Supply Work Motor Repair Hetu Spare Supply Ka Karya , Laying And Jointing Pvc Pipe. Heading , 100 Mm Ci Djoint Complete With Nut Bolt Ring , 150 Mm Ci Djoint Complete With Nut Bolt Ring , 100Mm Ci Djoint Class 10Completewith Nut Bolt Rubber Ring , 150Mm Ci Djointclass 10Complete With Nut Bolt Rubber Ring , 200Mm Ci Djoint Class 10 Complete With Nut Bolt Rubber Ring , 250Mm Ci Djoint Class 10 Complete With Nut Bolt , Rubber Ring , 3 Core 10Mm Flat Submersible Cable , 500 A Kit Kat Set On Bakelite Sheet (3No X 1 Set) , 15 H.P Submersible Motor Pump( 4 X 4 Stage) Complete Repair With New Rewinding , Rotor Balancing , Upper Lower Housing Bush Replaced ,Neck Ring, Key, Impeller , Coupling, Rotor Polishing,Thrust Plate,S.S Sleeves,Stage Bowl Repair,Sand Guard, Nrv,Stud With All Labour T&P Etc Required For Completion. , 25 H.P Submersible Motor Pump (4 X 4Stage) Complete Repair With New Rewinding ,Rotor Balancing ,Upper Lowerhousing Bush Replaced,Neck Ring , Impeller, Key ,Coupling ,Rotor Polishing, Thrust Plate, Ss Sleevesstage Bowl Repair ,Sand Guard ,Nrv,Stud With All Labour T&Petc Required For Completion , 7/16 Electrical Lead Wire , S/F Mug 30 L&T Make Starter Panel , S/F Mug 50 L&T Make Starter Panel , Electrical Cable Copper Lugs (100Mm,70Mm,50Mm, 35Mm,20Mm) As Required & Complete Electrical Work , Electrical Cable Aluminium Lugs (100Mm,70Mm, 50Mm,35Mm,20Mm)As Required & Complete Electrical Work , S/F100mm Reflexvalve Complete With Nut Bolt Rubber Packing Etc Required For Completion. , S/F 150Mm Reflex Valve Complete With Nut Bolt , Rubber Packing Etc Required For Completion. , Fastener Bolt ( 12Mm,10Mm,8Mm) , Gate Valve Screwing100mmm , Gate Valvescrewing 50Mm , Pulling, Lifting Of Old 100Mmsluice Valve From Chamber Replacedwith New S/F100mmsluice Valve Complete With Nut Bolt, Rubber Packing Labour ,T &P Etc Required For Completion , Pulling, Lifting Of Old 150Mmsluice Valve From Chamber Replacedwith New S/F150mmsluice Valve Complete With Nut Bolt, Rubber Packing Labour ,T &P Etc Required For Completion , Pulling ,Lifting Of Old 250 Mm Sluice Valve From Chamber Replaced With New S/F 250 Mm Sluice Valve Complete With 2Tile Piece, Nut Bolt,Rubber Packing, Ci Ring,Labour ,T&P Etc Required For Completion , 100 Ampere Electronic Change Over , Supply Of Chain Pulley 5 Ton With6mtr Chain Etc , Repair Of Mug 30 L&T Starter Panel , Repair Of Mug 50 L&T Starter Panel , Leakage Protection Waterproofing Rubber Tape , Gland Packing Dori (3Mm-5Mm) , Fuse Wire 18 Gauze , M.Scolumn Pipe Df 100 Mm Diameter , M.S Column Pipe Df 150 Mm Diameter , Nut Bolt Of Various Sizes , Rajdhani 2.5Mm Cable , St Tape , Steelgrip Pvc Electrical Insulation Type , 3 Hp Sewage Submersible Pump With 10Mtr Delivery Pipesingle Phasemake (Crompton/ Ksb ) Complete