Execution Of Contract Towards Extension Of Supply Works For Capital, Improvement,Dcw Works Of Sivagiri Sub Division Of Kadayanallur Division-- 1 Normal groundExcavation of pole pit (1.25m * 0.5m*1.5m)7.32m, 7.5m, 8m, 8.23m Poles 2 Normal Ground Erection of7.32m, 7.5m, 8m, 8.23m Poles 3 Rocky ground Excavation of pole pit (1.25m * 0.5m*1.5m)7.32m, 7.5m, 8m, 8.23m Poles 4 Rocky ground Erection of7.32m, 7.5m, 8m, 8.23m Poles 5 Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles 6 Normal Ground Erection of9m, 9.14m Poles 7 Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36 8 Normal Ground of erection of 36 RSJ pole 9 Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles 10 Rocky Ground of Erection of9m, 9.14m Poles 11 Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36 12 Rocky Ground of erection of 36 RSJ pole 13 Transporting of poles fromroad side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles 14 Transporting of poles fromroad side to pole pit -9m,9.14m RCC/PSC pole 15 Transporting of poles fromroad side to pole pit -36 RSJ pole 16 Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles 17 Loading and Unloading of Poles-9m,9.14m RCC/PSC pole 18 Loading Unloading of poles-36 RSJ pole 19 Loading Unloading of linematerials 20 Concreting of pole as per Board Standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat. 21 Coping of pole (0.6m*0.6m*0.35m) 22 Concreting of stay (0.3m * 0.3m * 1.5m) including materials except cement. 23 Coil earthing per pole & pole earthing 24 Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m)withtransporting of materials to site (for Stay Set) 25 Normal Ground -Erection of Stay Set 26 Rocky Ground-Excavation of stay pit (1.00m * 0.5m*1.5m)withtransporting of materials to site (For Stay Set) 27 Rocky Ground -Erection of Stay Set 28 Fixing of V & Channel Cross Arm 3.5 including transporting of materials from road side to site 29 Fixing of V & Channel Cross Arm 4.5 including transporting of materials from road side to site 30 Fixing of 3 phase Cross Armincluding transporting of materials from road side to site 31 Fixing of 1 phase Cross Armincluding transporting of materials from road side to site 32 Fixing of HT LT TI Fitting including transporting of materials from road side to site 33 Erection of HT side arm with stud including transporting of materials from road side to site 34 Erection of LT side arm with stud including transporting of materials from road side to site 35 Fixing of insulator (per location) including transporting of materials from road side to site 36 Fixing of Tapping Channel X Arm 37 Fixing of 11 KV Strain Disc 38 HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire) 39 HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire) 40 HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/4.09 ACSR (1 Span/wire) 41 For HT line clear works for 7/2.59 ACSR (1 Span/wire) 42 For HT line clear works for 7/3.35 ACSR (1 Span/wire) 43 For HT line clear works for 7/4.09ACSR (1 Span/wire) 44 LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire) 45 LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire) 46 For LT line clear works for 7/2.59 ACSR (1 Span/wire) 47 For LT line clear works for 7/3.35 ACSR (1 Span/wire) 48 Spilt Neutral Guarding 49 Flat Guarding 50 Erection of Transformer /Dismantling upto 200 KVA 51 Erection of Transformer/Dismantling250 KVA 52 Erection of feeder cable with open type fuse unit per feeder 53 Erection of feeder cable with open type fuse unit per feeder and for each addl feeder 54 Erection of feeder cable Bus bar arrangement with open type 55 Erection of DT metering 56 Loadingof Distribution transformer below 250KVA 57 Unloading of Distribution transformerbelow 250KVA 58 Loadingof Distribution transformer250KVA 59 Unloading of Distribution transformerbelow 250KVA 60 Erection of centre Support ( incl. Concrete) 61 Dismantling of Center support 62 Alteration of clamps 63 Drilling less than 23 mm holes per hole/slatted hole 64 Cutting of channel 65 Cutting of Flat 66 Cutting of Angle 67 RSJ Pole Cutting 68 LT-Changing of pin point to cut point 69 HT-Changing of pin point to cut point 70 Erection ofservice connection materials -Single phase 71 Erection ofservice connection materials -Three Phase 72 Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., 73 Dismantling of poles without concrete in damaged condition including grill separation etc., 74 Providing jumpering at cut point 75 Tree clearance in HT or LT locationFor ordy. Tree clearance and Throng bushes & trees Each Labour /Head/Day 76 Tree clearance in HT or LT locationFor coconut Trees and palmrah tree each Labour/Head/Day 77 Set right of leaning of HT pole or LT pole including X arms, TI fittings 78 Resagging of Conductor 7/2.59 79 Resagging of Conductor 7/3.35 80 Resagging of Conductor 7/4.09 81 Erection of Tapping Structure ( Double pole) complete as per TNEB standard including painting 82 Erection ofDistribution Transformer double pole Structure complete as per TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer 83 Erection of of 11 KV Single pole Structure including erection of DT complete as per TNEB TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer 84 Erection of Guarding X arm 85 Dismantling of Stay Set complete including stay rod 86 Dismantling of Stay set complete Without Stay rod 87 Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils 88 Dismantling of conductor of 7/3.35including transporting the conductors to the nearset road side and stocking in coils 89 Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils 90 Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side 91 Dismantling of V Cross arm 92 Dismantling of 3 Phase X Cross Arm 93 Dismantling of Single phase X Cross 94 Dismantling of HT/LT TI Fitting 95 Dismantling of HTpin insulators 96 Dismantling of LT pin Insulators 97 Dismantling of strain Disc 98 Dismantling of Tapping/Guarding channel X Arm 99 Hiring of JCB 100 Hiring of crane 101 Exceeding 1 hour for every Hour 102 Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down) 103 Beyond 20 KM for every KM