Name of Work: DESIGN AND PROCUREMENT OFPRESSURE REDUCTION SKID FOR NGNLETEKUJAAN TERMINAL UPTO NRL IGGL PIPELINE PROJECT
Sl. No.
Item Description
1
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF FOLLOWING ITEMS
2
Vendor shall be completely responsible to supply below mentioned materials and services for satisfying the functional / operational requirements stated in this Material Requisition and its Attachments: Pressure Regulating Skid (PRS): Inlet pressure of 42 Barg, Outlet pressure of 38.50-35 Barg and flow capacity of 0.5 MMSCMD (Please follow attached datasheet)PRS shall consist of dual stream Regulation Skid, with Electronic Volume Correction device designed as per PNGRB regulations with below scope of supplies.Pressure Regulation (1W+1S) configuration, Pressure Regulation shall be automatic change-over provision , along with necessary Instrumentation such as gauges (PG, PIT, TG, ), Pressure & Temperature Sensors, valves ( Slam shut-off valve), Pipe, drain and vent lines, Tubes and fittings and accessories like Expander, Reducer,battery, supply of hardwired cable and cabling, junction box, and also including skid canopy, P&ID, Data sheets, Specifications etc.,
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.