Providing Of Men, Machinery, Materials For Execution Of Emergent Works At Site As Per Requirements Due To Breaches/Floods /Calamities/Encroachments Removal Etc. Of Irrigation Sub-Division Bawan (Minor Irrigation) For The Year 2025-26 - 1 Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 2 Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 3 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil. 4 Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. 5 Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. 6 Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material All kinds of soil. 7 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 8 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages upto site of work,complete job as per the directions of Engr-in-charge 9 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all carriages upto site of work,complete job as per the directions of Engr-in-charge 10 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). including all carriages upto site of work,complete job as per the directions of Engr-in-charge 11 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages upto site of work,complete job as per the directions of Engr-in-charge 12 Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones 13 Supply and fixingof 4mm dia B.A wire woven crates with lid /binding wire.(4x4 mesh) as per ISI specification including all carriages ( manual /Mechanical) up to site of workcomplete Job 14 Dumping stone excluding cost of stones. In Horizontal on level 15 Supply of stones including carriage by M.T and head load. 16 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 17 Providing and laying earth filled cement bags including cost of EC bags, cost of excavation (available Earth), filling , loading, unloading , laying,Sewingand strings etc all carriagesupto site of work complete job as per the directions of Engr-in-charge 18 Providing and laying earth filled cement bags including cost of EC bags,filling , loading, unloading , laying,Sewingand strings etc all carriagesupto site of work complete job as per the directions of Engr-in-chargeNote:- Supply of earth shall be paid separately. 19 Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) including all carriages complete Job 20 Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. 21 Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. 22 Slip Clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. 23 Weed clearance From canals(including extraction of roots) 24 Opening out old wire crates those and re-binding after filling. 25 Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively): 26 Dry 27 Wet 28 Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. 29 Dismantelling/ Dismembering of existing winch machines from super structure, includingwinch rods, connecting rods,casing etc. and making good/ operational by removing dents from winch rods/ gate shutters and repair to winch machines by cleaning, greasing & petty repairs and reassembling the same after repairs including the alignment complete job 30 Repairs to existing winch machines, gate shutters etc by way of greasing & making gates opeational. 31 Construction of x-bund by Mechancical mean including all carriages upto site of Work Complete Job as directed by Engineer-in-Charge. 32 Shingle clearance from canals. 33 Providing and fixing 20mm thick wooden planks ceiling (frame work for base to be paid for separately) with M.S. screws ( Budloo/fir wood ) 34 Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) 35 12mm Cement plaster of mix:1 : 4 (1 cement : 4 fine sand) 36 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded. 37 Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages upto site of work,complete job as per the directions of Engr-in-charge 38 Quarry 39 Nallah 40 Dry random rubble masonry with hard stone in foundation and plinth: including all carriages upto site of work,complete job as per the directions of Engr-in-charge 41 Quarry 42 Nallah 43 Engagement of labour / Beldar, Mazdoor 44 Fitter/Blacksmith IInd Class/Painter/mason/carpenter 45 Hire charges of Concrete Mixer 0.25 to 0.40 cum with hopper. 46 Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job 47 Hire charges ofChain MountedEarth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job 48 Hire charges of Tippers including driver etc 49 Hire charges of Tractors including driveretc complete job 50 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 51 Beyond 30cm girth upto and including 60cm girth. 52 Beyond 60cm girth upto and including 120cm girth 53 Providing and laying of polythene of specified weight of 250 gsm of approved brand and colour incl. all carriages complete job. 54 Providing and Laying PVC Pipe Of approved brand and quality 55 250 mm 56 200 mm 57 150 mm 58 100 mm 59 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etcincluding all carriages upto site of work,complete job as per the directions of Engr-in-charge 60 600mm 61 450mm 62 300mm 63 250mm 64 Supply of Heavy Duty Brush Cutter, Grass Cutter with 52CC Displacement-1650W of approved make and brand 65 Supply of fuel (petrol ) 66 Supply of Diesel. 67 Supply of Engine oil. 68 Supply of Heavy Duty 2 Kg Axe with Strong Wooden Handle. Sharpened Blade in Solid Strong one-Piece Iron. 69 Hire charges for taxi / cab including driver 70 Hire charges of D.G set and Welding machine for Welding purposes including Blacksmith, Fuel charges and all carriages complete job