Supply, Installation And Commissioning Work Of Complete Restoration Of Auto Control System, Alarm System And Interlock Protection Of Emulsifier System For Gt, St, Uat And Mot Rooms For Unit No. I,Ii,Iii And Iv At Sgtps, Mppgcl, Birsinghpur. , Supply Part , Intelligent Emulsifier Of Microprocessor Based Control Panel (Control Panel Should Be Ul/Fm Approved With Required Ul/Fm Listed Fibber Modules As Per Site Conditions.) Control Panel Should Be Bs En 54 Standard Display Should Be Touch Screen Control Panel Should Have Feature To Alarm Acknowledgement Function. Panel Should Have Seamless Integration With Dynamic Connectivity Features Of Wireless Systems. , Graphic User Interface (Interface Should Be Ul/Fm Listed Graphic System- Dv Control Application With Required Hardware And Display) Graphic Software Supports Dual Screen (1 For Location Image And 2 For Listing Active Events) Software Will Show Full Map Navigation Using Configurable Buttons. , Mimic Panel (Mimic Panel Using Ul/Fm Listed Active Components, Sufficient Display Indicators, Required Smps, Power Back Up, Control Buttons For Dv Operation.) Cabinet Should Have Cooling Fan Automation, Emergency Lighting System, Tamper Notification Facility. Capable To Received Input From 2 Sources, Failure Of Primary Sources Auto Shift To Secondary Sources. , Pressure Vessel Size Should Be 1500 Mm * 600 Mm Diameter . Pressure Should Be 150 Psi, Floor Mounted Type. , Dv Control Panels (Dv Panels With On / Off Operation As Per Site Conditions. Including Mounting Arrangement On Ms Angle Grouting) Pressure Switch Should Be Weather Proof. Hydrant Switch Should Be Dual Contact Type. Made Up Of Ul94 V0 Grade Material With 190 Oc Melting Point. , Monitoring Device (Monitoring Device Should Be Analog Addressable Intelligent Monitoring Devices Ul/Fm Listed) Junction Box Made Of Ul94 Listed Abs V0 Grade Material With 190 Oc Melting Point. , Control Devices :- (Control Device Should Be Analog Addressable Intelligent Monitoring Devices Ul/Fm Listed) Junction Box Made Of Ul94 Listed Abs V0 Grade Material With 190 Oc Melting Point. , Triple Ir/Uv Explosion Proof Flame Detectors:- (Flame Detectors Should Be Explosion Proof And Ul/Fm Listed) Junction Box Made Of Ul94 Listed Abs V0 Grade Material With 190 Oc Melting Point. , Indoor Notification :- (Indoor Notification Should Be Addressable Intelligent Audio And Visual Notification Devices Ul/Fm Listed) Having Built Amplifier And Selectable Dual Message Alert. Sound Level Adjustment, Capable To Convert As Hooter Cum Strobe Or Speaker Cum Strobe. Device Shall Be Made Up Of Ul94 Certified V0 Grade With 190 Oc Melting Point. Junction Box Made Of Ul94 Listed Abs V0 Grade Material With 190 Oc Melting Point , Outdoor Notification :- (Outdoor Notification Should Be Weatherproof Addressable Intelligent Audio And Visual Notification Devices Ul/Fm Listed) Having Built Amplifier And Selectable Dual Message Alert. Sound Level Adjustment, Capable To Convert As Hooter Cum Strobe Or Speaker Cum Strobe. Device Shall Be Made Up Of Ul94 Certified V0 Grade With 190 Oc Melting Point. Junction Box Made Of Ul94 Listed Abs V0 Grade Material With 190 Oc Melting Point , Power Supplies :- (Power Supply 24V/4A Wall Mounted, Suitable For 230 V Ac Supply, Automatic Battery Charger, 24 Volts Lead Acid Batteries Sufficient For 24 Hours Normal Working & Capable Of Operating The System For 30 Minutes During An Emergency Condition) , Communication Cable-Copper :- (2 Core *1.5 Sq Mm Fire Survival Armoured Communication Cable With Glands And Accessories) , Communication Cable-Fiber :- (6 Core Armoured Fiber Communication Cable Including Required Media Converters, Pigtails, Patch Cord, Terminal Box Etc.) , Other Accessories Like : Hdpe Pipe, Pressure Gauges, Pressure Switches, Isolating Valves, Solenoid Valves, Media Converter, Cable Gland, Ferrules, Cable Ties And Other Required Accessories. , Work Part , Laying Of Above 6 Core Armored Fiber / 2 Core 1.5 Sq. Mm Fire Survival Armored Communication Cable With Underground Gi Pipe, Cable Tray Etc. Required As Per Site Condition. , Design, Installation, Commissioning & Testing Of Above Equipment And Trial Of Complete Emulsifier System.