| 1 | Taking out unserviceable under mentioned components/parts for repair to Chair Easy by replacing with new ones complete with 1st class hard wood (teak wood) of size as shown on drawing Drg No FD-229 |
| 2 | Front leg |
| 3 | Rear leg |
| 4 | Side rail |
| 5 | Front and back rail |
| 6 | Arm rest |
| 7 | Taking out unserviceable under mentioned components/parts for repair to Chair Dining by replacing with new ones complete with 1st class hard wood (teak wood) of size as shown on drawing.Drg No FD-279 |
| 8 | Front leg |
| 9 | Rear leg |
| 10 | Side rail |
| 11 | Front and back rail |
| 12 | Stiffener |
| 13 | Back rest stiffener |
| 14 | Taking out unserviceable under mentioned components/parts for repair to Chair Writingby replacing with new ones with 1st class hard wood (teak wood) of size as shown on drawing.Drg No FD-280 |
| 15 | Front leg |
| 16 | Rear leg |
| 17 | Side rail |
| 18 | Front and back rail |
| 19 | Stiffener |
| 20 | Back rest stiffener |
| 21 | Arm rest |
| 22 | Taking out unserviceable under mentioned components/parts for repair to Stool Dressingby replacing with new ones complete as shownon drawings :- Drg No FD-252 |
| 23 | Leg |
| 24 | Long rail |
| 25 | Short rail |
| 26 | Stiffener |
| 27 | Re-canning of all type of chairs, stool dressing except chair verandah with 2mm to 2.5mm wide cane plastic white colour, half round, closely woven as per Godrej pattern including removal of existing cane complete.Drg No FD-229, 279, 280, 252 |
| 28 | All as per item No 5.00 but Chair verandah with 4mm wide plastic cane half round (Oval shape) complete.Drg No FD-359 |
| 29 | Complete removal of existing polish from al types of chairsby scraping and rubbing with abrasive cloth and applying two coats of french polish. complete as shownon drawings :- |
| 30 | Chair WritingDrg No FD-280 |
| 31 | Chair EasyDrg No FD-229 |
| 32 | Chair DiningDrg No FD-279 |
| 33 | Complete removal of existing paint from chair verandah by scraping and rubbing with abrasive cloth and applying two coats of synthetic enamel white paint over and including a coat of red oxide primer complete.Drg No FD-359 |
| 34 | Removing unserviceable rubber shoe of chair verandah and providing new hard rubber shoe in white colour as per sample kept with BSO yard.Drg No FD-359 |
| 35 | Removing unserviceable seat & back of chair verandah and supplying and fixing new PVC seat & back of 4mm thick sheet of PPCP material weight not less than 1.85 Kg suitable for chair verandah, white colour of approved quality as per sample kept with BSO yard.Drg No FD-359 |
| 36 | Removing unserviceable stiffner of chair verandah and providing new stiffner out of MS pipe18/19mm dia having wall thickness 1.6 mm and 470mm long with gas welding complete.Drg No FD-359 |
| 37 | Repairing to chair dining (MAP) by replacing the under mentioned u/s components/parts with new ones complete all as per drg.Drg No. FD/MAP-II/05 |
| 38 | Front leg |
| 39 | Rear leg |
| 40 | Side rail |
| 41 | Front and back rail |
| 42 | Stiffener |
| 43 | Back rest stiffener |
| 44 | Removing u/s PVC seat from chair dining & providing new PVC seat 4mm thick of PPCP material and weight not less than 0.50 Kgs with perforated holes and shall be fixed inside the frame of seat with proper screws as per sample approved by Engineer-in-charge..Drg No. FD/MAP-II/05 |
| 45 | Repairing of bed ply hard wooden/ steel (MAP) by replacing the under mentioned u/s components/parts with new ones complete all as per drg .Drg No. FD/E6/MAP/08(R ) |
| 46 | M & L for 12 mm thick commercial ply wood board BWR grade of existing size duly ISI marked.Drg No. FD/E6/MAP/08(R) |
| 47 | M & L for Hard rubber shoe superior quality as per drg.Drg No. FD/E6/MAP/08(R) |
| 48 | M & L for head made of 18mm thick prelaminated MDF board exterior grade one side teak face veneered andother side balancing white and having 6mm thick teak wood half round edging all round the head complete.Drg No. FD/E6/MAP/08(R) |
| 49 | M & L for foot made of 18mm thick prelaminated MDF board exterior grade one side teak face veneered andother side balancing white and having 6mm thick teak wood half round edging all round the foot complete.Drg No. FD/E6/MAP/08(R) |
| 50 | Removing existing unserviceable long rail of charpoy GI Pipe having both welded ends including S & F new long rail duly welded properly made out of GI tubing 32mm bore medium Gde all as per sample available of size of long rail to be replaced is 1980mm approx welding of new long rail as per best trade practice and complete all as specified anddirected by Engineer-in-Charge.Drg No : FD-220 |
| 51 | Removing of unserviceable short rail of charpoy GI Pipe having both welded ends including Provn of short rail to be converted from unserviceable long rail (02 Nos short rails to be obtained from Ser Item No 1.00 each unserviceable long rail) and fixing the short rail duly welded to replace the unserviceable short rails, Welding of ends of short rails as per best trade practice and complete all as specified anddirected by Engineer-in-Charge.Drg No : FD-220 |
| 52 | Removing of unserviceable legs of charpoy GI pipe having welded ends and including provn of legs to be converted from unserviceable short rails (02 Nos leg to be converted from unserviceable short rail obtained from Ser Item No 2.00 above) and fixing the legs duly welded as per best trade practice complete all as specified and directed by Engineer-in-Charge.Drg No : FD-220 |
| 53 | Removing of unserviceable 03 way elbow 32mm bore and supplyand fixing in position new elbow duly ISI marked complete all as specified and directed by Engineer-in-Charge. Drg No : FD-220 |
| 54 | Removing of unserviceable check nut and supply & fixing of new check nut 32mm bore 6mm thick and fixing the same in position complete all as specified anddirected by Engineer-in-Charge.Drg No : FD-220 |
| 55 | Removing of unserviceable 04 Nos MS round sheet from bottom of legs of charpoy and supply and fixing new MS sheet 40mm dia and 3mm thick in round shape welded to the bottom of legs duly welded complete all as specified and directed by Engineer-in-Charge.Drg No : FD-220 |
| 56 | Removing existing unserviceable ply wood from charpoy GI pipe and Supply & Fixing new Plywood BWR grade 12mm thick of size 1980mm x 900mm approx after cutting and made to shape including supply and fixing with MS Nut & bolts with MS Washer of approved size and qualilty (No of bolt to be used = 10 Nos each Charpoy, 08 Nos of size 3\"x6mm crazy bolt and 02 Nos 1\"x6mm crazy bolt) complete all as specified and directed.Drg No : FD-220 |
| 57 | Removing existing unserviceable nylon newar from Charpoy GI Pipe, tightening of loose check nuts, elbow, long rails, short rails and legs including supply and re-taping with 50mm wide (4 ply) white colour nylon newar not made out of recycled nylon, closely woven on both side and having weight not less than 1.5 Kg per charpoy complete as per drawing and as directed.Drg No FD-220 |
| 58 | Removing existing unserviceable stiffner and supply & fixing new stiffner made out of MS flat 30x5mm with one hole drilled in center of MS flat for GI nut and bolt, duly painted black and welded between the long rails complete all as specified and directed.Note :- Length of the Stiffener = 880mm approxDrg No : FD-220 |
| 59 | Removing existing unserviceable plywood from charpoy MS hardtop and S&F new plywood 12mm thick BWR grade of size 1980mm x 900mm (existing size) approx after cutting and made to shape including proper beading of 12mm x 5mm alround the plywood, supply & fixing with MS nut & bolts with washers of existing and approved size (04 Nos of size 2\"x6mm crazy bolt and 06 Nos 1\"x6mm crazy bolt) & quality complete all as per drg and as specified and directed.Drg No : FD/MAP-II/01 |
| 60 | Taking out unserviceable seatand providing new seat of required size (as per sample approved by GE) of chair CB steel with arms, fixed with steel screws and washers of appropriate size all as given here under :-Timber : It shall be first class hard wood teak (MP). The sizeof the rail of frame shall be 50 x 30mm.Cane : The plastic cane shall be 2 to 2.5mm wide white colour half round and 4mm wide plastic cane for boarder closely woven as per Godrej pattern. Finish : Two coats of black synthetic enamel paint over and including a coat of pink primer. Drg No FD-75(M) |
| 61 | All as per item No 24.00 here-in-before but backof chair CB steel with arms. Drg No FD-75(M) |
| 62 | All as per item No 24.00 here-in-before but seat of chair CB steel without arms. Drg No FD-75(M) |
| 63 | All as per item No 24.00 here-in-before but back of chair CB steel without arms. Drg No FD-75(M) |
| 64 | Taking out unserviceable arms of chair CB steel with arms and providing new arm rest of required size made out of 1st class hard wood teak (MP) duly black painted and fixed with steel screws and washers of appropriate sizes complete.Drg No FD-75(M) |
| 65 | Tightening of existing wooden arms rest with new steel screws and washers of appropriate size and painting arm with black paint after cleaning the surfaces by scraping with sand paper complete.Drg No FD-75(M) |
| 66 | Preparation of surfaces by scraping with sand paper and painting with two coat of synthetic enamel spray paint light grey to steel frame of chair CB steel with armscomplete.Drg No FD-75(M) |
| 67 | All as per item No 7.00 here-in-before but chair CB steel without arms. Drg No FD-75(M) |
| 68 | Taking out old clits of chair CB steel with arms and without arms and providing new clits under the seat made out of 25 x 3mm thick MS flat of length 75mm welded by gas welding on MS conduit pipe 25mm dia by continuous welding all around the joint complete.Drg No FD-75(M) |
| 69 | Providing hard rubber shoes to chair CB steel with/without arms complete.Drg No FD-75(M) |
| 70 | Providinghard plastic caps to chair CB steel with/without arms complete.Drg No FD-75(M) |
| 71 | Cutting existing defective piece of frame of chair CB steel with/without arms and providingnew piece of MS Conduit 20mm dia upto 10 cm long of existing size/bore having wall thickness 1.6 mm by gas welding all around complete.Drg No FD-75(M) |
| 72 | Note:- Schedule of credit Rs 26,370.00 will be deducted from total amount quoted while accepting the bid. Details of schedule of credit is given in tender documents. |