}

Tender For Road Signage Work On Amar Shaheed Path Highway-27 (Old Highway 56A And B) Shaheed Path (Lucknow Bypass) Between Km 0.000 To 22.875 - Signage Work - Providing And Laying Of Hot Applied Thermoplastic Compound 2.5 Mm Thick Including Reflectorising, lucknow-Uttar Pradesh

Public Works Department has published Tender For Road Signage Work On Amar Shaheed Path Highway-27 (Old Highway 56A And B) Shaheed Path (Lucknow Bypass) Between Km 0.000 To 22.875 - Signage Work - Providing And Laying Of Hot Applied Thermoplastic Compound 2.5 Mm Thick Including Reflectorising. Submission Date for this Tender is 13-03-2025. Signage Tenders in lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48152238
Tender For Road Signage Work On Amar Shaheed Path Highway-27 (Old Highway 56A And B) Shaheed Path (Lucknow Bypass) Between Km 0.000 To 22.875 - Signage Work - Providing And Laying Of Hot Applied Thermoplastic Compound 2.5 Mm Thick Including Reflectorising
Open Tender
NCB
Uttar Pradesh
Lucknow
13-03-2025

Tender Documents

Tender Details

Road Signage Work On Amar Shaheed Path Highway-27 (Old Highway 56A And B) Shaheed Path (Lucknow Bypass) Between Km 0.000 To 22.875 - Signage Work - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:3:6 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect. The Rates shall include cost of design, fabrication, supply, transportations, Local shifting Erection of Signage structure using crane, inclusive of all taxes etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge.

Key Value

Document Fees
INR 2714 /-
EMD
INR 790000.0 /-
Tender Value
INR 1.16 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents-1 0 KB
Click here to download tender document Tender Documents-1 0 KB
Click here to download tender document Tender Documents-1 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail