Tender For Rejuvenation Of Water Bodies And Green Space Work Near Dholi Satti With 5 Years O And M Fatehpur Shekhawati. - 1 RUIDP Tecknology - Design, supply, erection, installation, jointing, testing, trial run, and commissioning of prefabricated micro Sewage Treatment Plants based on RUIDP Technology for Inlet parameter (Ph-6.5-7.5; BOD5 @ 20 degree C-300 mg/l; COD-650 mg/l; TSS- 600 mg/l; TKN-55 mg/l) and outlet parameter (Ph-6.5- 9.0; BOD5 @ 20 degree C < 10 mg/l; COD-<= 50 mg/l; TSS- <=20 mg/l; N-Total-<=10 mg/l & Faecal Colliform-<100 MPN/100 ml)complete in all respects. STP will have following components:-A) Pretreatment Unit:- Design, Supply, Fabrication of Coarse Screen with Grit Separator Unit. The fine screen (2 Nos.; 1 W+1S) installed in sequence shall be made in SS316L using flat bars of 3 mm thick, 50 mm wide and spacing of 5 mm, tear shape and dimensions of the bar screen as per design approved by engineer. The grit and oil filter separation unit shall be also provided in SS 316 L with interconnecting pipeline made in 90 mm HDPE PE-100 PN-6 as per IS 14333 (amended up to date), necessary fittings while maintaining the hydraulic levels with capacity of removing grease, oil and grit particles having specific gravity 2.85 with removal efficiency of 80%. Prefabricated sump with non clog sewage submersible pump set 1 W +1S of 2% Ni CI Cascading, Impeller CF 8M ,Shaft SS 410,mechanical seal with 10M Power & Control cable , 5M Galvanized Chain,,10M, 50mm MS galvanized Guide pipe, Duck Foot Bend, with Guide wire SS 304 etc. installed after the oil and grease chamber. Adequate arrangements shall be made foraccess to remove the screened waste and settled grit on manual basis.B) Primary Settling Tank Unit:- Design, Supply, 2 Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 Earthwork (1.5- 3m) earthen walk way side wall, Earthwork (1.5-3m)Pond Side wall 3 Earthwork (3.0-4.5m) 4 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) M15 PCC below foundation of Wall inner side along wet land 5 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishingand reinforcement: M-30 Grade ConcreteM30 Concrete Cantelever Slab 6 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.Reinforcement 7 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.Wall inner side 8 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.Wall inner side 9 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparation of surface, etc. complete. Epoxy Panit 10 Aggregates 25 mm to 10 mm 11 Aggregates 45 mm to 2.8 mm 12 Boulder with minimum size of 300 mm for Pitching at Site 13 A.P.P. modified polymeric felt (two layers) 2 mm thick 14 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Partion Wall 15 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishingand reinforcement: M-30 Grade Concrete Partion Wall, Raft ofPartion Wall 16 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. 17 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.Partion Wall, Raft ofPartion Wall 18 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparation of surface, etc. complete.Epoxy Panit 19 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 20 Supply and planting following species best quality containergrownhealthytreesof2mt.min.height, well established & free from disease at site in 0.90 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the holewateringetcasrequired.Neem(Azadirachta indica) 21 Gulmohar(Delonix regia) 22 Supplyandplantingfollowinginpolybags/earthen pots well branched, well established & free from disease of 900 mm min. height plants at site in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the holewateringetcasrequired.Clerodendroninermii( Choti Aari) 23 Fine dressing the ground. 24 Grass (Doob) GrassingwithDoobsgrassincludingwateringand maintenance ofthe lawnfor30daysormoretillthe grassformsathicklawnfreefromweedsandfitfor movingincludingsupplyinggoodearthifneeded.In rows 15 cm apart in either direction 25 Clearingandgrubbingroadlandincludinguprooting rankvegetation,grass,bushes,shrubs,saplingsand trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by Engineer.In area of light jungle 26 Providing and fixing 50 mm dia G.I. steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including all material, labour. 27 Supplying and fixing of GI chain link fencing of required width in mesh including strengthening with 2 mmdiaGIwire/G.I.staples/G.I.Unails/nutsbolts with 2.4 m angle iron posts50 mm x 50mm x6 mm placedevery3metrescentertocenterfoundedin M15gradecementconcrete30cmx30cmx60cm,0.6 metrebelowgroundlevel,every15thpost,lastbut one end post and corner post shall be strutted on both sidesandendpostononesideonlyetccomplete as required and as per direction of Engineerincharge. Mesh size 50mm x 50mm made of GI wire 3.15mm dia 28 ProvidingandfixingprecastcementconcreteM20 grade(UsingmechanicalConcreteMixer)kerbstone topandbottomwidth115and 165mmrespectively,250 mm high on 150 mm thick PCCM10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 29 Supply,fabricating&fixingofanodised(20 to25 micron)Aluminum ladderof450mm wide with2 nos rectangularsectionof65x35mm(3mmthick)as verticalpostand25mmbarsstepsat300mmc/c complete in all respect as per the specification and the direction of the Engineer. 30 Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Unarmoured / Armoured aluminium cable of 1.1 KV grade as per PWD specification for electricalWorksinexistingRCC/Hume/ Stoneware/PVCpipe/openduct/cabletrench with filling of excavated earth in trench , on existingcabletraysoronsurfaceetc.including making necessary connection, testing etc. as requiredofsizeandasperpoints(a),(b),(c), mentioned below: (a) Material : H4 Grade aluminium conductor of purity >99.6 % & as per IS:1554 PI / IS :7098 P – I (b)conductorshallhaveelectrolyticaluminium confirming to IS 8130, IS 39751999 for armouring ofcablesinarmouredcableitems,IS5831for sheath, IS 10810 (Part 0 to 64 ) for testing procedures.(c) OEM Must have ISO9001&14001 certificationsforquality ssuarance&itsownin houseNABLlabsetupforalltestingfacilitiesfor cables.Appropriatetypetestcertificate/OEM testreportshallbesubmitted.Allaboveasper pre approved by Engineer in charge. For additional technicalparametersofproducts/work,refer AnnexureAattachedwiththisBSR.Armoured 31 Supply,Fabricating&installingfollowingsizesof powdercoatedperforatedM.S.cabletrayswith perforationnotmorethen17.5%inconvenient sectionincludinghorizontalandverticalbends, reducerstees,crossmembersandother accessories as required and duly suspended from theceilingwithMSsuspendersincludingbolts& nuts , fastners, supports, painting suspenders etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure A attached with this BSR .150mm x 50mm x 1.6mm 32 Supply and erection of M.S. Galvanized Octagonal pole(asperBSEN4033:2003/BSEN10025/IS 2062 IS:875 Part1–2015/ forMSplateforbase flange)offollowinglengthanddimensionasper table P01 with base plate on the cement concrete foundation of M20 grade (1:1.5:3) as per IS 456/IS 2911. withthehelpofanchorboltsofgrade6.8 (IS: 1367 P III ). The pole shall have a weatherproof flush door and locking arrangements. complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure A attached with this BSR . OctagonalMS Poles made ofS355JO gradesteel sheet,foldedlengthwisetoobtainedOctagonal shape,havingsinglelongitudinalseamweldand hotdippedgalvanisedinternally&externallyin accordancewithIS2629.(SeeTableP01for specs.) 3.0 Mtr. 33 Supply Fixing and Installation of Solar Power Plant andinculdingallelectricalandmechnicalwork with commissioning 34 Operation and maintenance of plant and anciliary units which will includeallactivitiesdescribedinthe scopeof work complete During 1st Year 35 During 2nd Year 36 During 3rd Year 37 During 4th Year 38 During 5th Year