| 1 | Earth work in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but excluding lateritc or sand stone ) includig removing , spreading or stacking the spoils within a lead of 75m as directed .The item includes necessary trimming the bottom, bailing out water as required complete. |
| 2 | (a) Depth of excavation not exceeding 1.500 mtr. |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 mtr. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns lintels curved or straight including fitting fixing and striking out after completion of works. |
| 4 | 25mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 5 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m |
| 6 | Ordinary cement concrete( Mix 1:1.5:3 ) with graded stone chips (20mm.) excluding shuttering and reinforcement if any,in ground floor as per relevant IS codes. |
| 7 | a) River bazree |
| 8 | Labour charges for fitting & fixing the board in position all complete. |
| 9 | Transportation Charges for delivery of Display Board at Site. Avg. distance considered = 80 KM,1 (One) no. truck will carry = 10 nos. board. Therefore, for 1 (One) no. board, trip will be (1/10) i.e. 0.1 Trip |
| 10 | Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials. |
| 11 | Composing & designing the display matter in DTP based software. |
| 12 | Vinyl pasting on 0.9 m x 0.6 m size display board |
| 13 | Priming one coat on steel and other metalsurface with synthetic enamel/ oil bound primer of approved quality including smooth ening surfaces by sand papering etc. |
| 14 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc, on the surface if necessary:(a) On steel or other metal surface. |
| 15 | i)Two coats (with any shade except white.) |
| 16 | Add GST @ 18% |
| 17 | Add Labour Wlfare Cess @1% |