Supply of men and machinery under Flood Metigation (Flash floods if any) for the year 2025-26including Encroachment Drive if any carried on Veshow nallah from Pahloo Bridge to Sangam (R/S Embankment only), Vethvethroo nallah from D/S Nova Bridge to Confluence with Veshow at C-Pajan / Lassipora, Sandran nallah from D/S Vesoo Bridge to TB Shah, Naninard and Malwan nallah - 1 Earth work in bulk excavation by manual means over areas (exceeding30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge (In all kinds of soils) 2 Earth work in bulk excavation by mechanical means over areas (exceeding30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge (In all kinds of soils) 3 Silt clearance from canals inclusive of initial lead and lift (50 m and 1.5 m respectively) 4 Wet Silt 5 Dry Silt 6 Slip clearnace 7 In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. 8 In soils; mixed with moorum/Kankar/shingle/boulders; disposallead upto 50 m and lift upto 1.5 m. 9 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 10 Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shutteringand finishing with : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 11 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 12 Provifding laying and fixing of HDPE pipes including carriage (complete job STSR) 13 Hand-packing stones in wire-crates; excluding cost of crates and stones 14 Dumping of stones (nallah) excluding cost of stones in Horizontal on level 15 Filling empty cement bags with sand / earth, including cost of sewing and strings, excluding cost of bags and earth/ sand including loading/ unloadiong earth/sand filled bags in lorries lead upto 50 m 16 Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs and steps etc. 17 Supply of BA crates 18 Supply of stones (nallah) 19 Supply of EC Bags 20 Supply of polythene 21 Supply of earth 22 Carriage of materials:- 23 Stones 08 Km by MT 250 m by HL 24 Sand 15 Km by MT 250 m by HL 25 Aggregate 40mm 15 Km by MT 250 m by HL 26 Aggregate 20mm 15 Km by MT 250 m by HL 27 Cement 05 Km by MT 250 m by HL 28 Provision of supply of Cutters for removal of encroachments 29 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating eachdeposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 30 Arrangement of Mechanical Excavator for different spots during flash floods (if any 2025-26) includimg cost of services of operatinfg staff, including GST, supply of diesel, lubericating oil and other maintainance charging complete job 31 Arrangement of Poclain includimg cost of services of operatinfg staff, including GST, supply of diesel, lubericating oil and other maintainance charging complete job 32 Supply of labour {Skilled} 33 Supply of labour {Un-Skilled} 34 Arraangement of tractor including cost of services of operating staff, supply of diesel, lubericating oil and other maintainance charges etc complete job 35 Budloo / Fir wood (Planks)