| Sl. No. | Item Description |
| 1 | Pump House cum Chlorinating Room |
| 2 | Supply of all materials and construction of pump house cum chlorinating room (3.60x3.00x3.60 and 1.8x1.25x3.00)mas per departmental type design , drawingandspecificationsforcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer ‐in ‐ charge. |
| 3 | Zone-1 |
| 4 | Zone-2 |
| 5 | Construction of 1.0x1.0x1.3 m masonry type byepass chamber including plaster, supply of all material, labour, T & P etc. required for proper completion of work |
| 6 | Zone-1 |
| 7 | Zone-2 |
| 8 | Extra Ist class brick work in 1:6 cement and coarse sand mortar in foundation and plinth due to low land area including supply of all materials, labour,T&P etc required for proper compltion of work. |
| 9 | RISING MAIN |
| 10 | ZONE-1 |
| 11 | Supply of the following pipes including railway freight, insurance charges F.O.R. etc. complete as per IS 8329:2000 or its latest amendment |
| 12 | 200 MM DIA DI K-9 |
| 13 | Supply of D.I. specials for the above pipe lines. |
| 14 | Supply of following sizes of D.I. D/F sluice valves as per I.S. 14846:2000 TESTED TO 10 Kg/sqm fixing in pipe line trenches, jointing and testing complete. |
| 15 | 200 MM |
| 16 | Carting of following sizes D.I.D./F Sluice Valve and specials and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete including supply of jointing materials. |
| 17 | 200 MM |
| 18 | Excavation for pipeline work in Ordinary Soil with lift up to 1.5 m and lead up to 50 m including filling back the excavated earth into thetrenches with watering, ramming and disposal of surplus earth with in 50 m lead. |
| 19 | Carting, Laying and Jointing of following size of DI pipes and specials and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete including testing of pipe lines and cutting of pipes. |
| 20 | 200 MM DI K-9 |
| 21 | Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete. |
| 22 | Masonary Type Chamber as per Unit Estimate (1.0x1.0x1.25m) |
| 23 | Thrust Block |
| 24 | RCC 1:1.5:3 |
| 25 | Mild Steel |
| 26 | Dismentlingof following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 27 | CC Road |
| 28 | Interlocking Tiles Road |
| 29 | Reinstatment of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete |
| 30 | CC Road |
| 31 | Interlocking Tiles Road |
| 32 | RISING MAIN ZONE-2 |
| 33 | Supply of the following pipes including railway freight, insurance charges F.O.R. etc. complete as per IS 8329:2000 or its latest amendment |
| 34 | 200 MM DIA DI K-9 |
| 35 | 250 MM DIA DI K-9 |
| 36 | 300 MM DIA DI K-9 |
| 37 | Supply of D.I. specials for the above pipe lines. |
| 38 | Supply of following sizes of D.I. D/F sluice valves as per I.S. 14846:2000 TESTED TO 10 Kg/sqm fixing in pipe line trenches, jointing and testing complete. |
| 39 | 200MM |
| 40 | 300 MM |
| 41 | Carting of following sizes D.I.D./F Sluice Valve and specials and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete including supply of jointing materials. |
| 42 | 200MM |
| 43 | 300MM |
| 44 | Excavation for pipeline work in Ordinary Soil with lift up to 1.5 m and lead up to 50 m including filling back the excavated earth into thetrenches with watering, ramming and disposal of surplus earth with in 50 m lead. |
| 45 | Carting, Laying and Jointing of following size of DI pipes and specials and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete including testing of pipe lines and cutting of pipes. |
| 46 | 200 MM DIA DI K-9 |
| 47 | 250 MM DIA DI K-9 |
| 48 | 300 MM DIA DI K-9 |
| 49 | Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete. |
| 50 | Masonary Type Chamber as per Unit Estimate (1.0x1.0x1.25m) |
| 51 | Thrust Block |
| 52 | RCC 1:1.5:3 |
| 53 | Mild Steel |
| 54 | Dismentlingof following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 55 | CC Road |
| 56 | Interlocking Tiles Road |
| 57 | Reinstatment of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete |
| 58 | CC Road |
| 59 | Interlocking Tiles Road |
| 60 | Over Head Tank |
| 61 | Over Head Tank :- Supply of all materials, T&P etc. and construct an RCC over head tank of following size with RCC staircase & 1 m wide balcony, G.I. pipes railing consisting of 3 rows of 20 mm dia. GI. Pipe and angle iron posts around balcony & at the dome periphery M.S. ladder from balcony to top of tank and inside the tank,supply and fixing M.H. cover with locking device,ventilator,lightening conductor, supply and fixing of pipes, puddle collers and bell mouths, supply and fixing M.S. Clamps with RCC column 25mm PCC 1:2:4 over 80 mm PCC 1:4:8 in apron, 150 mm semicircular drain around the tank, escape channel of 20 m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of apex paint, testing of tank for water tightness and testing of bearing capacity of soil etc. all complete. |
| 62 | For Zone 2 |
| 63 | 1700KL/ 25 M |
| 64 | Repairing of existing OHT |
| 65 | 300KL/18 M Capacity (Zone-1) |
| 66 | Providinganderectionofscaffoldingandshuttering materiallikechalli,gurra,nail,bans,ballia,patraetc. requiredforcompleteofworkonallsurgaceareaof OHTfromtopdometoG.L.soastogivestrong and safeplateformtoworkerstoworkon all part of OHT for repair and strengthning as per direction of engineer in-charge. |
| 67 | Surface Preparation- The surface of structure to betreatedforstrengthningshallberoughened properly eitherby rakingjointsorby hachingthe cementconcretesurfacewithaspeciallymade hachingtoolor otherwisealternativelyto/make thesurfaceroughanddustfreebyproviding spatter key or wire brush as per direction of engineer in charge. |
| 68 | Injectiongroutinginverticalsurface/wallplacing andfixingnozzlebydrillingmachineintankwall having minimum dia of nozzle 15mm and provide onaregularintervalnotexceeding1mincluding construction joints. Injection of pidicrete AM (Ploymer based on shrinkage high strength grout) admisxed with cement through nozle under pressure by sump @ 250gms per bag ofcement sealingthenozzleaftergroutingwith Ploymer productmixedwithcement,makingtankbodyin working and seapage free condition including supply all materials, labour, T&P etc. for strengthning of columns, braces, stair case, balcony, vertical wall, dome etc. complete in all respect as per latest / relevant IS 3370 Part I to Part IV specification. |
| 69 | Changeofsteelladderinsidethetank,repairof MHcoveroftopdome,changeofmosqeutojali with new one complete, repair/ change of water levei indicater, lightening conductor, vertical column pipe, valve etc. complete as per direction of engineer in charge. |
| 70 | Supply andfixingof20mmdiaG.I.Piperailingin stair case and balcony. (Taking only 25% new and 75% old materials) as per direction of engineer in charge. |
| 71 | Layingand fixing of 3mm thick MS wire mesh on roofofslabfornominalreinforcementincluding cost ofall labour, materials, T&P etc required for completion of workas per direction of engineer in charge. |
| 72 | 25 mm thick 1:2:4 plain cementconcrete flooring inapronwithcementcoarsesandand20mm gaugestone ballast,laidinpanelsFinishedwith 3mm floating coat of neat cement of cement including 75mm thickbaseconcreteof1:4:8 including supply of all material, repair of sluice valve chamber etc. as per direction of engineer in charge. |
| 73 | PaintingofoutersurfaceofOHTwithwheather proofpaint(likeapexetc.)asperdirectionof engineer in-charge. |
| 74 | Painting of iron work with 1 coat primer & 2 coats ofapprovedemultionpaintasperdirectionof engineer incharge. |
| 75 | Providing reinforcement for the R.C.C. component of OHT up to 30mt height as required in place of corroded reinforcment bars to compensate the weaker sections including fixing of bars by lapping. anchoring in the cement concrete by drilling holes or welding and grouting with apoxy as per direction and satisfaction of Engineer in charge also including cost of all material, labour T&P etc. complete as to bring out required shape of the structure for the proper completion of work. |
| 76 | Construction of chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and supply of all materials, labour T&P etc complete for proper completion of work. |
| 77 | Apex painting of O.H.T. Tank (Complete) with two coats & one Base coat with approved shade & Quality and also painting of railing of stair case & balcony with synthetic enamel paint two coats with one primiry coat including supply of all material, labour, T&P etc. complete. |
| 78 | Distribution System (Zone-1) |
| 79 | Supply of following sizes and type of pipes with all jointing materials such as socket, rubber gasket as per IS 4984/2016 and IS-8329/2000 or their latest amendment including F.O.R. destination and insurance etc. with loading, unloading and stacking all complete. |
| 80 | HDPE Pipe PN-6 PE - 100 |
| 81 | 110 mm dia |
| 82 | 140 mm |
| 83 | 160 mm |
| 84 | DI K-7 Pipe |
| 85 | 200 mm DI K‐7 |
| 86 | 250 mm DI K‐7 |
| 87 | Supply of HDPE specials for HDPE pipes |
| 88 | Supply of D.I. specials for DI Pipes |
| 89 | Carting, Laying and Jointing of following size & type of pipes and specials and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete including testing of pipe lines and cutting of pipes. |
| 90 | HDPE Pipe PN-6 PE - 100 |
| 91 | 110 mm |
| 92 | 140 mm |
| 93 | 160 mm |
| 94 | DI K-7 Pipe |
| 95 | 200 mm DI K‐7 |
| 96 | 250 mm DI K‐7 |
| 97 | Excavation for pipeline work in Ordinary Soil with lift up to 1.5 M and lead up to 50 M including filling back the excavated earth into thetrenches with watering, ramming and disposal of surplus earth with in 50 M lead. |
| 98 | Supply of following Type/ sizes D.I.D./F valve including F.O.R. destination and insurance etc. complete as per relevant IS. |
| 99 | Sluice Valve |
| 100 | 100 MM |
| 101 | 150 MM |
| 102 | Scour Valve 100mm dia |
| 103 | Fire Hydrant 80mm dia |
| 104 | C.I. Single ball type air valve 20mm dia |
| 105 | Carting of following sizes D.I. D./F Sluice Valve and specials and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete including supply of jointing materials. |
| 106 | Sluice Valve |
| 107 | 100 MM |
| 108 | 150 MM |
| 109 | Scour Valve 100mm dia |
| 110 | Fire Hydrant 80mm dia |
| 111 | C.I. Single ball type air valve 20mm dia |
| 112 | Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete. |
| 113 | Masonary Type Chamber as per Unit Estimate |
| 114 | Surface Box Type Chamber |
| 115 | Fire Hydrant Chamber |
| 116 | Air Valve Chamber(350x350x500 mm) |
| 117 | Dismentlingof following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 118 | Bituminous Road (PR) |
| 119 | CC Road |
| 120 | Interlocking Road |
| 121 | Reinstatment of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete |
| 122 | Bituminous Road (PR) |
| 123 | CC Road |
| 124 | Interlocking Road |
| 125 | Provision of crossing of Nalas & culvert complete i.e. total material MS 6mm thick covering pipe with epoxy paint both side, dismentling and repair of nala walls floor etc. (including supply of all materials including FOR destinaion inclusive of all duties third party inspection charge, transit insurance, freight, loading, unloading and stacking etc. complete) & labour cost as per type design & as per unit estimate type desing and drawing and as per instruction of Engineer-in- charge. |
| 126 | Nala Crossing (0.5 m to 1.50 m) |
| 127 | Nala Crossing above 1.50 m |
| 128 | Culvert Crossing (for 3.5 m wide) |
| 129 | Making house connection in following sizes of distribution pipes including supply, carting of specials, lowering them into trenches cutting, fixing them in proper alignment and jointing including bailing out of water, necessary, excavation for connection and barricading including all labour, T&P etc. required for proper completion of the work in all types of roads. |
| 130 | In Bituminus Road (PR) |
| 131 | Upto 110mm dia |
| 132 | For 125mm to 160mm dia |
| 133 | In CC Road |
| 134 | Upto 110mm dia |
| 135 | For 125mm to 160mm dia |
| 136 | In Interlocking Tiles Road (IL) |
| 137 | Upto 110mm dia |
| 138 | For 125mm to 160mm dia |
| 139 | For 180mm to 250mm dia |
| 140 | In Kaccha (KC) |
| 141 | Upto 110mm dia |
| 142 | For 180 mm to 250mm dia |
| 143 | Distribution System (Zone-2) |
| 144 | Supply of following sizes and type of pipes with all jointing materials such as socket, rubber gasket as per IS 4984/2016 and IS-8329/2000 or their latest amendment including F.O.R. destination and insurance etc. with loading, unloading and stacking all complete. |
| 145 | HDPE Pipe PN-6 PE - 100 |
| 146 | 110 mm |
| 147 | 140 mm |
| 148 | 160 mm |
| 149 | DI K-7 Pipe |
| 150 | 200 mm DI K‐7 |
| 151 | 250 mm DI K‐7 |
| 152 | 300 mm DI K‐7 |
| 153 | 350 mm DI K‐7 |
| 154 | 450 mm DI K‐7 |
| 155 | Supply of HDPE specials for HDPE pipes |
| 156 | Supply of D.I. specials for DI Pipes |
| 157 | Carting, Laying and Jointing of following size & type of pipes and specials and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete including testing of pipe lines and cutting of pipes. |
| 158 | HDPE Pipe PN-6 PE - 100 |
| 159 | 110 mm |
| 160 | 140 mm |
| 161 | 160 mm |
| 162 | DI K-7 Pipe |
| 163 | 200 mm DI K‐7 |
| 164 | 250 mm DI K‐7 |
| 165 | 300 mm DI K‐7 |
| 166 | 350 mm DI K‐7 |
| 167 | 450 mm DI K‐7 |
| 168 | Excavation for pipeline work in Ordinary Soil with lift up to 1.5 M and lead up to 50 M including filling back the excavated earth into thetrenches with watering, ramming and disposal of surplus earth with in 50 M lead. |
| 169 | Supply of following Type/ sizes D.I.D./F valve including F.O.R. destination and insurance etc. complete as per relevant IS. |
| 170 | Sluice Valve |
| 171 | 100mm |
| 172 | 150 mm |
| 173 | 200 mm |
| 174 | 250 mm |
| 175 | 350 mm |
| 176 | Scour Valve 100mm dia |
| 177 | Fire Hydrant 80mm dia |
| 178 | C.I. Single ball type air valve 20mm dia |
| 179 | Carting of following sizes D.I. D./F Sluice Valve and specials and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete including supply of jointing materials. |
| 180 | Sluice Valve |
| 181 | 100 mm |
| 182 | 150 mm |
| 183 | 200 mm |
| 184 | 250 mm |
| 185 | 300 mm |
| 186 | Scour Valve 100mm dia |
| 187 | Fire Hydrant 80mm dia |
| 188 | C.I. Single ball type air valve 20mm dia |
| 189 | Supply of all materials and construct following chambers as per type design with supply of all labour, T&P etc. complete. |
| 190 | Masonary Type Chamber as per Unit Estimate |
| 191 | Surface Box Type Chamber |
| 192 | Fire Hydrant Chamber |
| 193 | Air Valve Chamber(350x350x500 mm) |
| 194 | Dismentlingof following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete. |
| 195 | Bituminous Road (PR) |
| 196 | CC Road |
| 197 | Interlocking Road |
| 198 | Reinstatment of following type of road and stacking of useful materials including supply of all materials, labour, T&P etc. complete |
| 199 | Bituminous Road (PR) |
| 200 | CC Road |
| 201 | Interlocking Road |
| 202 | Provision of crossing of Nalas & culvert complete i.e. total material MS 6mm thick covering pipe with epoxy paint both side, dismentling and repair of nala walls floor etc. (including supply of all materials including FOR destinaion inclusive of all duties third party inspection charge, transit insurance, freight, loading, unloading and stacking etc. complete) & labour cost as per type design & as per unit estimate type desing and drawing and as per instruction of Engineer-in- charge. |
| 203 | Nala Crossing (0.5 m to 1.50 m) |
| 204 | Nala Crossing above 1.50 m |
| 205 | Culvert Crossing ( for 3.5m wide) |
| 206 | Making house connection in following sizes of distribution pipes including supply, carting of specials, lowering them into trenches cutting, fixing them in proper alignment and jointing including bailing out of water, necessary, excavation for connection and barricading including all labour, T&P etc. required for proper completion of the work in all types of roads. |
| 207 | In Bituminus Road (PR) |
| 208 | Upto 110mm dia |
| 209 | For 125mm to 160mm dia |
| 210 | For 180mm to 250mm dia |
| 211 | For 300mm dia to 500mm dia |
| 212 | In CC Road |
| 213 | Upto 110mm dia |
| 214 | For 125mm to 160mm dia |
| 215 | For 180 mm to 250 mm dia |
| 216 | In Interlocking Tiles Road (IL) |
| 217 | Upto 110mm dia |
| 218 | For 125mm to 160mm dia |
| 219 | For 180mm to 250mm dia |
| 220 | For 300 mm dia |
| 221 | For 350 mm to 500mm dia |
| 222 | In Kaccha (KC) |
| 223 | Upto 110mm dia |
| 224 | For 125mm to 160mm dia |
| 225 | For 180mm to 250mm dia |
| 226 | Provision of crossing of state highway/Mazor Road by trenchless technology fordistribution main including cost ofmachinery, repairing of roads etc as perunit estimate enclosed including supply ofMS pipe and all materials including allduties third party inspection charge, transitinsurance, freight, loading, unloading andstacking etc. complete |
| 227 | 200 mm dia 6mm thick with MS Casing |
| 228 | 350 mm dia 8mm thick with MS Casing |
| 229 | Boundary Wall, Approach Road, Main Gate Etc (Zone-1) |
| 230 | Construction of 230mm thick, 1.60m height with 0.35x0.35 m Piller Boundary Wall in 1:6 Coarse sand and cement |
| 231 | Construction of Boundary wall around water works compound. |
| 232 | Extra Ist class brick work in 1:6 cement and coarse sand mortar in foundation and plinth due to low land area including supply of all materials, labour,T&P etc required for proper compltion of work.(SOR:1029) |
| 233 | Fixing of 3.6m wide MS gate with 1.2m wide wicket gate Including fabrication and supply of steel and construction of boundary pillars etc. all complete. |
| 234 | Supply and laying of 80mm thick Cement interlocking tiles for approach road including preparation of 100mm thick subgrade with lean concrete 1:4:8 including supply of all material, labour and T&P etc complete for proper completion of the work. |
| 235 | Provision for inside square drain including supply of all materials labour and T & P etc. complete. |
| 236 | Recharge of ground water by Roof Top Rain Water of Pump house, water available from bye pass of tubewell and over flow of over head tank as per drawing including supply of all materials, labour, T&P etc. complete. |
| 237 | Construction of Rain Water Harvesting Chamber 5.50m x3.50x 1.80m with 01 Nos 110mm Dia, 20 mtr Deep Borewell in Water Works Campus. |
| 238 | Boundary Wall, Approach Road, Main Gate Etc (Zone-2) |
| 239 | Construction of 230mm thick, 1.60m height with 0.35x0.35 m Piller Boundary Wall in 1:6 Coarse sand and cement |
| 240 | Construction of Boundary wall around water works compound. |
| 241 | Extra Ist class brick work in 1:6 cement and coarse sand mortar in foundation and plinth due to low land area including supply of all materials, labour,T&P etc required for proper compltion of work.(SOR:1029) |
| 242 | Fixing of 3.6m wide MS gate with 1.2m wide wicket gate Including fabrication and supply of steel and construction of boundary pillars etc. all complete. |
| 243 | Supply and laying of 80mm thick Cement interlocking tiles for approach road including preparation of 100mm thick subgrade with lean concrete 1:4:8 including supply of all material, labour and T&P etc complete for proper completion of the work. |
| 244 | Provision for inside square drain including supply of all materials labour and T & P etc. complete. |
| 245 | Recharge of ground water by Roof Top Rain Water of Pump house, water available from bye pass of tubewell and over flow of over head tank as per drawing including supply of all materials, labour, T&P etc. complete. |
| 246 | Construction of Rain Water Harvesting Chamber 5.50m x3.50x 1.80m with 02 Nos 110mm Dia, 20 mtr Deep Borewell in Water Works Campus. |
| 247 | Construction of Rain Water Harvesting Chamber 1.66m x1.66x 1.80m with 01 Nos 110mm Dia, 20 mtr Deep Borewell in Campus of Proposed TW |
| 248 | Landscaping, plantation work in water works campus. |
| 249 | Master Control Station (MCS)/ SCADA Room |
| 250 | Construction of Master Control Station / SCADA Room including supply of all material, labour, T & P etc. required for proper completion of work as per Unit Estimate & Type Design |
| 251 | E/M WORKS |
| 252 | zone-1 |
| 253 | Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. |
| 254 | Transportation, Erection and Dismantling of Rig Machine |
| 255 | Drilling of 600mm size bore from GL to 100 BGL |
| 256 | Tubewell Assembly |
| 257 | M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect. |
| 258 | 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. |
| 259 | Supply of pea gravel |
| 260 | Logging of bore hole by departmental / approved electric logger. |
| 261 | Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. |
| 262 | Lowering of 300mm dia pipe from GL to 90m deep BGL. |
| 263 | Development of Tubewell by compressor |
| 264 | Transportation, Installation and Dismantling of 350 PSI Compressor |
| 265 | Development of Tubewell by 350 PSI Capacity Air compressor |
| 266 | Development of Tubewell by O.P. Unit |
| 267 | Transportation, Installation and Dismantling of 1 Cusec O.P. Unit & Yield Test. |
| 268 | Development of Tubewell by 1 Cusec Capacity by O.P. Unit |
| 269 | Chemical and Bacterological test of water sample from depaprtmental/ approved lab. |
| 270 | PUMPING PLANT OF NEW TUBEWELL NO 1 ZONE-1 |
| 271 | SITC of Submersible Pumping Plant with 24m column pipe assembly,NRV,bend,Tee, D/F pipe, earthing, painting, Toolset, power wiring of pump house internal and external chain pulley block and all pumping plant accesssories with nut bolt ,rubber packing etc 1000 LPM, 55 m head, HP or suitable capacity. |
| 272 | Soft starter with RS-485 port-400V Class 22 Kw rating or above as per site requirement. |
| 273 | Capacitor Bank 10 KVAR with Relay |
| 274 | 01 KVAR UPS at TW Panel |
| 275 | 100 mm size motor operated actuator with Sluice valve |
| 276 | 3 Mtr. long heavy duty size 100mm dia column pipe same as above spare. |
| 277 | CE & UL certified Inteligent Smart Energy Meter |
| 278 | CE & UL certified Hydrostatic type sub soil water level transmitter for tubewell. |
| 279 | CE & UL certified pressure transmitter |
| 280 | Auto phase reversal unit with inbuilt time delay 125 amp |
| 281 | Motor operated Actuators with Sluice valve of size upto 100 mm. at Main line and Bye-pass line of Tubewell. |
| 282 | CE & UL certified Electromagnatic Flowmeter suitable for above line size 100 mm. |
| 283 | Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT . |
| 284 | Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. |
| 285 | Supply & Laying of PVC insulated Al. armoured cable size 1x3.5/4Cx35 sq mm. from transformer LV side to meter panel and meter panel to starter. |
| 286 | SITC of Automatic type chlorinating plant solenoid driven dosing pump of capacity 0-6 LPH ( pressure 4kg/cm2 with ORP sensor to check and regulate the dosing along with 200 ltr capacity HDPE tank (02 nos., 1W+1S) ,standard fittings, wall/floor mountings MS bracket for dosing pump with GM Valve ,cock valve & sodium hydro chloride solution.,chlorine test kit with O.T. Solution complete with all respect.( suitable for 100-220V and 30-60 Hz , suction lift- 1.5 m., injection pressure 4 bars, steadt state accuracy +-3% repeatability +-3%) with RS 485 Port O/P having facility of interface with PLC SCADA system. |
| 287 | SITC of 03 Phase Servo Voltage Stabilizer 30 KVA. |
| 288 | ELECTRICAL / MECHANICAL WORKFOR EXISTING OVERHEAD TANK 300 KL |
| 289 | Motor operated Actuators with Sluice valve of size 300 mm. at distribution line |
| 290 | CE & UL certified Electomagnetic Flowmeter for OHT line size 300 mm. dia |
| 291 | CE/UL Certified suitable capacity UPS with batteries. |
| 292 | Chlorine Analyzer rnge 0-5ppm (electrolyte with membrane cap; Type- Amperometric with PH compensator. |
| 293 | zone-2 |
| 294 | New Tubewell of size 300x300 mm. dia by D.C./RC Rig Machine |
| 295 | Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. |
| 296 | Transportation, Erection and Dismantling of Rig Machine |
| 297 | Drilling of 600mm size bore from GL to 100 BGL |
| 298 | Tubewell Assembly |
| 299 | M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect. |
| 300 | 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. |
| 301 | Supply of pea gravel |
| 302 | Logging of bore hole by departmental / approved electric logger. |
| 303 | Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. |
| 304 | Lowering of 300mm dia pipe from GL to 90m deep BGL. |
| 305 | Development of Tubewell by compressor |
| 306 | Transportation, Installation and Dismantling of 350 PSI Compressor |
| 307 | Development of Tubewell by 350 PSI Capacity Air compressor |
| 308 | Development of Tubewell by O.P. Unit |
| 309 | Transportation, Installation and Dismantling of 1 Cusec O.P. Unit & Yield Test. |
| 310 | Development of Tubewell by 1 Cusec Capacity by O.P. Unit |
| 311 | Chemical and Bacterological test of water sample from depaprtmental/ approved lab. |
| 312 | PUMPING PLANT OF NEW TUBEWELL NO 1 (OLD DEFUNCT OHT) |
| 313 | SITC of Submersible Pumping Plant with 24m column pipe assembly,NRV,bend,Tee, D/F pipe, earthing, painting, Toolset, power wiring of pump house internal and external chain pulley block and all pumping plant accesssories with nut bolt ,rubber packing etc 1300 LPM, 63 m head, 30 HP or suitable capacity. |
| 314 | Soft starter with RS-485 port-400V Class 30 Kw rating or above as per site requirement. |
| 315 | Capacitor Bank 10 KVAR with Relay |
| 316 | 01 KVAR UPS at TW Panel |
| 317 | 150 mm size motor operated actuator with Sluice valve |
| 318 | 3 Mtr. long heavy duty size 150mm dia column pipe same as above spare. |
| 319 | CE & UL certified Inteligent Smart Energy Meter |
| 320 | CE & UL certified Hydrostatic type sub soil water level transmitter for tubewell. |
| 321 | CE & UL certified pressure transmitter |
| 322 | Auto phase reversal unit with inbuilt time delay 125 amp |
| 323 | Motor operated Actuators with Sluice valve of size upto 100 mm. at Main line and Bye-pass line of Tubewell. |
| 324 | CE & UL certified Electromagnatic Flowmeter suitable for above line size 100 mm. |
| 325 | Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT . |
| 326 | Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. |
| 327 | Supply & Laying of PVC insulated Al. armoured cable size 1x3.5/4Cx35 sq mm. from transformer LV side to meter panel and meter panel to starter. |
| 328 | SITC of Automatic type chlorinating plant solenoid driven dosing pump of capacity 0-6 LPH ( pressure 4kg/cm2 with ORP sensor to check and regulate the dosing along with 200 ltr capacity HDPE tank (02 nos., 1W+1S) ,standard fittings, wall/floor mountings MS bracket for dosing pump with GM Valve ,cock valve & sodium hydro chloride solution.,chlorine test kit with O.T. Solution complete with all respect.( suitable for 100-220V and 30-60 Hz , suction lift- 1.5 m., injection pressure 4 bars, steadt state accuracy +-3% repeatability +-3%) with RS 485 Port O/P having facility of interface with PLC SCADA system. |
| 329 | SITC of 03 Phase Servo Voltage Stabilizer 50 KVA. |
| 330 | PUMPING PLANT OF NEW TUBEWELL NO 2 (NEAR POND) |
| 331 | SITC of Submersible Pumping Plant with 24m column pipe assembly,NRV,bend,Tee, D/F pipe, earthing, painting, Toolset, power wiring of pump house internal and external chain pulley block and all pumping plant accesssories with nut bolt ,rubber packing etc 1300 LPM, 64 m head, 30 HP or suitable capacity. |
| 332 | Soft starter with RS-485 port-400V Class 30 Kw rating or above as per site requirement. |
| 333 | Capacitor Bank 10 KVAR with Relay |
| 334 | 01 KVAR UPS at TW Panel |
| 335 | 150 mm size motor operated actuator with Sluice valve |
| 336 | 3 Mtr. long heavy duty size 150mm dia column pipe same as above spare. |
| 337 | CE & UL certified Inteligent Smart Energy Meter |
| 338 | CE & UL certified Hydrostatic type sub soil water level transmitter for tubewell. |
| 339 | CE & UL certified pressure transmitter |
| 340 | Auto phase reversal unit with inbuilt time delay 125 amp |
| 341 | Motor operated Actuators with Sluice valve of size upto 100 mm. at Main line and Bye-pass line of Tubewell. |
| 342 | CE & UL certified Electromagnatic Flowmeter suitable for above line size 100 mm. |
| 343 | Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT . |
| 344 | Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. |
| 345 | Supply & Laying of PVC insulated Al. armoured cable size 1x3.5/4Cx35 sq mm. from transformer LV side to meter panel and meter panel to starter. |
| 346 | SITC of Automatic type chlorinating plant solenoid driven dosing pump of capacity 0-6 LPH ( pressure 4kg/cm2 with ORP sensor to check and regulate the dosing along with 200 ltr capacity HDPE tank (02 nos., 1W+1S) ,standard fittings, wall/floor mountings MS bracket for dosing pump with GM Valve ,cock valve & sodium hydro chloride solution.,chlorine test kit with O.T. Solution complete with all respect.( suitable for 100-220V and 30-60 Hz , suction lift- 1.5 m., injection pressure 4 bars, steadt state accuracy +-3% repeatability +-3%) with RS 485 Port O/P having facility of interface with PLC SCADA system. |
| 347 | SITC of 03 Phase Servo Voltage Stabilizer 50 KVA. |
| 348 | PUMPING PLANT OF NEW TUBEWELL NO 3 (PROPOSED OHT CAMPUS) |
| 349 | SITC of Submersible Pumping Plant with 24m column pipe assembly,NRV,bend,Tee, D/F pipe, earthing, painting, Toolset, power wiring of pump house internal and external chain pulley block and all pumping plant accesssories with nut bolt ,rubber packing etc 1300 LPM, 64 m head, 30 HP or suitable capacity. |
| 350 | Soft starter with RS-485 port-400V Class 30 Kw rating or above as per site requirement. |
| 351 | Capacitor Bank 10 KVAR with Relay |
| 352 | 01 KVAR UPS at TW Panel |
| 353 | 150 mm size motor operated actuator with Sluice valve |
| 354 | 3 Mtr. long heavy duty size 150mm dia column pipe same as above spare. |
| 355 | CE & UL certified Inteligent Smart Energy Meter |
| 356 | CE & UL certified Hydrostatic type sub soil water level transmitter for tubewell. |
| 357 | CE & UL certified pressure transmitter |
| 358 | Auto phase reversal unit with inbuilt time delay 125 amp |
| 359 | Motor operated Actuators with Sluice valve of size upto 100 mm. at Main line and Bye-pass line of Tubewell. |
| 360 | CE & UL certified Electromagnatic Flowmeter suitable for above line size 100 mm. |
| 361 | Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT . |
| 362 | Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. |
| 363 | Supply & Laying of PVC insulated Al. armoured cable size 1x3.5/4Cx35 sq mm. from transformer LV side to meter panel and meter panel to starter. |
| 364 | SITC of Automatic type chlorinating plant solenoid driven dosing pump of capacity 0-6 LPH ( pressure 4kg/cm2 with ORP sensor to check and regulate the dosing along with 200 ltr capacity HDPE tank (02 nos., 1W+1S) ,standard fittings, wall/floor mountings MS bracket for dosing pump with GM Valve ,cock valve & sodium hydro chloride solution.,chlorine test kit with O.T. Solution complete with all respect.( suitable for 100-220V and 30-60 Hz , suction lift- 1.5 m., injection pressure 4 bars, steadt state accuracy +-3% repeatability +-3%) with RS 485 Port O/P having facility of interface with PLC SCADA system. |
| 365 | SITC of 03 Phase Servo Voltage Stabilizer 50 KVA. |
| 366 | ELECTRICAL / MECHANICAL WORKFOR NEW OVERHEAD TANK |
| 367 | Motor operated Actuators with Sluice valve of size 450 mm. at distribution line |
| 368 | CE & UL certified Electomagnetic Flowmeter for OHT line size 450 mm. dia |
| 369 | CE/UL Certified suitable capacity UPS with batteries. |
| 370 | Chlorine Analyzer rnge 0-5ppm (electrolyte with membrane cap; Type- Amperometric with PH compensator. |
| 371 | S.I.T.C OF SCADA SYSTEM ON NEW TUBEWELL 1, ZONE-1 |
| 372 | CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations. |
| 373 | G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges. |
| 374 | CE & UL certified 7\" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. |
| 375 | Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) |
| 376 | CE & UL certified Surge protector for above control panel |
| 377 | Installation, commissioning & testing for one tubewell |
| 378 | Trial run for three month period for tubewell |
| 379 | SCADA WORKS ON EXISTING OHT (Zone-1) |
| 380 | CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations |
| 381 | G.S.M./G.P.R.S. based wireless communication with 5G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges . |
| 382 | CE/UL certified Radar type Level Transmitter for Over haead Tank for Eisting OHT. |
| 383 | S.I.T.C OF SCADA SYSTEM ON NEW TUBEWELL 1, 2 & 3 (Zone-2) |
| 384 | CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations. |
| 385 | G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges. |
| 386 | CE & UL certified 7\" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. |
| 387 | Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) |
| 388 | CE & UL certified Surge protector for above control panel |
| 389 | Installation, commissioning & testing for one tubewell |
| 390 | Trial run for three month period for tubewell |
| 391 | SCADA WORKS ON NEW OHT (Zone-2) |
| 392 | CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations |
| 393 | G.S.M./G.P.R.S. based wireless communication with 5G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges . |
| 394 | CE/UL certified Radar type Level Transmitter for Over haead Tank for Eisting OHT. |
| 395 | MASTER CONTROL CENTERE (MCS) |
| 396 | CE/UL & BIS Certifed industrial grade LED MONITOR with latest configuration |
| 397 | (i) 65\" (upto 50 Tubewells). |
| 398 | Desktop/PC with i5/i7 processor for |
| 399 | CE/UL Certified 5KVA UPS with batteries . |
| 400 | Full development version of required TAGS SCADA Software with coustomization of sowftware for MCS as per requirement . |
| 401 | CE/UL Certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser |
| 402 | CE/UL Certified Field gateway agent for transfering data from MCS to Central control room. |
| 403 | GSM based wireless/Broaband/Equipment communication system for PLC capable to transfer & received data & gather data from remote sites to control satation, All accessories included signal enhancer antenna along with running expences, till DLP. |
| 404 | CE/UL Certified Firewall for network protection. |
| 405 | SURGE PROTECTOR FOR ETHERNET communication protection. |
| 406 | CE/UL certified industrial grade Ethernet Switch. |
| 407 | Mobile App Facility system architecture with mobile (industries internet based & viewed through mobile apps for increased local & Remote Visibility). |
| 408 | Canon/HP or equivalent Laser Printer 1018 or equivement. |
| 409 | Security Sureillance IP camera with recorder |
| 410 | Installion, Commissioning & testing including required furniture, A/c etc. |
| 411 | 03 MONTH TRIAL & RUN FOR PUMPING PLANT OF TUBEWELL |
| 412 | ZONE-1 |
| 413 | 03 Month trial & run of Pumping Plant for 01 No. tubewell including liquid Chlorine, Operating Staff. Excluding Electricity Charges. |
| 414 | ZONE-2 |
| 415 | 03 Month trial & run of Pumping Plant for 03 Nos. tubewell including liquid Chlorine, Operating Staff. Excluding Electricity Charges. |
| 416 | 03 MONTH TRIAL & RUN FOR MCS |
| 417 | 03 Month trial & run of MCS including Operating Staff. Excluding Electricity Charges. |