| Sl. No. | Item Description |
| 1 | STRENGTHENING AND RENOVATION WORKS FOR EXISTING OVER HEAD TANK (Zone 1) |
| 2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after . The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially , necessary deduction for scaffolding in the existing item to be done. |
| 3 | Surface Preparation:- Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge |
| 4 | 25mm average thickness |
| 5 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry , all complete as per direction of Engineer-In-Charge. |
| 6 | Provision of following works-Provison for the surface of structure to be treated for strengthening to be roughened properly either by raking joints or by hacking the cement concrete surface with a specially made hacking tool or other wise alternatively to make the surface rough and dust free by providing spatter key or wire brush. |
| 7 | Injection grouting in vertical surface/wall Placing and fixing nozzle by drilling machine in tank wall having minimum dia of Nozzle 15mm and provided on a regular interval not exceeding 1m including construction joints. Injection of pidicrete AM (polymer based on shrinkage high strength grout) admixed with cement through nozzles under pressure by sump @ 250 gms per bag of cement. Sealing the nozzle after grouting with Polymer product mixed with cement. |
| 8 | Repairing of spalled and lose concrete where reinforcement is exposed apply like fixit rust remover by means of brush to the reinforcement for clearing bars and steel surface then apply a bonding coat of acreylic based polymer with cement slurry in 1:1 ratio to the pre-wet cencrete by brush. Now apply the mixture of 1:1 cement, coarse sand to the prepared substrate when primer becomes tacky. of 50 mm thick M25 grade.(Taking 20% of total surface area of OHT) |
| 9 | Change of S.S. ladder inside the tank, repair of M.H. cover of top dome, change of masquoto jali with new one complete. |
| 10 | Supply and fixing of 20 mm dia G.I. pipe railling in stair case and balcony. Taking only 50% new and 50% old materials) |
| 11 | Supply and fitting of lighting conductor on top dome and making earthing with required earthing wire from top to bottom of tank as per direction of engineer in charge. |
| 12 | 100 mm thick 1:4:8 plain cement concrete and 100 mm thick RCC M15 flooring with apron with 3mm floating coat of neat cement including supply of all materials, labour, T&P etc complete. |
| 13 | Painting of outer surface of OHT from Top to bottom with weather proof paint (like apex etc.) as per direction of engineer incharge. |
| 14 | RCC work with cement, coarse sand and 20mm gauge approved stone ballast in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and fixing and binding the same with 0.50mm thick binding wire (to be supplied by the contractor) centering and supply of all materials, labour, T&P etc. required for proper completion of the work. |
| 15 | Mild steel or iron work in plain work such as R.C. or R.B. work (When not included, in over all rates) brought to required shape, as necessary including binding for proper completion of work including supply of steel and wastage. |
| 16 | 1st class brick work in 1:4 cement and Coarse sand mortar in damaged portion of boundary wall including supply of all materials labour, T&P etc. required for proper completion of the work. |
| 17 | 12mm thick plaster with cement mortar consisting cement coarse sand in ratio 1:4 work minimum thickness not to be less than 10mm on boundary wall including supply of all materials, labour T&P etc. required work. |
| 18 | Painting on boundary wall & other existing buildings with one priming coat and one coat of approved exterior paint like Apex including supply of all labour, material T&P etc. required for proper completion of work. |
| 19 | Painting on iron work in small areas with one coat priming and one coat of approved paint including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 20 | Dismantling of reinforce Cement concrete or reinforce brick work including sorthing and stacking of serviceable of disposal of unserviceable material within a distance of 50m. |
| 21 | Removal of silt and dismantle concrete debris deposited inside the container portion and its desposal, washing, disinfecting & cleaning etc. complete. |
| 22 | Supply of all material,labour, T&P etc. for fixing of additional vertical pipe for existing OHT of 15 m staging |
| 23 | Rennovation of Pump house cum chloronome (3.60X3.00M) including supply of all materials, labour and T&P for proper completion of work. (Zone 1) |
| 24 | RISING MAIN ZONE-1 |
| 25 | Supply of ISI marked S&S Centrifugally Cast (Spun) Ductile Iron pipes as per IS : 8329-2000 suitable for Push on jointing by compatible rubber gasket confirming to IS: 9523 : 1980 at divisional store including all taxes |
| 26 | 150 mm dia - Class K-9 PH TO OHT TW-1 |
| 27 | Earthwork in excavation in pipe line with lift upto 1.5 m. and lead upto 50m. Including filling back, watering, ramming of excavated earth into trenches and disposal of sur plus earth within 50 metre with display of flags, caution boards, fencing, lighting, watching etc complete. |
| 28 | In ordinary soil |
| 29 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 30 | 150 mm Dia |
| 31 | Supply of following size screwed down type C.I. single ball air valves. |
| 32 | 50 mm dia |
| 33 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 34 | 50 mm dia. |
| 35 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 36 | Provision of construction of RCC thrust block of grade M-20 for water hammer at bends of pipe. |
| 37 | Supply of reinforcement including cutting bending etc complete for surface reinforcement. |
| 38 | Provision for crossing of nala, road, culvert excluding supply of C.I. tyton pipe/MS pipe and specials, but including their laying, jointing etc. complete. |
| 39 | More than 1.0M (Avrage rate more than 1 meter) |
| 40 | Less Than 1.0M (Avrage rate more than 1 meter) |
| 41 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 42 | Interlocking Road |
| 43 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. As per PWD specifications (Detail attached) deducted gst |
| 44 | Interlocking Road |
| 45 | DISTRIBUTION ZONE-1 |
| 46 | Supply of following sizes HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications includingF.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer -in - charge. |
| 47 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 48 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 49 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 50 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 51 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest/relevant I.S. specifications suitable forD.I pipes as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches. All complete as per instructions of Engineer -in - charge. |
| 52 | 200 mm dia DI Pipe K-7 |
| 53 | 250 mm dia DI Pipe K-7 |
| 54 | 300 mm dia DI Pipe K-7 |
| 55 | Supplying the following dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 56 | Sluice valve |
| 57 | 80 mm dia |
| 58 | 100 mm dia |
| 59 | 150 mm dia |
| 60 | 200 mm dia |
| 61 | 250 mm dia |
| 62 | Scoure valve |
| 63 | 80 mm dia |
| 64 | Supply of single / double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 65 | 50 mm |
| 66 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S. specifications including all taxes and insurance up to site of work (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer ‐in ‐ charge. |
| 67 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. (OD+600)mm |
| 68 | In ordinary soil |
| 69 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of HDPE pipes, specials coupling, fittings etc.to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines (excluding trenching), but including cutting of pipes for making joints. |
| 70 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 71 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 72 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 73 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 74 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 75 | 200mm dia |
| 76 | 250mm dia |
| 77 | 300mm dia |
| 78 | Carting of sluice valves / scour valve from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes to site of work, lowering in already prepared trenches and fixing them in position ,making flange joints including supply of all materials such as bolts, nuts, rubber insertion, white lead, testing etc . complete. |
| 79 | Sluice valve |
| 80 | 80 mm dia |
| 81 | 100 mm dia |
| 82 | 150 mm dia |
| 83 | 200 mm dia |
| 84 | 250 mm dia |
| 85 | Scour Valve |
| 86 | 80 mm dia |
| 87 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 88 | 50 mm |
| 89 | Carting from store to site of works(upto 8Km. or within municipal limit which is more) of 80mm dia size flanged fire hydrant to site of work, fixing them in position for flanged joints . |
| 90 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 91 | Surface box type including supply and fixing of 150mm x 150 mm size surface box. (upto 125 mm dia valve) |
| 92 | Masonry type with RCC cover (more than 150 mm dia valve) |
| 93 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 94 | Supply of all materials, labour, T&P etc. and construction of fire hydrant chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 95 | Design and construct Thrust Block made inR.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 96 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with wire at every inter-section, complete as per drawing and direction. |
| 97 | Making Nala crossing falling on alignment of pipe line including cost of D.I. pipe one no. (5.50m length) including supply of all materials, labour, T&P, etc complete required for propercompletion of work. |
| 98 | width 0.3 m to 0.5 m |
| 99 | width 0.5 m to 1.0 m |
| 100 | width 1.0 m to 1.5 m |
| 101 | width 1.5 m to 3.0 m |
| 102 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 103 | Bituminous Road as per NP specs |
| 104 | Brick Road (BOE) |
| 105 | CC Road |
| 106 | Inter locking tile Road |
| 107 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 108 | Bituminous Road as per NP specs |
| 109 | Brick Road (BOE) |
| 110 | CC Road |
| 111 | Inter locking tile Road |
| 112 | Shifting (Payment made to other department) of existing services like electric pole, telephone pole, gas pipe line, etc during the execution of work as per requirement |
| 113 | Supply all materials, labours and t&p etc and construction of R.C.C. over head tank of 1500 KL capacity and 22 m staging with main components, excluding cost of soil testing. (Zone-2) |
| 114 | Construction of Pump House- Cum-Chloronome of size 3.60 x 3.0 M x 3.0 & 1.80 x 1.20 x 3.0 M including supply of all materials, labour, T&P etc. required for proper completion of work as per departmental type design. (Zone 2) |
| 115 | Construction of 300 KL capacity Clear Water Reservoir (CWR) with pump house and chloronome of following Capacity including supply of structural drawing and design, supply of all materials, labour and T&P etc complete as per detailed design and drawing supplied by the contractor and approved by the compitent authority with construction of screen channel and fabrication and installation of screens. (ZONE-2) |
| 116 | RISING MAIN ZONE-2 |
| 117 | Supply of ISI marked S&S Centrifugally Cast (Spun) Ductile Iron pipes as per IS: 8329-2000 suitable for Push on jointing by compatible rubber gasket confirming to IS : 9523 : 1980 at divisional store including all taxes |
| 118 | 200 mm dia PH TO CWR |
| 119 | 250 mm dia from CWR to OHT |
| 120 | Earthwork in excavation in pipe line with lift upto 1.5 m. and lead upto 50m. Including filling back, watering, ramming of excavated earth into trenches and disposal of sur plus earth within 50 metre with display of flags, caution boards, fencing, lighting, watching etc complete. |
| 121 | In ordinary soil |
| 122 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 123 | 200 mm dia PH TO CWR |
| 124 | 250 mm dia from CWR to OHT |
| 125 | Supply of following size screwed down type C.I. single ball air valves. |
| 126 | 50 mm dia |
| 127 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 128 | 50 mm dia. |
| 129 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 130 | Provision of construction of RCC thrust block of grade M-20 for water hammer at bends of pipe. |
| 131 | Supply of reinforcement including cutting bending etc complete for surface reinforcement. |
| 132 | Provision for crossing of nala, road, culvert excluding supply of C.I. tyton pipe/MS pipe and specials, but including their laying, jointing etc. complete. |
| 133 | More than 1.0M (Avrage rate more than 1 meter) |
| 134 | Less Than 1.0M (Avrage rate more than 1 meter) |
| 135 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 136 | Interlocking Road |
| 137 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. As per PWD specifications |
| 138 | Interlocking Road |
| 139 | DISTRIBUTION ZONE-2 |
| 140 | Supply of following sizes HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications includingF.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer -in - charge. |
| 141 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 142 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 143 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 144 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 145 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest/relevant I.S. specifications suitable forD.I pipes as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches. All complete as per instructions of Engineer -in - charge. |
| 146 | 200 mm dia DI Pipe K-7 |
| 147 | 250 mm dia DI Pipe K-7 |
| 148 | 300 mm dia DI Pipe K-7 |
| 149 | 350 mm dia DI Pipe K-7 |
| 150 | 450 mm dia DI Pipe K-7 |
| 151 | Supplying the following dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 152 | Sluice valve |
| 153 | 80 mm dia |
| 154 | 100 mm dia |
| 155 | 150 mm dia |
| 156 | 200 mm dia |
| 157 | 250 mm dia |
| 158 | 300 mm dia |
| 159 | Scoure valve |
| 160 | 80 mm dia |
| 161 | Supply of single / double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 162 | 50 mm |
| 163 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S. specifications including all taxes and insurance up to site of work (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer ‐in ‐ charge. |
| 164 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. |
| 165 | In ordinary soil |
| 166 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of HDPE pipes, specials coupling, fittings etc.to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines (excluding trenching), but including cutting of pipes for making joints. |
| 167 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 168 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 169 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 170 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 171 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 172 | 200mm dia |
| 173 | 250mm dia |
| 174 | 300mm dia |
| 175 | 350mm dia |
| 176 | 400mm dia |
| 177 | 450mm dia |
| 178 | Carting of sluice valves / scour valve from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes to site of work, lowering in already prepared trenches and fixing them in position ,making flange joints including supply of all materials such as bolts, nuts, rubber insertion, white lead, testing etc . complete. |
| 179 | Sluice valve |
| 180 | 80 mm dia |
| 181 | 100 mm dia |
| 182 | 150 mm dia |
| 183 | 200 mm dia |
| 184 | 250 mm dia |
| 185 | 300 mm dia |
| 186 | Scour Valve |
| 187 | 80 mm dia |
| 188 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 189 | 50 mm |
| 190 | Carting from store to site of works(upto 8Km. or within municipal limit which is more) of 80mm dia size flanged fire hydrant to site of work, fixing them in position for flanged joints . |
| 191 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 192 | Surface box type including supply and fixing of 150mm x 150 mm size surface box. (upto 125 mm dia valve) |
| 193 | Masonry type with RCC cover (more than 150 mm dia valve) |
| 194 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 195 | Supply of all materials, labour, T&P etc. and construction of fire hydrant chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 196 | Design and construct Thrust Block made inR.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 197 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with wire at every inter-section, complete as per drawing and direction. |
| 198 | Making Nala crossing falling on alignment of pipe line including cost of D.I. pipe one no. (5.50m length) including supply of all materials, labour, T&P, etc complete required for proper completion of work. |
| 199 | width 0.3 m to 0.5 m |
| 200 | width 0.5 m to 1.0 m |
| 201 | width 1.0 m to 1.5 m |
| 202 | width 1.5 m to 3.0 m |
| 203 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 204 | Bituminous Road as per NP specs |
| 205 | Bituminous Road as per PWD specs |
| 206 | Brick Road (BOE) |
| 207 | CC Road |
| 208 | Inter locking tile Road |
| 209 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 210 | Bituminous Road as per NP specs |
| 211 | Bituminous Road as per PWD specs |
| 212 | Brick Road (BOE) |
| 213 | CC Road |
| 214 | Inter locking tile Road |
| 215 | Shifting (Payment made to other department) of existing services like electric pole, telephone pole, gas pipe line, etc during the execution of work as per requirement |
| 216 | BOUNDRY WALL AROUND WATERWORKS CAMPUS, GATE, SITE DEVELOPMENT AND APPROACH ROAD ZONE-2 |
| 217 | Supply of all materials, labour T&P etc. for construction of boundary wall as per departmental type design at water works required for proper completion of work. |
| 218 | Supply and fixing of 3.60 m wide main gate &1.20 m wide wicket gate including construction of pillars as per departmental type design including supply of all materials, labour, T&P etc. required for proper completion of works. |
| 219 | Provide all meterial, labour, T&P etc. required for proper completion of work including leveling, dressing for development of water works site. |
| 220 | Filling of carted earth in water works campus. |
| 221 | Supply of all materials, labour T&P etc. andconstruct Interlocking road in water works |
| 222 | Construction of 300x300 mm size drain |
| 223 | Construction of Artificial Recharging of Ground water hrough roof top rain water of pump house, bypass chamber’s water & overflow of O.H.T. supplying of all material, pipes, grates, etc. complete in all respect. |
| 224 | Supply of all materials, labour, T&P, complete and construction of Single Room Staff quarter for pump operator, chukidar, pump attendent and other / MCS Room as per departmental type design. (Zone 2) |
| 225 | Supply all materials, labours and t&p etc and construction of R.C.C. over head tank of 1000 KL capacity and 20 m staging with main components, excluding cost of soil testing. (Zone-3) |
| 226 | Construction of Pump House- Cum- Chloronome of size 3.60 x 3.0 M x 3.0 &1.80 x 1.20 x 3.0 M including supply of all materials, labour, T&P etc. required for proper completion of work as per departmental type design. (Zone 3) |
| 227 | RISING MAIN ZONE-3 |
| 228 | Supply of ISI marked S&S Centrifugally Cast (Spun) Ductile Iron pipes as per IS: 8329-2000 suitable for Push on jointing by compatible rubber gasket confirming to IS : 9523 : 1980 at divisional store including all taxes |
| 229 | 200 mm dia |
| 230 | Earthwork in excavation in pipe line with lift upto 1.5 m. and lead upto 50m. Including filling back, watering, ramming of excavated earth into trenches and disposal of sur plus earth within 50 metre with display of flags, caution boards, fencing, lighting, watching etc complete. |
| 231 | In ordinary soil |
| 232 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 233 | 200 mm Dia |
| 234 | Supply of following size screwed down type C.I. single ball air valves. |
| 235 | 50 mm dia |
| 236 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 237 | 50 mm dia. |
| 238 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 239 | Provision of construction of RCC thrust block of grade M-20 for water hammer at bends of pipe. |
| 240 | Supply of reinforcement including cutting bending etc complete for surface reinforcement. |
| 241 | Provision for crossing of nala, road, culvert excluding supply of C.I. tyton pipe/MS pipe and specials, but including their laying, jointing etc. complete. |
| 242 | More than 1.0M (Avrage rate more than 1 meter) |
| 243 | Less Than 1.0M (Avrage rate more than 1 meter) |
| 244 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 245 | Interlocking Road |
| 246 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distanceof 50m. As per PWD specifications |
| 247 | Interlocking Road |
| 248 | DISTRIBUTION ZONE-3 |
| 249 | Supply of following sizes HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications includingF.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer -in - charge. |
| 250 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 251 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 252 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 253 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 254 | Supply of following sizes (D.I.) pipes for rising main/distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest/relevant I.S. specifications suitable forD.I pipes as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches. All complete as per instructions of Engineer -in - charge. |
| 255 | 200 mm dia DI Pipe K-7 |
| 256 | 250 mm dia DI Pipe K-7 |
| 257 | 300 mm dia DI Pipe K-7 |
| 258 | 400 mm dia DI Pipe K-7 |
| 259 | Supplying the following dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 260 | Sluice valve |
| 261 | 80 mm dia |
| 262 | 100 mm dia |
| 263 | 150 mm dia |
| 264 | 200 mm dia |
| 265 | 250 mm dia |
| 266 | 300 mm dia |
| 267 | Scoure valve |
| 268 | 80 mm dia |
| 269 | Supply of single / double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 270 | 50 mm |
| 271 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S. specifications including all taxes and insurance up to site of work (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer ‐in ‐ charge. |
| 272 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. |
| 273 | In ordinary soil |
| 274 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of HDPE pipes, specials coupling, fittings etc.to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines (excluding trenching), but including cutting of pipes for making joints. |
| 275 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 276 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 277 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 278 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 279 | Carting from store (upto 8Km. or within municipal limit which is more) following sizes of D.I. pipes, specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 280 | 200mm dia |
| 281 | 250mm dia |
| 282 | 300mm dia |
| 283 | 400mm dia |
| 284 | Carting of sluice valves / scour valve from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes to site of work, lowering in already prepared trenches and fixing them in position ,making flange joints including supply of all materials such as bolts, nuts, rubber insertion, white lead, testing etc . complete. |
| 285 | Sluice valve |
| 286 | 80 mm dia |
| 287 | 100 mm dia |
| 288 | 150 mm dia |
| 289 | 200 mm dia |
| 290 | 250 mm dia |
| 291 | 300 mm dia |
| 292 | Scour Valve |
| 293 | 80 mm dia |
| 294 | Carting from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes screwed down air valve to site of work, fixing in position including boring and threading in the main etc.complete including cost of boring the water main and subsequent back filling but excluding cost of air valve. |
| 295 | 50 mm |
| 296 | Carting from store to site of works(upto 8Km. or within municipal limit which is more) of 80mm dia size flanged fire hydrant to site of work, fixing them in position for flanged joints . |
| 297 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 298 | Surface box type including supply and fixing of 150mm x 150 mm size surface box. (upto 125 mm dia valve) |
| 299 | Masonry type with RCC cover (more than 150 mm dia valve) |
| 300 | Supply of all materials, labour T&P etc. and construction of air valve chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 301 | Supply of all materials, labour, T&P etc. and construction of fire hydrant chamber complete required for proper completion of the work as per type design (with RCC cover) |
| 302 | Design and construct Thrust Block made inR.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 303 | Providing reinforcement of Thrust block for reinforced concrete work including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with wire at every inter-section, complete as per drawing and direction. |
| 304 | Making Nala crossing falling on alignment of pipe line including cost of D.I. pipe one no. (5.50m length) including supply of all materials, labour, T&P, etc complete required for proper completion of work. |
| 305 | width 0.3 m to 0.5 m |
| 306 | width 0.5 m to 1.0 m |
| 307 | width 1.0 m to 1.5 m |
| 308 | width 1.5 m to 3.0 m |
| 309 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 310 | Bituminous Road as per NP specs |
| 311 | Brick Road (BOE) |
| 312 | CC Road |
| 313 | Inter locking tile Road |
| 314 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 315 | Bituminous Road as per NP specs |
| 316 | Brick Road (BOE) |
| 317 | CC Road |
| 318 | Inter locking tile Road |
| 319 | Trenchless Crossing :- Survey site Investigation Planning design Drawings as per State Road manual and vetting / checked from State Road Divisional Office and taking NOC for trenchless crossing of National highway road and Railway track(crossing length 15m to 25m ) Road for of required dia Rising main pipe with casing pipe as required for proper completion of work required size of MS casing pipe as per drawing and as per (IS:3589 & made from confining to IS:2062) with 750 Micron PU coating internally and 250 micron anti corrosive bituminous paint externally by trenchless technology method at an average depth 3.60 mtr from normal ground level up to top of casing pipe including excavation & filling of Pit Dewatering arrangement Supporting system for soil also including supply and fixing of 2 no Sluice valve ISI Mark construction of sluice valve chamber etc. all complete work including supply & fixing specials in carrier pipe over main pipe as per specification given in the bid documents including supply of all materials labour T&P etc. for proper completion of work as per instruction |
| 320 | Major road crossing (Upto Dia 350 mm) by HDD Method |
| 321 | Shifting (Payment made to other department) of existing services like electric pole, telephone pole, gas pipe line, etc during the execution of work as per requirement |
| 322 | BOUNDRY WALL AROUND WATERWORKS CAMPUS, GATE, SITE DEVELOPMENT AND APPROACH ROAD- ZONE-3 |
| 323 | Supply of all materials, labour T&P etc. for construction of boundary wall as per departmental type design at water works required for proper completion of work. |
| 324 | Supply and fixing of 3.60 m wide main gate &1.20 m wide wicket gate including construction of pillars as per departmental type design including supply of all materials, labour, T&P etc. required for proper completion of works. |
| 325 | Provide all meterial, labour, T&P etc. required for proper completion of work including leveling, dressing for development of water works site. |
| 326 | Filling of carted earth in water works campus. |
| 327 | Supply of all materials, labour T&P etc. andconstruct Interlocking road in water works |
| 328 | Construction of 300x300 mm size drain |
| 329 | Construction of Artificial Recharging of Ground water hrough roof top rain water of pump house, bypass chamber’s water & overflow of O.H.T. supplying of all material, pipes, grates, etc. complete in all respect. |
| 330 | Supply of all meterials, labour, T&P, complete and construction of Single Room Staff quarter for pump operator, chukidar, pump attendent and other as per departmental type design. (Zone 3) |
| 331 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house with supply of 1 m above GL G.I. pipe (15 mm) (above ground) & average 05 mtr. HDPE Pipe (20 mm) including specials saddle Tapetc. of suitable size T&P etc. including excavation laying and jointing for proper completion of work as per instructions of Engineer |
| 332 | Shifting of house connection from exisitng pipe line to newly laid pipe line should be done on existing connection inside the boundary wall with new material provided with supply of 1 m above GL G.I. pipe (15 mm) (above ground) & average 05 mtr. HDPE Pipe (20 mm) including specials saddle Tapetc. of suitable size T&P etc. including excavation laying and jointing for proper completion of work as per instructions of Engineer. |
| 333 | E/M |
| 334 | Zone-1 |
| 335 | RIG MACHINE Transportation of rig machine including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 336 | AIR COMPRESSOR Transportation of 400 psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 337 | O.P. UNIT Transportation of 0.5 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 338 | Drilling of BORE |
| 339 | Logging of Bore |
| 340 | Drilling of 500mm dia bore from G.L. to 65m BGL. |
| 341 | Drilling of 450mm dia bore from 66m BGL to 100m BGL. |
| 342 | Drilling of 450mm dia bore from 101m BGL to 200m BGL. |
| 343 | Drilling of 450mm dia bore from 201m BGL to 300m BGL. |
| 344 | LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL- Lowering of 200mm X 150mm tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 270m BGL. |
| 345 | Lowering of 200mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL. |
| 346 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 61m BGL to 100m BGL. |
| 347 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 200m BGL. |
| 348 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 201m BGL to 270m BGL. |
| 349 | TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) |
| 350 | 200mm dia size MSERW housing pipe 7.1mm thick including with 1 no 200 X 150mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick , M.S. ring ,100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 351 | 150mm dia MSERW 7.1mm thick plain /slotted pipe including with M.S ring 100X12mm thick , 1 no M.S. bail plug , center guide etc comp in all respect. |
| 352 | PEA-GRAVEL (As per IS 4097) |
| 353 | 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stacking at site. |
| 354 | Development of tube well by 400 PSI air compressor |
| 355 | Development of tube well by 400 PSI air compressor |
| 356 | Development of tube well by 1 cusec O.P. Unit |
| 357 | Development of tube well by 1 cusec O.P. Unit. |
| 358 | Welding of Tube well cover by Electric welding. |
| 359 | TEST |
| 360 | Chemical and bacteriological test. |
| 361 | PUMP SET: |
| 362 | SITC of 600 LPM, 56m head 1450rpm, 15H.P. Submercible pump set , soft starter with 24 meter coloumn pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0m long 1no), Earthing, Painting, Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates. |
| 363 | SCADA Compatible Chlorination system. |
| 364 | SITC of 25 KVA voltage stabilizer . |
| 365 | Three Month Trial & Run Cost ZONE 1 |
| 366 | Arsenic / Fluoride Removal Plant - Supply, Installation, Commissioning and 1 Yrs O&M of NANO Technology based Treatment Unit of desired capacity for treatment of existing TubeWell water to desirable quality as per BIS: 10500, and carrying the treated water to existing OHSR for distribution of potable water to households through the distribution network water supply schemes in District Ballia. |
| 367 | Supply and Installation of Treatment Unit of 600 LPM capacity for treatment of Iron/Arsenic and Nano Fluoride Removal Plant. |
| 368 | Supply and Installation of Treatment Unit of 600 LPM capacity for treatment ofFlouride and Nano Fluoride Removal Plant. |
| 369 | Zone - 2 |
| 370 | RIG MACHINETransportation of rig machine including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 371 | AIR COMPRESSOR Transportation of 400 psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 372 | O.P. UNITTransportation of 1 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 373 | Drilling of BORE |
| 374 | Logging of Bore |
| 375 | Drilling of 600mm dia bore from G.L. to 65m BGL. |
| 376 | Drilling of 450mm dia bore from 66m BGL to 100m BGL. |
| 377 | Drilling of 450mm dia bore from 101m BGL to 200m BGL. |
| 378 | Drilling of 450mm dia bore from 201m BGL to 300m BGL. |
| 379 | LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL-Lowering of 300mm X 150mm tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 270m BGL. |
| 380 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL. |
| 381 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 61m BGL to 100m BGL. |
| 382 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 200m BGL. |
| 383 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 201m BGL to 270m BGL. |
| 384 | TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) |
| 385 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 150mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick , M.S. ring ,100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 386 | 150mm dia MSERW 7.1mm thick plain /slotted pipe including with M.S ring 100X12mm thick , 1 no M.S. bail plug , center guide etc comp in all respect. |
| 387 | PEA-GRAVEL (As per IS 4097) |
| 388 | 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stacking at site. |
| 389 | Development of tube well by 400 PSI air compressor |
| 390 | Development of tube well by 400 PSI air compressor. |
| 391 | Development of tube well by 1 cusec O.P. Unit |
| 392 | Development of tube well by 1 cusec O.P. Unit. |
| 393 | Welding of Tube well cover by Electric welding. |
| 394 | TEST |
| 395 | Chemical and bacteriological test. |
| 396 | PUMP SET: |
| 397 | SITC of 1200 LPM, 36m head 1450rpm, 17.50H.P. Submercible pump set,soft starter with 24 meter coloumn pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0m long 1no), Earthing, Painting, Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates. |
| 398 | SCADA Compatible Chlorination system |
| 399 | SITC of 30 KVA voltage stabilizer . |
| 400 | Three Month Trial & Run Cost ZONE-2 |
| 401 | Arsenic / Fluoride Removal Plant Supply, Installation, Commissioning and 1 Yrs O&M of NANO Technology based Treatment Unit of desired capacity for treatment of existing TubeWell water to desirable quality as per BIS: 10500, and carrying the treated water to existing OHSR for distribution of potable water to households through the distribution network water supply schemes in District Ballia. |
| 402 | Supply and Installation of Treatment Unit of 1200 LPM capacity for treatment of Iron/Arsenic and Nano Fluoride Removal Plant |
| 403 | Supply and Installation of Treatment Unit of 1200 LPM capacity for treatment of Flourideand Nano Fluoride Removal Plant. |
| 404 | Zone -3 |
| 405 | RIG MACHINETransportation of rig machine including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 406 | AIR COMPRESSORTransportation of 400 psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 407 | O.P. UNIT Transportation of 1 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 408 | Drilling of BORE |
| 409 | Logging of Bore. |
| 410 | Drilling of 600mm dia bore from G.L. to 65m BGL. |
| 411 | Drilling of 450mm dia bore from 66m BGL to 100m BGL. |
| 412 | Drilling of 450mm dia bore from 101m BGL to 200m BGL. |
| 413 | Drilling of 450mm dia bore from 201m BGL to 300m BGL. |
| 414 | LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL-Lowering of 300mm X 150mm tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 270m BGL. |
| 415 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL. |
| 416 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 61m BGL to 100m BGL. |
| 417 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 200m BGL. |
| 418 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 201m BGL to 270m BGL. |
| 419 | TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) |
| 420 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 150mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick , M.S. ring ,100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 421 | 150mm dia MSERW 7.1mm thick plain /slotted pipe including with M.S ring 100X12mm thick , 1 no M.S. bail plug , center guide etc comp in all respect. |
| 422 | PEA-GRAVEL (As per IS 4097) |
| 423 | 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stacking at site. |
| 424 | Development of tube well by 400 PSI air compressor |
| 425 | Development of tube well by 400 PSI air compressor |
| 426 | Development of tube well by 1 cusec O.P. Unit |
| 427 | Development of tube well by 1 cusec O.P. Unit. |
| 428 | Welding of Tube well cover by Electric welding. |
| 429 | TEST |
| 430 | Chemical and bacteriological test. |
| 431 | PUMP SET: |
| 432 | SITC of 1200 LPM, 36m head 1450rpm, 17.50H.P. Submercible pump set ,soft starter with 24 meter coloumn pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0m long 1no), Earthing, Painting, Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates. |
| 433 | SCADA Compatible Chlorination system. |
| 434 | SITC of 30 KVA voltage stabilizer . |
| 435 | Three Month Trial & Run Cost ZONE-2 |
| 436 | Arsenic / Fluoride Removal Plant Supply, Installation, Commissioning and 1 Yrs O&M of NANO Technology based Treatment Unit of desired capacity for treatment of existing TubeWell water to desirable quality as per BIS: 10500, and carrying the treated water to existing OHSR for distribution of potable water to households through the distribution network water supply schemes in District Ballia. |
| 437 | Supply and Installation of Treatment Unit of 1200 LPM capacity for treatment of Iron/Arsenic and Nano Fluoride Removal Plant. |
| 438 | Supply and Installation of Treatment Unit of 1200 LPM capacity for treatment of Flourideand Nano Fluoride Removal Plant. |
| 439 | PUMPING PLANTS (Zone-2) CWR |
| 440 | VT Pumping Plant :- Supply of 2300 LPM, 40 mtr Head, 1450 RPM, S.S impeller & shaft Water Lubricated VT Pump set coupled with squirrel cage VHS TEFC 40 HP induction motor (Operating Voltage 415 V + 10%, 3 ph, 50 cycle) with Bowl Assembly Discharge Head, Head Shaft, Strainer and 4.5 mts Column Assembly to feed OHT (2w+1s) |
| 441 | MOTOR CONTROL PANNEL :- Supply of M.S. Fabricated Dust and Vermin Proof, Cubical Type, Floor Mounted Control Panel with suitable size capacitor bank compatible to SCADA with RS485 Port consisting as following :-INCOMING :- 1 No. M.C.C.B. motorizes & microprocessor based 200 Amp capacity.OUTGOING :- (i) 3 Nos. Outgoing Consist of SCADA Compatible Motorized M.C.C.B. microprocessor based 80 Amp Capacity, suitable to operate 40 HP induction motor with Soft starter with RS 485 Port- 400 V Class, 30 KW, Rating.(ii) 1 No. MCCB 63 Amp for Actuator(iii) 1 No. MCCB 32 Amp for lighting and fan |
| 442 | Auto Phase reversal unit / Automatic switch with inbuilt the delay & enclosure (Confirms to IEC: 60947-1 & IEC: 60947-6-1) of following rating: 200 Amp Rating |
| 443 | MAIN PIPING AND VALVES :- |
| 444 | 200 mm dia Sluice Valve with Actuator (for Pump) |
| 445 | 200 mm dia DI Reflux Valve (for Pump) |
| 446 | 250 X 200 X 250 mm size C.I.,A/F Tee |
| 447 | 200 mm M.S. D/F pipe 1 mt. long |
| 448 | 250 mm M.S. D/F pipe 2 mt. long |
| 449 | 250 mm M.S. D/F pipe 1.5 mt long |
| 450 | 250 mm dia C.I.D/F. Bend- 90 degree |
| 451 | 250 mm size M.S. blind flange |
| 452 | 250 mm size Sluice Valve with Actuator (for Common Header) |
| 453 | Reflux Valve 250 mm Size (for Common Header) |
| 454 | 250 x 250 x 250 mm CI Tee |
| 455 | 250 mm dia Sluice Valve with Actuator (for Bye pass) |
| 456 | 250 mm M.S. D/F pipe 1 mt. long (for Bye pass) |
| 457 | Nut bolt and rubber packing for jointing as per requirement. |
| 458 | Other material such as dismantling joints, reducer in larger as required at the time of installation. |
| 459 | CE/UL Certified Electromagnetic Flowmeters 250mm Size . |
| 460 | Power Wiring Supply of 16 Sqmm. 3 core copper conductor cable from Starter to Motor. |
| 461 | Installation, Testing, Commissioning of VT Pumps including required material for Proper installation. |
| 462 | Power Wiring Complete in all respect in CWR |
| 463 | Double Plate Earthing of complete pumping station (as per IER/IS) including civil works and all material, separate double earthing for each equipment shall be carried out. |
| 464 | Laying of cable tray for power cable complete in all respect. |
| 465 | 3 Ton. EOT, Gantry I-section Girder, square rod with travelling trolley. |
| 466 | CE/UL Certified Pressure transmitter for each pump. |
| 467 | CE/UL Certified Surge protector for control panel. |
| 468 | Rubber mat for Electrical purpose as per IS 5424. 1 Mtr. X 2 Mtr. (12.5 mm thick). |
| 469 | CO2 type Fire extinguisher ISI mark confirming to IS 15683- 4.5 Kg. |
| 470 | Internal & External electrification of Pumping plant. |
| 471 | Tools & Sppanners Complete. |
| 472 | SCADA compatible Automatic Chlorinating system of suitable capacity |
| 473 | Installation, commissioning & testing of Automation related equipments for ZPS . |
| 474 | Trial run for 3 month period for one ZPS. |
| 475 | Water works Campus with Solar Panel LED light 35 W . |
| 476 | 3 Phase AC automatic voltage stabilizer for 120 KVA . |
| 477 | Supplying, installation, testing & commissioning of indoor type floor mounted metal clad, 11 KV VCB panel with 1No. 630 Amp. incoming VCB & 2 Nos 630 Amp. outgoing VCB totally enclosed & fully interlocked, horizontal drawout, horizontal/ vertical isolation type breaker as per IS with all necessory protection and also should be compatible to SCADA operation . |
| 478 | Supply of 70 Sq.mm size XLPE cable from 11 K.V.UPPCL metering panel to H.T. incoming Panel, and H.T. panel to Transformer. |
| 479 | Supplying, installation, testing and commissioning of 160 KVA, 11/0.44 KV, 3 Phase, 50 Hz, Dyn 11, indoor ONAN type, copper wound transformer with OFF load tap changing arrangement on HV side in steps of +7.5% & -15%, LV side @ 2.5% stapping complete with all accessories i/c first filling of filtered dehydrated oil and confirming to IS 1180-2014 (Part 1 to Part 5) & as per specification complete in all respects as required at site. |
| 480 | Supply of H.T. Cable end termination joint kit. |
| 481 | Complete in all respect. Earthing system shall executed as per IS : 3043 and I.E. rules. |
| 482 | Supply of 1.1 KV grade 95 sq mm 3.5 core PVC insulated Armored Aluminum cable from Transformer to L.T. Panel. |
| 483 | Heavy Duty leak proof fire bucket as per IS 2546/1974 |
| 484 | Fire bucket stand for 6 bucket |
| 485 | CO2 type Fire extinguisher ISI mark confirming to IS 15683- 4.5 Kg. |
| 486 | Rubber mat for Electrical purpose as per IS 5424. 1 Mtr. X 2 Mtr. (12.5 mm thick). |
| 487 | Light wiring of HT Room, LT Room, Metering Room & Transformer Area. Wiring of light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq. mm FR PVC insulated unsheathed flexible copper conductor 1.1 kV grade and 1.5 sq.mm FR PVC insulated unsheathed flexible copper earth conductor 1.1 kV grade (IS:694) of approved make in surface / recessed ISI marked medium duty PVC conduit & it\"s accessories, round tiles,18 SWG M.S. box with earth terminal, screwless cage connectors for neutral looping in switch board & false ceiling point. 6 A switch, 3.0 mm thick phenolic laminated sheet, zinc plated / brass screws, cup washers, making connections, testing etc. as required. |
| 488 | Wiring point for HPMV/sodium vapor lamp/ power plug with 2.5 sq mm PVC insulated multi core cable in heavy gauge rigid PVC conduit concealed in wall complete with 1/18 copper wire. Earth continuity wire with 16 Amp. metal clad SPN switch/ 15 Amp. piano type switches complete in all respect. |
| 489 | Provision for supply & fixing of main suitable distribution boards with MCBs for controlling the lighting system. |
| 490 | Supply and fixing of factory wired industrial fluorescent tube fitting with reflector fabricated from CRCA sheet and finished with powder coating / vitreous enamelled complete with accessories complete including tube etc. on wall. |
| 491 | Supply and fixing of HPSV/MV 125 watt fixture with lamp and its all accessories. |
| 492 | Water works Campus with Solar Panel LED light. |
| 493 | Three Month Trial & Run Cost CWR |
| 494 | NOC for substation from safety department |
| 495 | SCADA Zone-1 ,2 & 3 |
| 496 | CE & UL approved manufacturer’s RTU/ PLC in IP 65 encloser suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified, one for each tubewell to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations |
| 497 | G.S.M./G.P.R.S. based wireless communication with 4G Modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant. |
| 498 | CE / UL certified Intelligent smart energy meter |
| 499 | Motor Operated Actuator with Sluice Valve (100mm/80mm) |
| 500 | CE / UL certified Electromagnetic flowmeter of size:100mm/80mm |
| 501 | Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (100 Amps) |
| 502 | CE / UL certified Hydrostatatic type sub soil water level transmitter for Tubewell. |
| 503 | CE / UL certified Pressure Transmitter |
| 504 | CE / UL certified Surge protector for control panel |
| 505 | CE / UL certified 7\" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters |
| 506 | Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT |
| 507 | Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. |
| 508 | Installation, commissioning & testing |
| 509 | Test and trial run for 3 Months period |
| 510 | SCADA for CWR |
| 511 | CE & UL Certified PLC/RTU with redudant CPU & Power supply in IP 54 enclosure sutable to Communicate with GSM based modem unit with redudant CPU & Power Supply with annalog & digital Parameter & features as specified for each ZPS/OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer sata at muliple stations as specified in tender technical specification. |
| 512 | G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/PLC capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification. |
| 513 | CE/UL Certified Intelligent Smart Energy Meter. |
| 514 | Cable -Complete cabling for ZPS including all power & control cable of all equipments at ZPS and OHT (Upto 3 Pumps) |
| 515 | Security Survelliance IP Camera (optional) |
| 516 | SCADA for OHT-Zone 1 |
| 517 | CE & UL certified Radar type level tranmitter for OHT |
| 518 | Motor Operated Actuator with Sluice Valve (250 mm )-DMA 1 |
| 519 | CE / UL certified lectromagnetic flowmeter of size:250mm-DMA-1 |
| 520 | Dismantelling joint 250 mm-DMA-1 |
| 521 | Motor Operated Actuator with Sluice Valve (250 mm )-DMA 2 |
| 522 | CE / UL certified Eectromagnetic flowmeter of size:250mm-DMA-2 |
| 523 | Dismantelling joint 250 mm-DMA-2 |
| 524 | SCADA for OHT Zone 2 |
| 525 | CE & UL certified Radar type level tranmitter for OHT |
| 526 | Motor Operated Actuator with Sluice Valve (350 mm )-DMA 1 |
| 527 | CE / UL certified lectromagnetic flowmeter of size:350mm-DMA-1 |
| 528 | Dismantelling joint 350 mm-DMA-1 |
| 529 | Motor Operated Actuator with Sluice Valve (450 mm )-DMA 2 |
| 530 | CE / UL certified Eectromagnetic flowmeter of size:450mm-DMA-2 |
| 531 | Dismantelling joint 450 mm-DMA-2 |
| 532 | Motor Operated Actuator with Sluice Valve (350 mm )-DMA 3 |
| 533 | CE / UL certified Eectromagnetic flowmeter of size:350mm-DMA-3 |
| 534 | Dismantelling joint 350 mm-DMA-3 |
| 535 | SCADA for OHT Zone 3 |
| 536 | CE & UL certified Radar type level tranmitter for OHT |
| 537 | Motor Operated Actuator with Sluice Valve (400 mm )-DMA 1 |
| 538 | CE / UL certified lectromagnetic flowmeter of size:400mm-DMA-1 |
| 539 | Dismantelling joint 400 mm-DMA-1 |
| 540 | Motor Operated Actuator with Sluice Valve (250 mm )-DMA 2 |
| 541 | CE / UL certified Eectromagnetic flowmeter of size:250mm-DMA-2 |
| 542 | Dismantelling joint 250 mm-DMA-2 |
| 543 | Motor Operated Actuator with Sluice Valve (300 mm )-DMA 3 |
| 544 | CE / UL certified Eectromagnetic flowmeter of size:300mm-DMA-3 |
| 545 | Dismantelling joint 300 mm-DMA-3 |
| 546 | Master Control Station (MCS) |
| 547 | CE & BIS approved manufacturer\"s industrial grade LCD monitor with latest configuration as per specification of size 65\" |
| 548 | Desktop/PC with i7 processor for as per spec mentioned in technical bid documents. |
| 549 | CE/UL approved manufacturer\"s 3 KVA UPS with batteries as spec. mentioned for STP and Computer as per requirement |
| 550 | Full development version of required TAGS SCADA Software with costomization of software for MCS as per required as per spec mentioned in technical bid documents. |
| 551 | CE & UL approved manufacturer\"s control room PLC with CPU & power supply at MCS in IP65 enclosure as per spec. mentioned |
| 552 | CE/UL certified field gateway agent for transfering data from MCS to control room |
| 553 | GSM based wireless / broadband/Equipment communication system for PLC capable to transfer and gather data from remote sites to control stations, including all accessories complete |
| 554 | CE/UL approved manufacturer\"s Firewall for network protection |
| 555 | Lightning surge protector for ethernet communication protection |
| 556 | CE/UL approved manufacturer\"s industrial grade ethernet switch |
| 557 | Mobile App facility system architecture complete. |
| 558 | Supply and Installation 1.5 Ton AC (O General/ Similar)with stabilizer and other required item for installation |
| 559 | Canon/HP 1018/equivalent Laser printer with chair and table. |
| 560 | Security Survelliance IP camera |
| 561 | Installation, testing and commissioning with required furniture,Air Conditioner etc |
| 562 | Test and trial run |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail