|
| 1 | MECHANICAL WORKSSupply, Installation, Testing & Commissioning of Electric HeatedIndustrial Washer Extractor alongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc.30 Kg capacity : |
| 2 | Supply, Installation, Testing & Commissioning of Drying Tumbler.Front Loading,alongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc;30 Kg capacity : |
| 3 | Supply, Install, testing and Commissioning of Flat Bed Press. Head Size: 1500 x 750. Electric Heated: alongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc |
| 4 | Supply, Installation, Testing & Commissioning of Vacuum Finishing Tablealongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc. Rectangular table top with S.S heater, Size : 1200 x 750,along with Electric Steam Iron & Teflon Shoe |
| 5 | Supply, Installation, Testing & Commissioning of Steam Generator.Electric, Portable & Fully Automaticalongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc. Steam Capacity 4 Kg / hr |
| 6 | Supply, Installation, Testing & Commissioning of Air Compressors.Fully Automaticalongwith necessary fittings and power supply with protective and preventive devices viz MCCB etc |
| 7 | Supply ofWashroom Trolley.50 Kg capacity (850X600X800mm) |
| 8 | Supply, installation and testing of 1000 ltrs HDPF tank along with all requisite fittings.The job includes p/f of MS plate of 6 mm thickness (3m x 2m) duly supported on ISMC 100 flank cross weld supports. |
| 9 | SIT & C of 20mm GI B-class pipeline along with fittings. |
| 10 | SIT & C of 25mm GI B-class pipeline along with fittings. |
| 11 | SIT & C and excavated earthwork embedding with back filing of HDPE 2000 Litres primary storage tank with necessary 25 mm PPR supply and return piping through 1/2HP water pump ,20mm/20mm inlet & outlet, with all necessary fittings to overhead secondary tank. |
| 12 | Supply ,installation and testing of 20mm valves , 25mm valves as per requirment. |
| 13 | ELECTRCAL WORKSSupply, installation and testing of 3.5core 50sqm AL armoured cable of reputed make |
| 14 | Providing & fixing of 200amps. Changeover switch. |
| 15 | Providing and fitting of 150 amps MCCB |
| 16 | Operation wiring inside plant room & ironing cabin lighting etc |
| 17 | Fabrication and installation of wall mounted MS panel powder coated dust/vermin proof to be fabricated out of 14SWG sheet. The panel shall comprise of 3 phase Neon indicating lamps, voltmeter, ammeter, 3 phase selector switches, copper bus bar of 150 amp. capacity with provision for accomodating the preventive and protective devices as shall be required. The job also includes fitting the panel on the wall with the help of fastners etc. |
| 18 | P/f of Galvanised Mild steel perforated cable trays of width 100mm, thickness not less than 3 mm duly supported on MS structural steel bracket supports , nu bolt hangers with over and around proximity to washer and drying tumbler. |
| 19 | Operation and MaintenanceProviding of manpower (03 Nos.) for operation and upkeep of Laundry Equipment at SDH pahalgam for a period of 12 Months post date of commissioning of the system. |