| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-04-2025 | Corrigendum date extend | Date | 21-04-2025 |
| Sl. No. | Item Description |
| 1 | CONSTRUCTION OF OHT |
| 2 | Supply all materials, labours and t&p etc. required at the site of work and construct R.C.C. over head tank abovementioned capacity and staging staging including the cost of construction of following appurtenant works. |
| 3 | 2 Column Stair Case |
| 4 | 1m wide R.C.C. stair case from ground upto the balcony ofthe tank |
| 5 | Lightening conductor as per Indian electricity rules. |
| 6 | Water level indicator as per deptt. specification |
| 7 | 20 mm. S.S. pipe (light quality) railing with 50 x 50 x 6 mm. 1.2 m. high angle iron posts1.5 m. c/c on both sides of the stair case (pipe in 3 rows) and balcony (pipe in 3 rows) |
| 8 | 50cm. wide M.S. ladder with 50x50x6 angle iron and 20 mm. rungs at 25 cm. c/c/, from balcony to the top dome of the tank and from there to the bottom dome of the tank inside it. |
| 9 | 60x60 cm. M.S. manhole cover (light pattern)with locking device. |
| 10 | Supply, erection, fixing in position and jointing of following D.I.D/F pipes with sluice valves and specials |
| 11 | ISI marked D.I.D/F pipes, class \"A\" as per IS-1537/1960 |
| 12 | Outlet - 350 mm - 22m |
| 13 | Outlet - 350 mm - 22m |
| 14 | Over flow - 350 mm - 25m |
| 15 | Washout - 100 mm - 22m |
| 16 | ISI marked C.I.D/F sluice valves as per IS- 780/1969 |
| 17 | Outlet -350 mm |
| 18 | Washout - 100 mm - 1 No |
| 19 | ISI marked d.I.D/F specialsas per IS 1538 |
| 20 | Clamping the vertical pipes with columns by clamps of 50 x 6mm. M.S. flat 1.5m c/c/ including the cost of all jointing materials such as nut bolts and washers etc. |
| 21 | Weather coat painting on outer surfaces of R.C.C. work with ISI marked cement paint in 3 coats. |
| 22 | Painting of M.S. ladder, railing and vertical pipes with ISI marked enamel paint in 3 coats. |
| 23 | Floor and apron at the ground level upto 15cm. beyond the entire projected area of the O.H.T. with 25mm. 1:2:4 P.C.C. over 75 mm., R.C.C. 1:1.5:3 (minimum steel to be provided) as per deptt. specifications. |
| 24 | Sluice valve chambers - 2 Nos. (As per type design) |
| 25 | Testing of tank for water tightness etc. for propoer completion of the work. |
| 26 | Site. clearance |
| 27 | Zone-4A (1400 KL /18M) |
| 28 | Zone-5A (500 KL /20M) |
| 29 | Provision for soil investigation |
| 30 | Rising Main |
| 31 | Supply, Carting, Laying & Jointing of ISI marked S&SCentrifugally Cast (Spun) DuctileIron pipesas per IS : 8329-2000 suitable for Push on jointing by compatible rubber gasket confirming to IS : 9523 : 1980 at divisional store including all taxes |
| 32 | 200 mm dia |
| 33 | Supply, Carting, Laying & jointing of following size screwed down type C.I. single ball air valves. |
| 34 | 50 mm dia |
| 35 | Supply, Caritng & fixing of the following dia DI butterfly/sluicevalves,classI,workingpressure10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, includingvalve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 36 | Sluice valve |
| 37 | 200 mm dia |
| 38 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design(with RCC cover) |
| 39 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 40 | Provision of construction of RCC thrust block of grade M-20 for water hammer at bends of pipe. |
| 41 | Supply of reinforcement including cutting bending etc complete for surface reinforcement. |
| 42 | Provision for crossing of nala, road, culvert excluding supply of C.I. tyton pipe/MS pipe and specials, but including their laying, jointing etc. complete. |
| 43 | More than 1.0M (Avrage rate more than 1 meter) |
| 44 | Less Than 1.0M (Avrage rate more than 1 meter) |
| 45 | Distribution System |
| 46 | Supply, Carting, Laying & Jointing of following sizes HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer -in - charge. Rate is inclusive of supply of HDPE electrofussion speicals. |
| 47 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 48 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 49 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 50 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 51 | Supply, Carting Laying & jointing of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest/relevant I.S. specifications suitable for D.I pipes as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading unloadingbut excluding the cost of trenches. All complete as per instructions of Engineer -in - charge. Rate is inclusive of supply of DI Pipe speicals. |
| 52 | 200 mm dia DI Pipe K-7 |
| 53 | 250 mm dia DI Pipe K-7 |
| 54 | 300 mm dia DI Pipe K-7 |
| 55 | 350 mm dia DI Pipe K-7 |
| 56 | 400 mm dia DI Pipe K-7 |
| 57 | 500 mm dia DI Pipe K-7 |
| 58 | Supply, Caritng & Fixing of the following dia DI butterfly/sluicevalves,classI,workingpressure10Kg/cm2 confirming to IS: 780/1969 or its latest amendments, includingvalve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 59 | Sluice valve |
| 60 | 80 mm dia |
| 61 | 100 mm dia |
| 62 | 150 mm dia |
| 63 | 200 mm dia |
| 64 | 250 mm dia |
| 65 | 300 mm dia |
| 66 | 350 mm dia |
| 67 | 400 mm dia |
| 68 | 500 mm dia |
| 69 | 80 mm dia (Scoure valve) |
| 70 | Supply, Carting & Fixing ofsingle / double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 71 | 50 mm |
| 72 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S. specifications including all taxes and insurance up to site of work (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer ‐in ‐ charge. |
| 73 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. (OD+600)mm |
| 74 | In ordinary soil |
| 75 | Carting from store to site of works(upto 8Km. or within municipal limit which is more) of 80mm dia size flanged fire hydrant to site of work, fixing them in position for flanged joints . |
| 76 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 77 | Surface box type including supply and fixing of 150mm x 150 mm size surface box. (upto 125 mm dia valve) |
| 78 | Masonry type with RCC cover (more than 150 mm dia valve) |
| 79 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design(with RCC cover) |
| 80 | Supply of all materials, labour, T&P etc. and construction of fire hydrant chamber complete required for proper completion of the work as per type design(with RCC cover) |
| 81 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3,forpipeline,includingsupplyofMS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 82 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with wire at every inter-section, complete as per drawing and direction. |
| 83 | Making Nala crossing falling on alignment of pipe line including cost of D.I. pipe one no. (5.50m length) including supply of all materials, labour, T&P, etc complete required for proper completion of work. |
| 84 | width 0.3 m to 0.5 m |
| 85 | width 0.5 m to 1.0 m |
| 86 | width 1.0 m to 1.5 m |
| 87 | width 1.5 m to 3.0 m |
| 88 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 89 | Bituminous Road as per NP specs |
| 90 | Bituminous Road as per PWD specs |
| 91 | Brick Road (BOE) |
| 92 | CC Road |
| 93 | Inter locking tile Road |
| 94 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 95 | Bituminous Road as per NP specs |
| 96 | Bituminous Road as per PWD specs |
| 97 | Brick Road (BOE) |
| 98 | CC Road |
| 99 | Inter locking tile Road |
| 100 | Road Crossing - Excavation in foundation of trench of proper size in soil mixed with moorum, Shingle, Kankar, soft rock, hard rock, including refilling, dressing and ramming earth or sand or bajri, ballast, including providing, supply, carting, lowering, laying and jointing of casing pipe of RCC NP-3 with appropriate size, with rubber ring joint, sand filling in gap insidepipe, insertion of distribution pipe into the encasing pipe including supply of T&P, including concrete of 150 mm thick in with 40mm gauge brick ballast local sand and cement in proportion of 8:4:1, provision for barricading, labour for traffic diversion etc. Complete for proper completion of work as per instruction of Engineer. |
| 101 | 100 mm dia. Pipe |
| 102 | 150 mm dia. Pipe |
| 103 | 200 mm dia. Pipe |
| 104 | 250 mm dia. Pipe |
| 105 | 300 mm dia. Pipe |
| 106 | 400 mm dia. Pipe |
| 107 | Providing ISI mark, G.I. Pipe, Carting, laying & Jointing of following class and dia excluding GST levied by GOI & GOU in all respect, inspection charges, transportation to stores, etc. complete as per IS- 1239/2004. Note:- One coupler shall be provided with each full length of pipe cost of which is included in rates below. |
| 108 | Medium Class |
| 109 | 80 mm (8.64 kg/m) |
| 110 | 100 mm. (12.40 Kg./m) |
| 111 | 150 mm. (19.70Kg./m) |
| 112 | Shifting of Existing Services of existing services like electric pole, telephone pole, gas pipe line, water line, house connections repair, and repair of septic tanks, which are constructed on road etc during the execution of work as per requirement |
| 113 | House Connection |
| 114 | Making House connection in nominal dia. New/Existing distribution mains with fixing of saddle piece, service connections, fittings, and fixing of G.M. Ferrule of 15 mm size inculding tapping the main etc complete in all respect as directed by Engineer-in-charge. |
| 115 | 90mm to 110 mm Dia |
| 116 | 140mm to 160 mm Dia |
| 117 | 200mm to 250 mm Dia |
| 118 | 300 mm to above Dia |
| 119 | CWR |
| 120 | Construction of Clear Water Reservoir (CWR) with pump house and chloronome of following Capacity includingsupply of structural drawing and design,supply of all materials, labour and T&P etc complete as per detailed design and drawing supplied by the contractor and approved by the compitent authority with construction of screen channel and fabrication and installation of screens. |
| 121 | 400 KL |
| 122 | PUMP HOUSE CUM CHLORONOME |
| 123 | Construction of Pump House- Cum-Chloronome with bypass chamber of size 3.60 x 3.0 M x 3.6 & 1.80 x 1.20 x 3.0 M including supply of all materials, labour, T&P etc. required for proper completion of work as per departmental type design. |
| 124 | BOUNDRY WALLAROUND WATERWORKS CAMPUS, GATE, SITE DEVELOPMENTAND APPROACH ROAD,MCS ROOM |
| 125 | Supply of all materials, labour T&P etc. for construction of boundary wall as per departmental type design at water works required for proper completion of work. |
| 126 | Supply and fixing of 3.60 m wide main gate & 1.20 m wide wicket gate including construction of pillars as per departmental type design including supply of all materials, labour, T&P etc. required for proper completion of works. |
| 127 | Provide all meterial, labour, T&P etc. required for proper completion of work including leveling, dressing for development of water works site. |
| 128 | Filling of carted earth in water works campus. |
| 129 | Supply of all materials, labour T&P etc. and construct Interlocking road in water works compound. |
| 130 | Construction of 300x300 mm size drain |
| 131 | Construction of Artificial Recharging of Ground water hrough roof top rain water of pump house, bypass chamber’s water & overflow of O.H.T. supplying of all material, pipes, grates, etc. complete in all respect. (Unit Estimate Attached) |
| 132 | INTERCONNECTION WORK OF NEW PIPE TO EXISTING PIPE |
| 133 | Providing and Laying of different dia pipe interconnection work of New pipe to Existing pipeline. |
| 134 | 90mm to 110 mm dia HDPE Pipe |
| 135 | 140 mm dia HDPE Pipe |
| 136 | 160 mm dia HDPE Pipe |
| 137 | 200 mm dia HDPE Pipe |
| 138 | 250 mm dia DI Pipe |
| 139 | 300 mm dia DI Pipe |
| 140 | 350 mm dia DI Pipe |
| 141 | 400 mm dia DI Pipe |
| 142 | Unforseen items for completion of Work. |
| 143 | RENOVATION WORKS FOR EXISTING OVER HEAD TANK (1400 KL 20 M Staging) |
| 144 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after . The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: -This item to be used for maintenance work judicially , necessary deduction for scaffolding in the existing item to be done. |
| 145 | Surface Preparation:- Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge |
| 146 | 25mm average thickness |
| 147 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry , all complete as per direction of Engineer-In-Charge. Bars above 12 mm dia |
| 148 | Provision of following works-Provison for the surface of structure to be treated for strengthening to be roughened properly either by raking joints or by hacking the cement concrete surface with a specially made hacking tool or other wise alternatively to make the surface rough and dust free byproviding spatter key or wire brush. |
| 149 | Injection grouting in vertical surface/wall Placing and fixing nozzle by drilling machine in tank wall having minimum dia of Nozzle 15mm and provided on a regular interval not exceeding 1mincluding construction joints.Injection of pidicrete AM (polymer based on shrinkage high strength grout) admixed with cement through nozzles under pressure by sump @ 250 gmsper bag of cement. Sealing the nozzle after grouting with Polymer product mixed with cement. |
| 150 | Repairing of spalled and lose concrete where reinforcement is exposed apply like fixit rust remover by means of brush to the reinforcement for clearing bars and steel surface then apply a bonding coat of acreylic based polymer with cement slurry in 1:1 ratio to the pre-wet cencrete by brush. Now apply the mixture of 1:1 cement, coarse sand to the prepared substrate when primer becomes tacky. of 50 mm thick M25 grade.(Taking 20% of total surface area of OHT) |
| 151 | Change of S.S. ladder inside the tank, repair of M.H. cover of top dome, change of masquoto jali with new one complete. |
| 152 | Supply and fixing of 20 mm diaG.I. pipe railling in stair case and balcony.Taking only 50% new and 50% old materials) |
| 153 | Supply and fitting of lighting conductor on top dome and making earthing with required earthing wire from top to bottom of tank as per direction of engineer in charge. |
| 154 | 100 mm thick 1:4:8 plain cement concrete and 100 mm thick RCC M15 flooring with apron with 3mm floating coat of neat cementincluding supply of all materials, labour, T&P etc complete. |
| 155 | Painting of outer surface of OHT from Top to bottom with weather proof paint (like apex etc.) as per direction of engineer incharge. |
| 156 | RCC work with cement, coarse sand and 20mm gauge approved stone ballast in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and fixing and binding the same with 0.50mm thick binding wire (to be supplied by the contractor) centering and supply of all materials, labour, T&P etc. required for proper completion of the work. |
| 157 | Mild steel or iron work in plain work such as R.C. or R.B. work (When not included, in over all rates) brought to required shape, as necessary including binding for proper completion of work including supply of steel and wastage. |
| 158 | 1st class brick work in 1:4 cement and Coarse sand mortar in damaged portion of boundary wall including supply of all materials labour, T&P etc. required for proper completion of the work. |
| 159 | 12mm thick plaster with cement mortar consisting cement coarse sand in ratio 1:4 work minimum thickness not to be less than 10mm on boundary wall including supply of all materials, labour T&P etc. required work. |
| 160 | Painting on boundary wall with one priming coat and one coat of approved exterior paint like Apex including supply of all labour, material T&P etc. required for proper completion of work. |
| 161 | Painting on iron work in small areas with one coat priming and one coat of approved paint including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 162 | Dismantling of reinforce Cement concrete or reinforce brick work including sorthing and stacking of serviceable of disposal of unserviceable material within a distance of 50m. |
| 163 | Removal of silt and dismantle concrete debris deposited inside the container portion and its desposal, washing, disinfecting & cleaning etc. complete. |
| 164 | Supply of all material,labour, T&P etc. for fixing of additional vertical pipe for existing OHT of 20 m staging |
| 165 | DISMANTLING OF EXISTING OVER HEAD TANK (1400 KL 18 M Staging) |
| 166 | Dismantling ofESRs ofvariouscapacities and heights using crane (10 MT capacity) and handing overM.S./ C.I./G.I. pipes, valves, bends,etc.to theDepartment.However takingsteelreinforcementby the dismantling agencyincluding removing dismantled materialsfrom siteanddisposingthemat suitable place as directed, etc. complete. (Capacity of OHT about 1400Kl/18M |
| 167 | Electrical And Mechanical Work |
| 168 | Zone 1 |
| 169 | Construction of Tubewell: |
| 170 | Drilling of Borehole for Tubewell construction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc. |
| 171 | Transportation, Erection, Dismantling of Rig Machine |
| 172 | Drilling of 600 mm. dia bore from G.L. to 60 m |
| 173 | Drilling of 500 mm. dia bore from 61 M to 100 m |
| 174 | Drilling of 500 mm. dia. Bore from 101 M to 200 M |
| 175 | Logging of bore hole by departmental/Approved electric logger |
| 176 | Zone Testing in water quality problem areas including all required material, labour, T&P etc. complete in all respect |
| 177 | Tubewell assembly : |
| 178 | M.S. tubewell assembly with all required parts like plain, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & per typed design complete in all respect. As per IS- 4270 |
| 179 | 300 MMØ Housing Pipe 7.1 mm thick |
| 180 | 200 MMØ Plain Pipe 7.1 mm thick |
| 181 | 200 MMØ Slotted Pipe 7.1 mm thick |
| 182 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. |
| 183 | 300 mm. dia. Housing Pipe from G.L to 54 M BGL |
| 184 | 200 mm. dia Plain/Slotted Pipe 54 M. BGL to 100 M BGL |
| 185 | 200 mm. dia Plain/Slotted Pipe 101 M. BGL to 200 M. BGL |
| 186 | Pea Gravel (lalkuan) |
| 187 | Transportation, Installation Dismantling of 350 PSI Compressor |
| 188 | Charges for Development by 350 PSI Compressor per hour |
| 189 | Transportation, Erection Dismantling of 3 Cusec OP Unit and Yield test. |
| 190 | Charges for Development of TW by 3 Cusec OP Unit |
| 191 | Chemical and Bacteriological Test of water sample from departmental/ approved Lab. |
| 192 | Watch & Ward during construction period. |
| 193 | Barricading around the pit to prevent any posible Accident |
| 194 | Pumping Plants for above tubewells at zone 1 |
| 195 | SITC of 1200 LPM, 30 M head (both tentative) for zone 1 tubewells Pumping plant consisting of control panel having soft starter (item as mentioned below) alongwith by pass star delta Starter, capacitor bank, breakers , cable, complete in all respect with all required material T&P labour etc. SITC of Main Piping (150mm,7.1mm thickness) & reflux valves with 24 mtr. Column pipe, Power wiring, earthing, painting, Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with all required material , T&P labour |
| 196 | Supply of SCADA Compatible chlorination system |
| 197 | Spare Column Pipe 3 M Long heavy Duty |
| 198 | SITC of servo Stabilizer 15 KVA (110-300V)/(240V-500V) or suitable capacity |
| 199 | Sluice valves with motor operated actuator of size 150 mm or suitable size for rising main & bypass line |
| 200 | CE/UL Certified electromagnetic flowmeter of size 150mmor suitable size |
| 201 | Soft starter 15 HP or suitable capacity |
| 202 | CE/UL Certified hydrostatic type sub soil watel level transmitter for T/W |
| 203 | CE/UL Certified Pressure transmitter |
| 204 | Complete cabling of tubewell including all power & control cable for T/W |
| 205 | Automation of Units of T/W |
| 206 | CE & UL Certified RTU/PLC in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & power supply with analog & digital parameters & features as specified for T/W to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 207 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 208 | CE/UL Certified Intelligent energy meters |
| 209 | Auto phase reversal Unit 100 Amp or suitable size |
| 210 | CE/UL Certified Surge Protector for control panel |
| 211 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 212 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 213 | Security Survelliance IP Camera |
| 214 | Installation,Testing and commissioning |
| 215 | Trial run 3 months |
| 216 | Trial and run of each tubewell for 3 months including chlorination and operating staff excluding electricity |
| 217 | Zone 2A |
| 218 | Construction of Tubewell: |
| 219 | Drilling of Borehole for Tubewell construction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc. |
| 220 | Transportation, Erection, Dismantling of Rig Machine |
| 221 | Drilling of 600 mm. dia bore from G.L. to 60 m |
| 222 | Drilling of 500 mm. dia bore from 61 M to 100 m |
| 223 | Drilling of 500 mm. dia. Bore from 101 M to 200 M |
| 224 | Logging of bore hole by departmental/Approved electric logger |
| 225 | Zone Testing in water quality problem areas including all required material, labour, T&P etc. complete in all respect |
| 226 | Tubewell assembly : |
| 227 | M.S. tubewell assembly with all required parts like plain, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & per typed design complete in all respect. As per IS- 4270 |
| 228 | 300 MMØ Housing Pipe 7.1 mm thick |
| 229 | 200 MMØ Plain Pipe 7.1 mm thick |
| 230 | 200 MMØ Slotted Pipe 7.1 mm thick |
| 231 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. |
| 232 | 300 mm. dia. Housing Pipe from G.L to 54 M BGL |
| 233 | 200 mm. dia Plain/Slotted Pipe 54 M. BGL to 100 M BGL |
| 234 | 200 mm. dia Plain/Slotted Pipe 101 M. BGL to 200 M. BGL |
| 235 | Pea Gravel (lalkuan) |
| 236 | Transportation, Installation Dismantling of 350 PSI Compressor |
| 237 | Charges for Development by 350 PSI Compressor per hour |
| 238 | Transportation, Erection Dismantling of 3 Cusec OP Unit and Yield test. |
| 239 | Charges for Development of TW by 3 Cusec OP Unit |
| 240 | Chemical and Bacteriological Test of water sample from departmental/ approved Lab. |
| 241 | Watch & Ward during construction period. |
| 242 | Barricading around the pit to prevent any posible Accident |
| 243 | Pumping Plants for above tubewells at zone 2A |
| 244 | SITC of 1200 LPM, 30 M head (both tentative) for zone 2 tubewells Pumping plant consisting of control panel having soft starter (item as mentioned below) alongwith by pass star delta Starter, capacitor bank, breakers , cable, complete in all respect with all required material T&P labour etc. SITC of Main Piping (150mm,7.1mm thickness) & reflux valves with 24 mtr. Column pipe, Power wiring, earthing, painting, Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with all required material , T&P labour |
| 245 | Spare Column Pipe 3 M Long heavy Duty |
| 246 | SITC of servo Stabilizer 15 KVA (110-300V)/(240V-500V) or suitable capacity |
| 247 | Sluice valves with motor operated actuator of size 150 mm or suitable size for rising main & bypass line |
| 248 | CE/UL Certified electromagnetic flowmeter of size 150mmor suitable size |
| 249 | Soft starter 15 HP or suitable capacity |
| 250 | CE/UL Certified hydrostatic type sub soil watel level transmitter for T/W |
| 251 | CE/UL Certified Pressure transmitter |
| 252 | Complete cabling of tubewell including all power & control cable for T/W |
| 253 | Automation of Units of T/W |
| 254 | CE & UL Certified RTU/PLC in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & power supply with analog & digital parameters & features as specified for T/W to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 255 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 256 | CE/UL Certified Intelligent energy meters |
| 257 | Auto phase reversal Unit 100 Amp or suitable size |
| 258 | CE/UL Certified Surge Protector for control panel |
| 259 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 260 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 261 | Security Survelliance IP Camera |
| 262 | Installation,Testing and commissioning |
| 263 | Trial run 3 months |
| 264 | Trial and run of each tubewell for 3 months including chlorination and operating staff excluding electricity |
| 265 | Zonal Pumping station at Zone 2A |
| 266 | Pumping plants |
| 267 | Supply,installation ,testing and commissioning of VerticalTurbine water lubricated pump and appurtenant / related accessories ,etc complete.to lift 2100 LPM at 36 M head (both are tentative) etc. completewith Vertical Flange Mounted Solid Shaft Motor, 1475 RPM , LT Type of motor with arrangement suitable to operate on 415 volt, 3 Phase 50 HZ AC supply with IP Rating 55.(2W+1S) |
| 268 | M.S. fabricated Dust & Vermin proof of cubical type control panel to be operated from SCADA. For Light, fan & Spares including Ampere meter, Volt meter, frequency meter, P.F. meter capacitor, single phasing preventer, Selector switch, fuses, APFC etc. (Seperate incomer for each transformer and dg sets, seperate outgoing for each Pumpsets and 2 nos outgoing for misc use of 63 amp, 32 Amp. & 16 Amp. MCCB and 1 No. SPAREMCCB. of similar rating as outgoing of pumpset) Note- All incomers and outgoing panels for pumpsets shall have Multi function meter with RS 485 port |
| 269 | VFD type starter with scada communication along with by pass star delta starter |
| 270 | Main Piping & valves including common header, reflux valves |
| 271 | Traveling Trolley with Chain Pulley Block both electric operated |
| 272 | Provision ofSparesmotor and pump setof same duty as above to run pumping plant 24 hrs |
| 273 | 25 Sqmm or suitable capacity, 3 1/2 core Aluminium Conductor PV insulated PVC/XLPE Sheethed armored Cable |
| 274 | 2 Nos. Fire extinguisher of CO2 or ABC Type with sand bucket system |
| 275 | Power Wiring & Earthing material. |
| 276 | CE/UL Certified Radar type level transmitter for CWR |
| 277 | CE/UL Certified Pressure transmitter |
| 278 | Sluice valves with motor operated actuator of 150mm or suitable size |
| 279 | CE/UL Certified electromagnetic flowmeter of 200mm or suitable size |
| 280 | Rubber resistance sheet. |
| 281 | Supply of SCADA Compatible chlorination system |
| 282 | Erection and Painting of all equipments |
| 283 | Internal and external electrification of Pumping plant, Substation and DG Sets |
| 284 | Testing at manufacturers work and site of all above items |
| 285 | Testing and Commissioning of ZPS |
| 286 | DG SETS FOR ZPS |
| 287 | Supply of silent type DG set , engine ,alternatorcapable of developing 82.5 KVA or suitable capacity at 415+6% ,50Hz AC at.85 P.F. lagging and self exciting coupled with suitable BHPdiesel engine through flexible coupling and mounted on common base plate complete with fuel tank inside the acousting system and inbuilt control panel 12 volt lead acide Battery with lead silencer manual control panel & AVM pads D.G. set shall be mounted in open sky resting on the foundation as per latest CPCB Norms. |
| 288 | Suitable AMF panel floor mounting type comprising of Ammeter/ Voltmeter with selector switch, power factor meter, short circuit protection of main supply, thermal over load protection, main supply voltage monitor short circuit protection relay, selector switch auto / manual/off, indicating lamps, push button start / stop / re-set etc. |
| 289 | Anti-Vibration mountings |
| 290 | Exhaust pipe, fuel line and fuel tank |
| 291 | Complete power wiring and earthing of D.G. set and AMF panel as per IER/PWD specification with necessary power and control cable, salt, charcoal, G.I. earth electrodes, watering pipe, C.I. earth boxes and G.I. earth strip of adequate size |
| 292 | Installation of D.G. set and other accessories including commissioning and testing. |
| 293 | Construction of Sub-Station |
| 294 | 11 KV floor mounting, single row type H.T. panel having 1 No. incoming and 2 Nos. outgoing VCB panels(Breaker and panel should be of same OEM) complete with insulated bus bars, all necessary metering, Trivector meter and safety equipments to be operated from SCADA also |
| 295 | 11 KV / 0.415 KV, 100 KVA or suitable size outdoor, step down transformers as per latest amendment of IS 1180, Level II |
| 296 | 11 KV XLPE cable of 3 x 70 sqmm or suitable size Al. armoured cable |
| 297 | 1.1 KV XLPE cable of 3.5 x 95 sqmm or suitable size Al. armoured cable |
| 298 | Cable Jointing Kit for HT and LT type |
| 299 | Double earthing of all sub-station equipments complete with salt, charcoal, G.I. earth electrode, C.I. earth boxes, G.I. watering pipe, G.I. earth strip of adequate capacity and labour. |
| 300 | Erection and commissioning of all sub-station equipments |
| 301 | Protection units like fire buckets, extinguishers etc. |
| 302 | Testing of all equipments of sub-station at manufacturer’s works and at site |
| 303 | Construction of foundations of Transformers and panels |
| 304 | Fencing around outdoor Transformers including pebbles in yards etc. as per relevent standards |
| 305 | NOC From Electrical safety department |
| 306 | Automation of Units ofZPS at Zone 2 |
| 307 | CE & UL Certified RTU/PLC with redundant CPU & Power supply in IP 54 enclosure suitable to communicate with GSM based modem unit with Redundant CPU & power supply with analog & digital parameters & features as specified for intake to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 308 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer & gather data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 309 | CE/UL Certified Intelligent energy meters |
| 310 | Auto phase reversal Unit 160 Amp or suitable size |
| 311 | CE/UL Certified Surge Protector for control panel |
| 312 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 313 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 314 | Complete cabling for instrumentations including all power & control cable |
| 315 | Security Survelliance IP Camera |
| 316 | Installation,Testing and commissioning |
| 317 | Trial run 3 months |
| 318 | Trial run of ZPS with staff and chlorination but excluding elctricity for 3 months |
| 319 | Zone 3 |
| 320 | Construction of Tubewell: |
| 321 | Drilling of Borehole for Tubewell construction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc. |
| 322 | Transportation, Erection, Dismantling of Rig Machine |
| 323 | Drilling of 600 mm. dia bore from G.L. to 60 m |
| 324 | Drilling of 500 mm. dia bore from 61 M to 100 m |
| 325 | Drilling of 500 mm. dia. Bore from 101 M to 200 M |
| 326 | Logging of bore hole by departmental/Approved electric logger |
| 327 | Zone Testing in water quality problem areas including all required material, labour, T&P etc. complete in all respect |
| 328 | Tubewell assembly : |
| 329 | M.S. tubewell assembly with all required parts like plain, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & per typed design complete in all respect. As per IS- 4270 |
| 330 | 300 MMØ Housing Pipe 7.1 mm thick |
| 331 | 200 MMØ Plain Pipe 7.1 mm thick |
| 332 | 200 MMØ Slotted Pipe 7.1 mm thick |
| 333 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. |
| 334 | 300 mm. dia. Housing Pipe from G.L to 54 M BGL |
| 335 | 200 mm. dia Plain/Slotted Pipe 54 M. BGL to 100 M BGL |
| 336 | 200 mm. dia Plain/Slotted Pipe 101 M. BGL to 200 M. BGL |
| 337 | Pea Gravel (lalkuan) |
| 338 | Transportation, Installation Dismantling of 350 PSI Compressor |
| 339 | Charges for Development by 350 PSI Compressor per hour |
| 340 | Transportation, Erection Dismantling of 3 Cusec OP Unit and Yield test. |
| 341 | Charges for Development of TW by 3 Cusec OP Unit |
| 342 | Chemical and Bacteriological Test of water sample from departmental/ approved Lab. |
| 343 | Watch & Ward during construction period. |
| 344 | Barricading around the pit to prevent any posible Accident |
| 345 | Pumping Plants for above tubewells at zone 3 |
| 346 | SITC of 1200 LPM, 30 M head (both tentative) for zone 3 tubewells Pumping plant consisting of control panel having soft starter (item as mentioned below) alongwith by pass star delta Starter, capacitor bank, breakers , cable, complete in all respect with all required material T&P labour etc. SITC of Main Piping (150mm,7.1mm thickness) & reflux valves with 24 mtr. Column pipe, Power wiring, earthing, painting, Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with all required material , T&P labour |
| 347 | Supply of SCADA Compatible chlorination system |
| 348 | Spare Column Pipe 3 M Long heavy Duty |
| 349 | SITC of servo Stabilizer 15 KVA (110-300V)/(240V-500V) or suitable capacity |
| 350 | Sluice valves with motor operated actuator of size 150 mm or suitable size for rising main & bypass line |
| 351 | CE/UL Certified electromagnetic flowmeter of size 150mmor suitable size |
| 352 | Soft starter 15 HP or suitable capacity |
| 353 | CE/UL Certified hydrostatic type sub soil watel level transmitter for T/W |
| 354 | CE/UL Certified Pressure transmitter |
| 355 | Complete cabling of tubewell including all power & control cable for T/W |
| 356 | Automation of Units of T/W |
| 357 | CE & UL Certified RTU/PLC in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & power supply with analog & digital parameters & features as specified for T/W to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 358 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 359 | CE/UL Certified Intelligent energy meters |
| 360 | Auto phase reversal Unit 100 Amp or suitable size |
| 361 | CE/UL Certified Surge Protector for control panel |
| 362 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 363 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 364 | Security Survelliance IP Camera |
| 365 | Installation,Testing and commissioning |
| 366 | Trial run 3 months |
| 367 | Trial and run of each tubewell for 3 months including chlorination and operating staff excluding electricity |
| 368 | Zone 4 |
| 369 | Construction of Tubewell: |
| 370 | Drilling of Borehole for Tubewell construction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc. |
| 371 | Transportation, Erection, Dismantling of Rig Machine |
| 372 | Drilling of 600 mm. dia bore from G.L. to 60 m |
| 373 | Drilling of 500 mm. dia bore from 61 M to 100 m |
| 374 | Drilling of 500 mm. dia. Bore from 101 M to 200 M |
| 375 | Logging of bore hole by departmental/Approved electric logger |
| 376 | Zone Testing in water quality problem areas including all required material, labour, T&P etc. complete in all respect |
| 377 | Tubewell assembly : |
| 378 | M.S. tubewell assembly with all required parts like plain, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & per typed design complete in all respect. As per IS- 4270 |
| 379 | 300 MMØ Housing Pipe 7.1 mm thick |
| 380 | 200 MMØ Plain Pipe 7.1 mm thick |
| 381 | 200 MMØ Slotted Pipe 7.1 mm thick |
| 382 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. |
| 383 | 300 mm. dia. Housing Pipe from G.L to 54 M BGL |
| 384 | 200 mm. dia Plain/Slotted Pipe 54 M. BGL to 100 M BGL |
| 385 | 200 mm. dia Plain/Slotted Pipe 101 M. BGL to 200 M. BGL |
| 386 | Pea Gravel (lalkuan) |
| 387 | Transportation, Installation Dismantling of 350 PSI Compressor |
| 388 | Charges for Development by 350 PSI Compressor per hour |
| 389 | Transportation, Erection Dismantling of 3 Cusec OP Unit and Yield test. |
| 390 | Charges for Development of TW by 3 Cusec OP Unit |
| 391 | Chemical and Bacteriological Test of water sample from departmental/ approved Lab. |
| 392 | Watch & Ward during construction period. |
| 393 | Barricading around the pit to prevent any posible Accident |
| 394 | Pumping Plants for above tubewells at zone 4 |
| 395 | SITC of 1200 LPM, 30 M head (both tentative) for zone 4 tubewells Pumping plant consisting of control panel having soft starter (item as mentioned below) alongwith by pass star delta Starter, capacitor bank, breakers , cable, complete in all respect with all required material T&P labour etc. SITC of Main Piping (150mm,7.1mm thickness) & reflux valves with 24 mtr. Column pipe, Power wiring, earthing, painting, Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with all required material , T&P labour |
| 396 | Supply of SCADA Compatible chlorination system |
| 397 | Spare Column Pipe 3 M Long heavy Duty |
| 398 | SITC of servo Stabilizer 15 KVA (110-300V)/(240V-500V) or suitable capacity |
| 399 | Sluice valves with motor operated actuator of size 150 mm or suitable size for rising main & bypass line |
| 400 | CE/UL Certified electromagnetic flowmeter of size 150mmor suitable size |
| 401 | Soft starter 15 HP or suitable capacity |
| 402 | CE/UL Certified hydrostatic type sub soil watel level transmitter for T/W |
| 403 | CE/UL Certified Pressure transmitter |
| 404 | Complete cabling of tubewell including all power & control cable for T/W |
| 405 | Automation of Units of T/W |
| 406 | CE & UL Certified RTU/PLC in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & power supply with analog & digital parameters & features as specified for T/W to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 407 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 408 | CE/UL Certified Intelligent energy meters |
| 409 | Auto phase reversal Unit 100 Amp or suitable size |
| 410 | CE/UL Certified Surge Protector for control panel |
| 411 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 412 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 413 | Security Survelliance IP Camera |
| 414 | Installation,Testing and commissioning |
| 415 | Trial run 3 months |
| 416 | Trial and run of each tubewell for 3 months including chlorination and operating staff excluding electricity |
| 417 | Zone 7 |
| 418 | Construction of Tubewell: |
| 419 | Drilling of Borehole for Tubewell construction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc. |
| 420 | Transportation, Erection, Dismantling of Rig Machine |
| 421 | Drilling of 600 mm. dia bore from G.L. to 60 m |
| 422 | Drilling of 500 mm. dia bore from 61 M to 100 m |
| 423 | Drilling of 500 mm. dia. Bore from 101 M to 200 M |
| 424 | Logging of bore hole by departmental/Approved electric logger |
| 425 | Zone Testing in water quality problem areas including all required material, labour, T&P etc. complete in all respect |
| 426 | Tubewell assembly : |
| 427 | M.S. tubewell assembly with all required parts like plain, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & per typed design complete in all respect. As per IS- 4270 |
| 428 | 300 MMØ Housing Pipe 7.1 mm thick |
| 429 | 200 MMØ Plain Pipe 7.1 mm thick |
| 430 | 200 MMØ Slotted Pipe 7.1 mm thick |
| 431 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. |
| 432 | 300 mm. dia. Housing Pipe from G.L to 54 M BGL |
| 433 | 200 mm. dia Plain/Slotted Pipe 54 M. BGL to 100 M BGL |
| 434 | 200 mm. dia Plain/Slotted Pipe 101 M. BGL to 200 M. BGL |
| 435 | Pea Gravel (lalkuan) |
| 436 | Transportation, Installation Dismantling of 350 PSI Compressor |
| 437 | Charges for Development by 350 PSI Compressor per hour |
| 438 | Transportation, Erection Dismantling of 3 Cusec OP Unit and Yield test. |
| 439 | Charges for Development of TW by 3 Cusec OP Unit |
| 440 | Chemical and Bacteriological Test of water sample from departmental/ approved Lab. |
| 441 | Watch & Ward during construction period. |
| 442 | Barricading around the pit to prevent any posible Accident |
| 443 | Pumping Plants for above tubewells at zone 7 |
| 444 | SITC of 1200 LPM, 30 M head (both tentative) for zone 7 tubewells Pumping plant consisting of control panel having soft starter (item as mentioned below) alongwith by pass star delta Starter, capacitor bank, breakers , cable, complete in all respect with all required material T&P labour etc. SITC of Main Piping (150mm,7.1mm thickness) & reflux valves with 24 mtr. Column pipe, Power wiring, earthing, painting, Tools sets, wiring of pump house (internal & External) Chain Pulley block and gauges complete in all respect with all required material , T&P labour |
| 445 | Supply of SCADA Compatible chlorination system |
| 446 | Spare Column Pipe 3 M Long heavy Duty |
| 447 | SITC of servo Stabilizer 15 KVA (110-300V)/(240V-500V) or suitable capacity |
| 448 | Sluice valves with motor operated actuator of size 150 mm or suitable size for rising main & bypass line |
| 449 | CE/UL Certified electromagnetic flowmeter of size 150mmor suitable size |
| 450 | Soft starter 15 HP or suitable capacity |
| 451 | CE/UL Certified hydrostatic type sub soil watel level transmitter for T/W |
| 452 | CE/UL Certified Pressure transmitter |
| 453 | Complete cabling of tubewell including all power & control cable for T/W |
| 454 | Automation of Units of T/W |
| 455 | CE & UL Certified RTU/PLC in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & power supply with analog & digital parameters & features as specified for T/W to store and transmit data on GSM Backbone.RTU/PLC designed with logic to transfer data at multiple stations as specified in tender documents |
| 456 | GSM/GPRS based wireless communication 4G modem for RTUs/PLC capable to transfer data from remote site to CS with all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender documents and all running expenses till DLP |
| 457 | CE/UL Certified Intelligent energy meters |
| 458 | Auto phase reversal Unit 100 Amp or suitable size |
| 459 | CE/UL Certified Surge Protector for control panel |
| 460 | CE/UL Certified 7\" HMl touch screen suitable to communicate with PLC/RTU for Local display and control of Process Parameters |
| 461 | Control panel with IP 54 protection, industrial grade for all equipments( Separate for control 24 Vand power equipments |
| 462 | Security Survelliance IP Camera |
| 463 | Installation,Testing and commissioning |
| 464 | Trial run 3 months |
| 465 | Trial and run of each tubewell for 3 months including chlorination and operating staff excluding electricity |
| 466 | Automation of Units of OHT, |
| 467 | FOR ZONE 4A |
| 468 | CE & UL certified Radar type level tranmitter for OHT |
| 469 | Motor OperatedActuator with Sluice Valve/Flow control valve (450 mm or suitable size) |
| 470 | CE / UL certified lectromagneticflowmeter of size:450mm or suitable size) |
| 471 | Dismantelling joint 450 mm or suitable size |
| 472 | Security Survelliance IP Camera |
| 473 | FOR ZONE 5A |
| 474 | CE & UL certified Radar type level tranmitter for OHT |
| 475 | Motor OperatedActuator with Sluice Valve/Flow control valve (300 mm or suitable size ) |
| 476 | CE / UL certified Eectromagneticflowmeter of size: 300 mm or suitable size |
| 477 | Dismantelling joint 300 mm or suitable size |
| 478 | Security Survelliance IP Camera |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy