| 1 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS:8329 : 150 mm dia Ductile Iron Class K-7 & K 9 pipes. |
| 2 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS:8329 : 250 mm dia Ductile Iron Class K-7 & K 9 pipes. |
| 3 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS:8329 : 300 mm dia Ductile Iron Class K-7 & K 9 pipes. |
| 4 | Providing and fixing ofHDPE Pipes complete including trenching and refilling etc. |
| 5 | PE 80 PN 12.5 DN 160mm dia |
| 6 | PE 80 PN 12.5 DN 140 mm dia |
| 7 | PE 80 PN 12.5 DN 125 mm dia |
| 8 | PE 80 PN 12.5 DN 110 mm dia |
| 9 | PE 80 PN 12.5 DN90mm dia |
| 10 | PE 80 PN 12.5 DN75 mm dia |
| 11 | PE 80 PN 12.5 DN63mmdia |
| 12 | Design, drawing and construction of RCC Drop-inlet headwork at Buk as per specification. |
| 13 | Design, drawing and construction of RCC Drop-inlet headwork at Kentor as per specification. |
| 14 | Design, drawing and construction of Pre sedimentation tank at Buk, with all necessary inflow,out flow and wash pipes |
| 15 | Design, drawing and construction of Pre sedimentation tank at Kentor, with all necessary inflow,out flow and wash pipes |
| 16 | Construction of Control room for Pump and installation of motor pump , wiring valves. |
| 17 | Design, drawing and construction of Areator, approach channel, flash mixture and parshal flame as per specification. |
| 18 | Design, drawing and construction of RCC circular clariflocculator tank including walk way slab, launder channel as per specification complete. |
| 19 | Design, drawing and construction of RCC Triple Storey Filter cum chemical house with provision of filter tank, filter beds, filter medias, backwash tank and provision of chemical storage as per required technical specification. |
| 20 | Design, drawing and construction of RCC clear water reservoirwith RCC slab ventilation, air vent of 65mm dia,beam and column as per technical specifications. |
| 21 | Design, drawing and construction of RCC chamber at WTPs and along the pipe line for valve operation as per technical specifications. |
| 22 | Construction of2 nos Elevated MS Stagging andZinc Alum OH tanksi/c pipe networkingas per required technical specification. |
| 23 | Design, drawing and construction of Compound Wall at WTPs as per required technical specification. |
| 24 | Providing and supply of necessary DIfittings as per standard specifications. |
| 25 | Providing and supply of necessary Tools & HDPE fittings as per standard specifications. |
| 26 | Providing and supply of necessary machinaries for execution of DI pipe laying as per standard specifications |
| 27 | Laying of DI & HDPE Pipes as per standard specifications |
| 28 | Design , Drawing and Construction of Anchor Block at Critical pipe bend along the pipe as per required technical specification |
| 29 | Design, supply,installation, testing, commissioning, operation and maintenance for one year warranty of Motor Pumps of various capacity and DG set of200 kVA. |
| 30 | Land development for WTP and porter tract for Laying DI Pipes. |
| 31 | Construction ofT Beam at critical point along the pipe line as per required technical specification. |
| 32 | Supply and Installtion of Water Meters as per standard specifications. |
| 33 | Providing 3 Phase power supply to WTP and Pump house located at Presedimentation / Near to Division office. |
| 34 | Installation and commisioning of Mechanical Appurtenances for Clariflocculator,Rapid sand filter House, Aerator,flush mixture in complete for WTP. |
| 35 | C/O Retaining wall at WTP. |
| 36 | O&M of the project |
| 37 | Consultancy Charge |