AC -Sub-Station , DG Set & IEI Operation and routine maintenance of sub-station equipment having transformers 400 KVA - 1 no. (11 KV/415 V Indoor type) i/c HT panel, L.T. panels, capacitor panels & Floor panels etc. and 1 No. of 125 KVA & 1 No. of 100 KVA D.G. setsi/c other allied panels and Running Maintenance & Operation ofInternal Electrical Installations (IEI) and ExternalLighting including high mast lighting & submerbile pump and operation by deploying following staff as per inventory andadditional Terms and conditions attached etc.complete as reqd.a)Electrician cumOperator-3 Nos.(1 No. in each shift total three shift i.e. 6 AM to 2 PM & 2 PM to 10 PM & 10PM to 6AM )b) Khallasi - 2 Nos. ( 1 No. in each shift total two shift i.e. 6 AM to 2 PM & 2 PM to 10 PM ).(Note:All Tools and Plants (T&P) including tower wagon suitable to maintained fittings mounted up to height 12 Mtrs. shall be made available at the site throughout the contract period by agency.) (biometric machine should be installed 2 De-hydration and filtration of transformer oil for 400 KVA with filter machine at site to maintain the break down value die electric strength of oil at least 50 KV including providing oil testing facility at site for transformer etc as required Qty. 60 Ltr. 3 Servicing of 11KV H.T. VCB 630 Amp Complete with cleaning alignment, adjustment of gaps between phases, lubricating all moving parts adjustment for smooth mechanical operation etc complete as required. 4 Supply of Transformer Oil for Top up Transformer etc. as required. 5 Servicing/ Overhauling Crompton make L.T ACB 1000 Amp with cleaning, alignment, adjustment of gap between phase, lubricating all moving parts adjustment for smooth mechanical operation etc complete as required. 6 Carrying out B Check i/c following items (Element Lub oil Filter 4 Nos. , Kit fuel filter and ring 2 Nos., Kit super BYP filter elem 2 Nos. , Seal O ring 2 Nos. ,Inhibitor Corrosion 10 Ltr 1 NO. , Strip test 1 No. Volvo line Premium Blue 7800 Plus1/210 1 No. Kit Air Cleaner Elements (K QK V Series) 2 Nos. Freight charges Towards the Maintenance service charges for your Cummins DG set 1 No. .)of the individual D.G Set (Capacity 125 KVA, Jackson/CumminsMake, from OEM / authorized dealer. 7 Carrying out B Check i/c following items (Element Lub oil Filter 4 Nos. , Kit fuel filter and ring 2 Nos., Kit super BYP filter elem 2 Nos. , Seal O ring 2 Nos. ,Inhibitor Corrosion 10 Ltr 1 NO. , Strip test 1 No. Volvo line Premium Blue 7800 Plus1/210 1 No. Kit Air Cleaner Elements (K QK V Series) 2 Nos. Freight charges Towards the Maintenance service charges for your Cummins DG set 1 No. .)of the individual D.G Set (Capacity 100 KVA, Kirloskar Make, from OEM / authorized dealer. 8 Supplying of following sizes of FRLS PVC insulated copper conductor, single core cablecomplete as required. (DSR-2022)1 x 1.5 sq. mm 9 1 x 2.5 sq. mm 10 1 x 4 sq. mm 11 Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. (DSR-2022)5/6 A switch 12 15/16 A switch 13 3 pin 5/6 A socket outlet 14 6 pin 15/16 A socket outlet 15 Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, C curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete withconnections, testing and commissioning etc. as required. (DSR-2022) Single pole 16 Double pole 17 Triple pole and neutral 18 Supply and replacement (including deduction of cost for replaced item) of following LED lights with all accessories i/c connection interconnection and testing etc as required.a) 18 watt aluminum batten (1200 MM Long) LED light with IP:20 fixed on surface of wall and roof. 19 Supply and replacement of 1200 mm sweep, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, Power Factor not less than 0.9, Service Value (CM/M/W) minimum 6.00, Air delivery minimum 210 Cum/Min , 350 RPM (tolerance as per IS : 374-2019), THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing etc. complete as required. (DSR_2022) 20 Supply and replacement (including deduction of cost for replaced item) of 400 mm sweep wall Fan with connection testing etc. as required. 21 Supply and replacement (including deduction of cost for replaced item) of Plastic ventilation Fan size 300 mm single phase, fixing the same on existing opening with suitable nut bolt fixture and plywood after cutting making hole in plywood, connection, testing etc as reqd. 22 Lowering of sub. Pump set in the existing bore well up to the required depth along-with existing G.I pipes and accessories etc. i/c dismantling of G.I pipe and disconnection the sub. 23 Lifting out of sub. Pump set from the exiting bore well up to the required depth along-with existing G.I pipes and accessories etc. i/c dismantling of G.I pipe and disconnecting the sub. Cable etc. Complete as reqd. 24 Repairing & rewinding of following capacity 3 phase Mono block pump sets including cartage, dismantling, reassembling, supplying & replacement/ repairing of damaged parts of pump sets and making good for operation including connection testing, painting etc complete as required.a)Sub.bore pump set 5HP/7.5HP 25 Comprehensive AMC of following fountain installed at DSC as per inventory attached in Annexure B.a) Dandelion Fountain 26 b) Turn dome fountain 27 Split AC, Window type AC & Water CoolerRoutine preventive maintenance Split/Window type AC units and Water Cooler day by 1 No Operator and 1 No Khallasi attending & removal day to complaints cleaning of filter and grills of Split AC and cleaning of Water Cooler tank etc. as required. (weekly or as & when required)Details of installation are given in Annexure A & schedule of routine & preventive maintenance is given in Annexure B. 28 Supplying and charging of R-22/R-410 Gas in the AC units including Pdg & fixing necessary copper piping, capillary tube including pressure testing, leak detecting and commissioning etc, complete required at site.a) 2.0 TR Split type AC units 29 Rewindingoffanmotorof2.0TRSplittypeACunitsandWaterCooler(capacity150Ltr)i/c replacement of gun metal bushes, testing, commissioning etc as required. 30 Servicing of Water Cooler (Capacity up to 180Ltr) i/c cleaning and washing, draining etc as required 31 Supplying and Replacement of (including deduction of cost for replaced item) following hermetically sealed type section cooled Reciprocating/Rotary compressor unit operating on Refrigerant Gas of nominal capacity in the existing 2.0 TR Split AC units/Water cooler (capacity 150 Ltr) i/c dismantling the existing compressor making refrigerant and electrical connection, pressure testing vacuuming and charging the Refrigerant Gas (to be provided by firm within quoted rates) etc as required. 32 Supply and Replacement of following parts of 4 KVA or existing voltage stabilizer etc connection testing etc. as required.a) Time delay relay 33 b) Low and high voltage trip with time delay relay 34 Repairing of existing PCB of split/window ac i/c cost for removing, re-installation and re-commissioning etc. complete as required. 35 Supply and replacement (i/c deduction of cost for replaced item) of copper piping for refrigerant flow (Liquid & gas) between indoor and outdoor unit of split AC complete with suitable insulation, tie rod, hanger etc. complete as required. 36 ServicingofSplit/WindowTypeAirConditionersi/ccleaningandwashingfilter,drainingetcas required. 37 RO SystemMaintenance Contract for RO 150/50 L.P.H (Summer Session) 38 Maintenance Contract for RO 150/50 L.P.H (Lean Period / Winter Session) 39 Supply and Replacement of following parts of 150/50 L.P.H connection testing etc. as required.a) RO Booster Pump for 50 ltr 40 b) Membranes for 50 ltr RO 41 c) Filter (20”) for 50 ltr RO 42 d) Filter (10”) for 50 ltr RO 43 e) Pipe 1/4 or 1/3 inches for 50 ltr. 44 f) Adapter 24 to 48 Volt for 50 ltr RO 45 g) Auto Switch for 50 ltr. RO 46 Fire ExtinguisherRefilling & repainting of following type fire extinguisher installed in different location at Various Sports Complexes i/c testing etc complete as required.Water Type Fire Extinguisher (Stored Pressure) capacity 9Ltr. 47 Co2 Type capacity 4.5 Kg. 48 ABC Type (Stored Pressure) capacity 5 Kg.