Tender For Annual Maintenance (Repairing Of 63 Kva Transformer) Installed For Street Light Different Location And Main Road Of Sector- 71, 72, 73,74, 75, 76, 77, 78, 79, 112, 115, 116, 117, 118, 119, 120 And 122 , Noida - Repair of 63 KVA Transformer incl. changing of HV & LV Coil, Bushing, Gasket & fresh transformer oil without returning of old & unsearciable material. Complete in all respects as per direction of E/I.(AOR) 2 Dis./Re-errection of 25/63/100/250 KVA Al. wound outdoor type Transformer as per ISS including fees as per direction of E/I.(AOR) 3 Supplying and laying of aluminium conductor PVC insulated armoured, served, sheathed cable 1100 Volts grade at a depth of 750 mm. below ground level over a cushion of 75 mm. thick sand alround and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. Clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respects. the armouring of the cable shall be properly connected with the earth conductor by clamps etc.(Grandlay, Skytone, Havells make) 4 3) 70 Sq.mm. 3.5 Core 5 S/F of cable Lug(socket) to the cable lead. Complete in all respects as per PS No. 504 6 2- 70 Sq.mm. 7 Supply and making straight through joint with cast resin compound including ferrules and other joints material for following size of PVC insulated and PVC sheathed/XLPE aluminium conductor cable of 11 KV gradeas required 8 a) 3.5x70 sq. mm ((Electrical DSR-18/Ite. No. 9.3.20 pg.35) 9 Supply and burrying of 75 mm Dia 3 Mtrs. Long Electrode casted with maintenance free, conductive concrete, non corrosive mixture ( Ultra low Resistive carbon 0.001 ohm/Mtr) in the ratio of 3:1:1 (marconite : cement : water) on M.S. Rod with hole (16 mm diameter X3 Mtrs ) will be vertically installed for earthing with 1Mtr G.I strip (25 mm X 2.5mm) connected with SS nut bolt. The earth electrode will be installed into the 100 mm pit up to 3000 mm depth. noraml soil will be used as backfill material. Make : As approved in U.P.P.W.D & C.P.R.I. Certified. (PS no 729(c) P-144) 10 Supply and laying of 25mm x 3mm G.I. strip from earth electrode directly in the ground as required complete in all respect.(PS no 716/ P-138) 11 S/E of overhead line with ACSRconductor on steel tubular poles incl. compression joint, laying stringing and binding etc. as PS No. 627 12 New Transformer oil for Transformer of approved make as per direction of E/I. 13 Dehydration charges of Transformer oil as per direction of E/I. 14 S/F of out door type 11KV fuse set Relco/Rama/Rastriya make with insulator Jai shree/BHEL make complete in all respects as per direction of E/I..(E-38)(AoR) 15 Location and pin pointing of LT cable fault exposling the same in the underground LT cable including digging of trench upto the depth of the cable. Cutting the faulty cable and sealing of the faulty cable, by making experts technical staff. Complete in all respects as per direction of Engineer in charge (AOR) 16 S/F of 11 KV TPMO Relco/Rama/Azad make 9 Nos. insulator of Jai shree/BHEL/ Rama/ Rastriya make complete in all respects as per direction of E/I.(UPERC cost data book 2019/P-48) 17 Supplying and erection of 11kV pin insulator complete with large steel head G.I. Pin, nuts & washer etc. as required (DSR-2018 item no. 13.10 pg.45) 18 Supplying and erection of 11kV Disc insulator for 11kV overhead lines with galvanised inculator fitting, ball and socket type and complete with galvanised strain clamps, bolts, nuts& washerdetc. as required (DSR-2018 item no. 13.11 pg.48) 19 S/F of jointing of 185 sq. mm out door type type 11 KV jointing kit heat Shrinkable type for 11 KV Cable including cost of all material, labour, T&P etc. for proper completion Make : Raychem/ Denson/ Capseal as per direction of E/I. (UPERC P-28) 20 S/Making of Straight through joint suitable for 185 sqmm x 3 core 11KV XLPE cable as per ISS & Complete in all respects Make: Raychem, Denson, Cabseal. As per direction of E/I. (UPERC P-41) 21 Painting of the electric pole with 2 Coats of Al. paint over red oxide primer complete in all respects. P.S. No. 634 22 S/Laying of90 mm dia (OD 90 mm & ID 76 mm nominal) size of (DWC) HDPE Pipes ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part-II complete with filling and cutting, jointing etc. direct in ground ( 75 cm below ground level) including excavation and refilling the trench pat excluding sand cushioning and protective covering etc. Complete in all respects. Rex/Duraline/ Time/CPE make. as per DSR 2018 item no. 14.16.2 page no. 49 23 Filling available excavated earth( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead upto 50 m and lift upto 1.5 m. (AOR). P- 24 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m. The contractor has detect different utilities like sewer line, water supply line, electric cable, Telephone cable, Gas pipe line etc. using utility detecting machine before start of excavatiob and shall start excavation only after permission of Engineer in charge. All kind of soil. (136.0 + 18% GST) (AOR) 25 Repairing of 11KV fuse wire/Jumper i/c supply and fixing of required size conductor, fuse wire of 11KV Line/DP structure of Transformer by takinng shutdown from UPPCL Department with all safety instruments like-safety belt, Gloves, shoes and other necessary items complete including all taxes.(AOR) 26 Location and pin pointing of 11 KV HT cable fault exposling the same in the underground 11KV HT cable including digging of trench upto the depth of the cable. Cutting the faulty cable and sealing of the faulty cableby providing fault location machine with operator (Cable fault locator)Complete in all respects as per direction of Engineer in charge (AOR)