Supply Of Materials For The Gray Water Management Works Under Ragalparvi Gram Panchayat Under Mgnregs Scheme 2023-24 - Display Board Lrgl003,Add Brush Putty Sand Paper Roller At 5Perentage On Cost Of Paint Lrgl003,Plastic Emulsion Paint Lrgl003,Tractor - 40 Hp Lrgl003,Vibratory Roller 8 Tonne Lrgl003,Water Tanker Lrgl003,Gravel 2.36 Mm/Murrum Lrgl003,Water Lrgl003,Stone Aggregate(Single Size)20 Mm Nominal Size Lrgl003,Stone Aggregate(Single Size) 40 Mm Nominal Size Lrgl003,Laboratory Asst. (Sslc Passed)/Mate/Supervisor Lrgl003,Filter Media Stone Aggregates Lrgl003,Mixer (Concrete Small Used In Culvert) Lrgl003,Burnt Bricks Class 35 (Non Modular) Lrgl003,Pvc Pipe Of 6Kg Cum90 Mm Lrgl003,Add Brush At 1Perentage On Cost Of Paint Lrgl003,Enamel Metal Paintlrgl003,Add Providing And Removing Scaffolding At 3Perentage On Labour Lrgl003,Painter Class I Lrgl003,Add Wire Brush, Fine Steel Wool Putty Sand Paper At 3Perentage On Cost Of Paint Lrgl003,Ready Mix Primer Paint (Ready Mix Red Lead Paint) Lrgl003,Add Handling , Loading And Unloading At 1Perentage On Material Lrgl003,Add Hom Of Welding And Grinding Machine At 4Perentage On Material Lrgl003,Welder Grade I Lrgl003,Fitter Class I Lrgl003,Ms Flat Lrgl003,M.S Rods Lrgl003,Add Handling Loading And Unloading At 2Perentage On Material Lrgl003,Add Sundries Charges At 2 Perentage On Material Lrgl003,Casurina Poles 100 - 150 Mm Lrgl003,Silver Oak Or Equivalent Planks 38 Mm Thick Lrgl003,Jungle Wood Runners And Planks Lrgl003,Binding Wire Lrgl003,Tmt Bars Fe 500 Lrgl003,Hom Of Vibrator 0.71 Days Lrgl003,Plasticizer / Super Plasticizer Lrgl003,Add Watering Charges At 1 Perentage On Material Lrgl003,Mixer (Concrete) - 1 Cum Capacity Lrgl003,Portland Cement Lrgl003,Coarse Sand (Zone Iii) Lrgl003,Broken Stone Aggregate 12 Mm To 10 Mm Size Lrgl003,Broken Stone Aggregate 20 Mm Size Lrgl003,Add Sundries Charges At 1 Perentage On Materia Lrgl003