Supply Of Dual Plate Check Valve For Ag And Ug Piping For Msb, Pfcc, Gds And Ff For Nrep As Per Technical Specifications For Numaligarh Refinery Limited, Assam, India , Group-1 (Group Wise Evaluation) Supply Of Dual Plate Check Valves(Moc-Cs & Ltcs) For Ag+Ug Piping For Nerp Project Including Tpi Charges As Specified In Material Requisition. , Dual Plate Chk Valve Cs, 150,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A216 Gr.Wcb, 5, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Vlv Cs Int.Coat, 150,0, Api 594, Double Flgd,B16.5,Ff, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A216 Gr.Wcb, Bronze, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Internally Liquid Epoxy Coated Acc. To, Doc. Nr-0Zzzz-Cv-Spe-0019, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Valve Cs, 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A216 Gr.Wcb, 5, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Valve Cs, 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A216 Gr.Wcb, 5, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Val Cs(Caustic), 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, All Welds Shall Be Subjected, To Pwht., A216 Gr.Wcb, 11, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Vlv Cs(Nace+H2), 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, All Welds Shall Be Subjected, To Pwht., Servicenace, Category 1, A216 Gr.Wcb, 12, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, For Sour(Nace) Service Req. Acc. To, Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Valve Cs (N+C), 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, All Welds Shall Be Subjected, To Pwht., Servicenace, Category 1, Nace+Caustic, A216 Gr.Wcb, 12, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, For Sour(Nace) Service Req. Acc. To, Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043, Vendor To Ensure Adequate, Nut Space Between Flanges , Dual Plate Chk Valve Ltcs, 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A352 Gr.Lcb, 12, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, And In-042, Vendor To Ensure Adequate, Nut Space Between Flanges , Group-2 (Group Wise Evaluation) Supply Of Dual Plate Check Valves(Moc- As) For Ag+Ug Piping For Nerp Project Including Tpi Charges As Specified In Material Requisition. , Dual Plate Chk Valve As, 300,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, All Welds Shall Be Subjected, To Pwht., A217 Gr.C5, 5, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, Vendor To Ensure Adequate, Nut Space Between Flanges , Group-3 (Group Wise Evaluation) Supply Of Dual Plate Check Valves(Moc- Ss) For Ag+Ug Piping For Nerp Project Including Tpi Charges As Specified In Material Requisition. , Dual Plate Chk Valve Ss (H2), 600,0, Api 594, Double Flgd,B16.5,Rf, Designdual Plate (Type A), Double Flgd (Fig. C.4,Api 594), Installationhoriz./Vertical, A351 Gr.Cf8c, 17, Spring Inconel X-750, Add. Information, Documents To Be Followed, Tk-1Zzza-Pi-Spe-0005,Tk-1Zzza-Pi-Spe-0006,, Tk-1Zzza-Pi-Spe-0008,Tk-1Zzza-Pi-Spe-0009, Vendor To Ensure Adequate, Nut Space Between Flanges => Limited