|
| 1 | A. Supply ofnew 11 KV line 2.50 KM U/G Line(1+1) & 06 nos. of 11/0.4 KV S/S Set with 1.00 KM LT Line. |
| 2 | SUPPLY OF PCC POLE 9 Mtr. LONG (200KG) |
| 3 | SUPPLY OF 11KV cross arm set with top hamper & clamps |
| 4 | SUPPLY OF ACSR RABBIT CONDUCTOR |
| 5 | SUPPLY OF 11/0.4 KV S/S STRUCTURE 166.746 KGS |
| 6 | SUPPLY OF ISOLATING SWITCHES 11KV 400A W/O EB WITH PI |
| 7 | SUPPLY OF 11KV 3 PHASE HORNGAP FUSE SET WITH PI |
| 8 | SUPPLY OF 11KV PIN INSULATOR |
| 9 | SUPPLY OF 11 KV G.I. PIN |
| 10 | SUPPLY OF G.I. STAY SET 16 X 1800mm |
| 11 | SUPPLY OF G.I STAY WIRE 7/10 S. W.G.(7/3.15mm) |
| 12 | SUPPLY OF 11KV STAY INSULATOR |
| 13 | SUPPLY OF STAY CLAMP SUITABLE FOR 9 Mtr PCC POLE 200KG |
| 14 | SUPPLY OF M.S ROD TYPE EARTHING SET |
| 15 | SUPPLY OF M.S. NUT & BOLTS assorted size |
| 16 | SUPPLY OF11 KV XLPE CABLE(ARMOURED) 3 CORE 185 SQ MM |
| 17 | SUPPLY OF11KV XLPE CABLE BOX 3X185 H.S OUTDOOR TYPE |
| 18 | SUPPLY OF 11KV XLPE CABLE BOX 3X185 ST. Through joint |
| 19 | SUPPLY OF LT-3 PHASE PILLER BOX 400AMP |
| 20 | SUPPLY OF LT 4\" (1200mm) cross arm set with clamp |
| 21 | SUPPLY OF LT Distrubution Box for main line & service line connections 100 Amp. |
| 22 | SUPPLY OF LT XLPE 4 CORE CABLE ARMOURED 120 SQMM |
| 23 | SUPPLY OF LT XLPE 4 CORE CABLE ARMOURED 185 SQMM |
| 24 | SUPPLY OF LT PVCARMOURED CABLE 2CX4 SQMM |
| 25 | SUPPLY OF LT PVCARMOURED CABLE(4 CORE) 4CX10 SQMM |
| 26 | SUPPLY OF ALUMINIUM LUGS 120 mm |
| 27 | GI Earth Wire 8 SWG |
| 28 | Note-(1).Transformer will be privided to the contractor as free issued item by Nigam. (100 KVAx6).(2)The unit base rate for supply of material mentioned in column No. 5 is inclusive of GST @ 18% and freight, insurance & transportation charges of all items(3) The sucessful bidder shall furnish price break upin format provided by this office with acceptance of LoI. |