}

Tender For Providing Men, Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches/ Floods/ Calamities Etc For The Year 2025-26 Of Sub Division Banimulla (Stage Contract), Kulgam-Jammu And Kashmir

Irrigation And Flood Control Department has published Tender For Providing Men, Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches/ Floods/ Calamities Etc For The Year 2025-26 Of Sub Division Banimulla (Stage Contract). Submission Date for this Tender is 27-03-2025. Prime mover hiring Tenders in Kulgam Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

48261980
Corrigendum : Tender For Providing Men, Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches/ Floods/ Calamities Etc For The Year 2025-26 Of Sub Division Banimulla (Stage Contract)
Open Tender
NCB
Jammu And Kashmir
Kulgam
27-03-2025

Tender Details

Providing Men, Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches/ Floods/ Calamities Etc For The Year 2025-26 Of Sub Division Banimulla (Stage Contract)- 1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : 2 Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge.All kinds of soil : 3 Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge.All kinds of soil : 4 Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet 5 Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry 6 Slip clerance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. 7 slip clearance mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. 8 Extra forevery additional lift of 1.5 m or part thereof in excavation/bankingexcavated or stacked material : All kinds of soil 9 Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. 10 Supply of EC Bags 11 Laying in position earth filled bags as per the directions of Engineer incharge excluding the cost of EC bags supply of earth filling excavated earth into bags and earth / sand 12 Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) 13 providing and laying of polyethene of specified weight of apporved brand and color including carrigae complete job 14 CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 15 CAST-IN-SITUProviding and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 16 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. 17 Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 25mm thick with 12.5 mm nominal size stone aggregate. 18 Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. 19 Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50mm thick with 20 mm nominal size stone aggregate. 20 Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. 21 Dumping stone excluding cost of stones. in Horizontal on level 22 Hand-packing stones in wire-crates; excluding cost of crates and stones 23 Supply of 4” x 4” mesh and 16’ x 16’ B A Wire crate should be of 4mm dia confirming to IS280 in tensile strength and otherdetails should be confirming to relevant IS specifications (IS Code). 24 supply of binding wire for lids / binding crates @ 2kg per crate 25 opening out old wire crates those and rebinding after filling 26 supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) 27 Dismentling of winch machines from super structure inluding winch rods connecting rods, casings etc and making good / operational by removing dents from winch rods and repair to winch machines by cleaning greasing etc complete job 28 Removing / Refixing for making good existing gate shutters of any size and providing welding whereever, necessary and repairs / denting to guide channels whereever necessary including all carriages complete job. As per directions of Engineer incharge 29 Surface dressing of the ground including removing vegetation and in-equalitiesnot exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. 30 construction of muthu bunds comprising of boulders and wood bushes in alternate layers including working in water situations 31 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded 32 Engagement of hydraulic excavator / JCB for different nature of works including fuel charges complete job 33 CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) 34 Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 100 mm dia. nominal bore (Medium) 35 Providing and fixing in position flats upto 10mm thickness including cutting, hoisting and welding complete job 36 Carriage of materials from source to road site of work b mechanical transport including loading unloading and stacking at site cement for an average lead of 5 kms 37 sand for and avg lead of 5 kms 38 stone agg avg lead of 5 kms 39 soling stone avg lead 5 kms 40 Earth avg lead of 5 kms 41 EC Bags avg lead of 5 kms 42 G I pipes 100mm dia for avg lead of 5 kms 43 steel for avg lead of 5 kms 44 Extra for every additional lead of 1 km beyond 5 kms upto 10 kms by Mechanical Transport 45 cement 46 sand 47 stone agg 20 mm 48 soling stone 49 earth 50 EC Bags 51 GI Pipes 100 mm dia 52 steel 53 Extra for every additional lead of 1 km beyond 10 kms upto 20 kms by Mechanical Transport 54 cement 55 sand 56 stone agg 20 mm 57 soling stone 58 earth 59 EC Bags 60 GI Pipes 100 mm dia 61 steel 62 Carriage of materials fro an avg lead of 50 mtrs by head load 63 cement 64 sand 65 stone agg 20 mm 66 soling stone 67 earth 68 EC Bags 69 GI Pipes 100 mm dia 70 steel 71 Extra carriage of materials fro an avg lead of 50 mtrs by head load beyond 1st 50 mtrs 72 cement 73 sand 74 stone agg 20 mm 75 soling stone 76 earth 77 EC Bags 78 GI Pipes 100 mm dia 79 Steel

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 17-03-2025 Unbalanced bidder Technical Bid 27-03-2025

Key Value

Document Fees
INR 300 /-
EMD
INR 5000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail