|
| 1 | Working charges |
| 2 | OD234205/2024-2025:Construction of temporary bund using earth filled cement bags including cutting of the Earth, filling, conveying and placing in position, Filling with contractor's own earth (excluding rock) in the core portion of the earthen bund by consolidating each deposited layer by ramming and watering, dismantling the sand / earth filled cement bag from the foundation site of bund, counter wall and removing the sand/earth from the bag and dispossing the damaged cement bags properly as per the direction of the department officers including all cost, labour charges and hire for tools and plant etc complete. |
| 3 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 4 | 100.54.3.7:Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 13.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. |
| 5 | 100.54.3.8:Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 15.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. |
| 6 | 100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II. |
| 7 | 100.41.35:Supplying, sieving, stacking and spreading 40mm broken stone in the gallery trenches as per standard norms including cost of all materials. |
| 8 | 100.41.36:Supplying, sieving, stacking and spreading 20mm to 12.5mm broken stone in the gallery trenches as per standard norms including cost of all materials. |
| 9 | 100.41.37:Supplying, sieving, stacking and spreading 10mm to 6mm broken stone in the gallery trenches as per standard norms including cost of all materials. |
| 10 | 100.41.38:Supplying, sieving, stacking and spreading Coarse sand (zone III) in the gallery trenches as per standard norms including cost of all materials. |
| 11 | 100.55.5:Removing filter media from the filter beds without making any damages to the existing structures and back manifolds and stacking at a safe and convenient place for segregation process and as per the directions of the department officers etc. complete. |
| 12 | 18.17.4:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore |
| 13 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore |
| 14 | 18.31.2.1:Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertion etc.(the tail pieces if required will be paid separately):125 mm diameterClass I |