| 1 | HT line construction and Transformer Installation |
| 2 | Loading HT PSC pole from the stacking place and unloading the same atwork site (transport by vehicle). |
| 3 | Additional rate for excavation of one Pit for HT Pole/HT Stay in SoftRock |
| 4 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC poleincl. digging & back filling pits. |
| 5 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole incl. conveyance of materials |
| 6 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2channel cross arms, digging & back filling pit, drawing earth leads. |
| 7 | Additional rate for providing one disc set on any type of HT pole formaking cut point. |
| 8 | Fitting one Additional V cross arm in existing single pole incl.conveyance of materials. |
| 9 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), inexisting 11kV DP incl. conveyance of materials. |
| 10 | Conveyance of one km 11kV line materials from section store/stackingplace to the work site (excluding poles). |
| 11 | Transporting poles by hired vehicle to a distance beyond 5km andcarrying upto 4 poles. (Running km). |
| 12 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. and stacking the same. |
| 13 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc. and stacking the same. |
| 14 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole andrefitting all items to the new pole |
| 15 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm,digging & back filling pit, drawing earth leads. |
| 16 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 poles excluding loading & unloading. |
| 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in HardLaterite |
| 18 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 19 | Fitting and providing one HT Stay for 11kV pole incl. digging & backfilling pit. |
| 20 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl.cutting and removing tree branches wherever necessary. |
| 21 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LTconnections on existing DP, 3 LT fuses. |
| 22 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of63 to 250kVA Transformers / RMUs excluding loading & unloading. |
| 23 | Transporting Transformers by hired vehicle to a distance beyond 5km andupto 2 No. of 63 to 250kVA Transformers / RMUs (Running km). |
| 24 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6mm MS flat and 8 mm MS rod as specified, incl cost of transportation &foundation |
| 25 | Providing yard metalling with 6mm & 40mm thick blue metal asspecified after constructing a curb wall. |
| 26 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 27 | Erecting one 100kVA Transformer to existing DP and giving connections,incl. loading & unloading, excluding transportation. |
| 28 | Fitting and providing one Strut using HT PSC pole incl. digging & backfilling pit. |
| 29 | Fitting one set AB switch and giving connection |
| 30 | Providing one Earth using earth pipe incl. digging & backfilling pit andsupply of charcoal, salt, sand etc. |
| 31 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 32 | Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 33 | Providing one Coil Earth using GI earth wire, digging separate pit atstandard distance away from the pole/structure & backfilling |