| 1 | Auto-Transformers/Power Transformers /Auxillary Transformers:- A) Checking of Auto starting of fans, External cleaning of radiators,oil pumps OFAF/ONAF,Cleaning and checking of marshalling boxes of transformer/reactor and OLTC, (ii)Tightening of terminations, Checking of OLTC driving mechanism, Electrical checking/ testing of pressure relief device, Buchholz relay, OLTC surge relay/ checking of alarm/ tripand checking/ replacement of the gaskets of the terminal box, Checking / Tightning of earthing connections,Checking of earth resistance of Neutral, Replacement of Silca Gel of breathers and oil topping of transformers and tightning of bushing clamps on HV/IV/LV sides of 4X66.67mva, 4X40 mva, auto transformers and 20MVA to 50MVA power transformers including tandelta testing of bushing/ winding & DGA/ BDV/PPM testing of transformer oil.other tests on the transformer like ratio test, IR value/ Magnetic balance/ short circuit test etc. Checking of space heater and illumination |
| 2 | 66.67 MVA1 Ø, 220/132 KV |
| 3 | 40MVA1 Ø, 220/132 KV |
| 4 | 50 MVA 132/66 KV |
| 5 | 20 MVA 132/66 KV |
| 6 | 50 MVA 132/66 KV |
| 7 | 50MVA, 132/33KV |
| 8 | 20 MVA 132/33 KV |
| 9 | 1000 KVA, 66/11 KV |
| 10 | 500 KVA, 66/11 KV |
| 11 | 53.3 MVA SINGLE PHASE 220/66/11KV |
| 12 | 11/.415KV, 630 KVA AUXILLIARY TRANSFORMER |
| 13 | 250KVA,33/0.440KV |
| 14 | 250KVA,11/0.440KV |
| 15 | Draning/ De-sludging of transformer oil of transformers |
| 16 | Filling of oil, filitration and dehydration of transformer includinginstallation of vacume pump to be provided by the Department. |
| 17 | Reparing of cooloing fans of transformers including replacement of damaged winding, bearing,MCBs,Contactors, wiring of control circuitsetc. |
| 18 | Lifting of top lid of power transformer for complete physical inspection & replacement of gaskets. |
| 19 | Replacement of damaged core bolts/Earthning strip etc. |
| 20 | Testing of Transformer:- |
| 21 | Testing of Transformer:- tandelta testing of bushing/ winding &BDV testing of transformer oil.other tests on the transformer like ratio test, IR value/ Magnetic balance/ short circuit test etc, kits for testing shall be provided by the department. |
| 22 | DGA and PPM of Transformer from accredted laboratories. |
| 23 | Replacement of damaged/outlived bushing having high tan delta including crane/ mechanical equipment if required. |
| 24 | 220 KV Bushing |
| 25 | 132 KV Bushing |
| 26 | 66 KV Bushing |
| 27 | 33 KV Bushing |
| 28 | 11 KV Bushing |
| 29 | Overhauling of Circuit Breaker :- VCB/MOCB/SF6/ACBChecking of oil/gas pressure drop during duty cycle operation check, Checking of auto-starting / stopping of oil pump,pressure switch setting,etc, Checking of healthiness of accumulator by checking the pre-charging pressure when building up pressure from zero, Checking of operation of safety valve, checking of air compressor, Cleaning of breaker units, checking of protection equipments and replacement of defective ones, i.e., complete inspection and testing of SF6/VCB/MOCB/ACB type circuit breakers inclusive of operating mechanism.Checking of driving mechanism, trip/closing circuits/ checking and repairing of spring charge motor and checking of tripping and closing coils.checking of equipment earthing and strucure earthing. Maintaning gas levels, venting of circuit breakers, replacement of o-rings , gas kits including circuit breaker anylysisby Circuit breaker analyser.Checking of space heater and illumination.Required as per schedule of maintenance |
| 30 | 220KV SF6 Breaker |
| 31 | 132KV SF6 Breaker |
| 32 | 66 KV MOCB/SF6 |
| 33 | 33 KV VCB |
| 34 | Replacement of damaged pole of the circuit breaker including carriage of the equipment from divisional store to the site of work and back carriage of the damaged equipment to the divisional store |
| 35 | 220KV SF6 Breaker |
| 36 | 132KV SF6 Breaker |
| 37 | 66 KV MOCB/SF6 |
| 38 | 33 KV VCB |
| 39 | CVT\"s /CT\"s /PT\"s :- Visual checking of earthing HFpoint (in case it is not being used for PLCC,Checking of any breakage or cracks in porclean insulator, Cleaning of CVT capacitor stacks and tightness of terminal connections,Checking and tightness of all connections including earth connections.Checking of healthiness of gaskets, Checking ofneutral earthing in CVT, healthiness of all gaskets and oil level and its topping.Measurement of IR value and tightening of all connections and droppers.Primary injection test of CT/PT, Tan delta,knee point value, burden etc. |
| 40 | 220 KV |
| 41 | 132 KV |
| 42 | 66 KV |
| 43 | 33 KV |
| 44 | Replacement of damaged CT/PT includingcarriage of the Equipmentfrom divisional store to the site of work and back carriage of the damaged equiupment to the divisional store. |
| 45 | 220 KV |
| 46 | 132 KV |
| 47 | 66 KV |
| 48 | 33 KV |
| 49 | Surge Arrestors :-Checking of leakage current(third harmonic resistive current),Testing of counters and leakage current meters, Cleaning of insulators, Checking ofearth connections between surge arrester,surge monitor and earth, Checking of leakage current after cleaning of porcelain surface, cleaning of LA insulators. Measurement of IR value and tightening of droppers. |
| 50 | 220 kV |
| 51 | 132 kV |
| 52 | 66 kV |
| 53 | 33 KV |
| 54 | Replacement of damaged Surge Arrestor includingcarriage of the Equipmentfrom divisional store to the site of work and back carriage of the damaged equiupment to the divisional store. |
| 55 | 220 kV |
| 56 | 132 kV |
| 57 | 66 kV |
| 58 | 33 KV |
| 59 | Isolators :- Maintenance of linkages including transmission gears, stopper bolts. Cleaning of auxiliary switch contacts and greasing with silca grease, cleaning of support insulators, termination contacts, checking of elecctrical / mechanical interlocks with E/S and CB, mounting bolts, alignment, nuts, pins, space heater, illumination, healthiness of gaskets, auxiliary contacts, alignment of earthing blades, operation of earth switch, almunium / copper flexible conductor, earth connections of structures and MB. lubrication of operating mechanism, hinges lock joints, levers, bearings, main contacts, cleaning of post insulators, tightening of clamps. |
| 60 | 220 kV |
| 61 | 132 kV |
| 62 | 66 kV |
| 63 | 33 KV |
| 64 | Replacement of damaged Isolators includingcarriage of the Equipmentfrom divisional store to the site of work and back carriage of the damaged equiupment to the divisional store. |
| 65 | 220 kV |
| 66 | 132 kV |
| 67 | 66 kV |
| 68 | 33 KV |
| 69 | Reparing of Three phase motors of isolators including replacement of damaged winding and bearing. |
| 70 | Droppers/JumpersReplacement of damaged / burnt droppers or jumpersof isolators/ breakers/transformers /CT/PT /LA etc.220/132/66/33 KV Yard. |
| 71 | Clamps:Replacement of damaged/burnt PG/ PAD/T/CT/Bushing clamp etc |
| 72 | Post Insulators :- Checking of insulators for cracks and cleaning of insulators and its replacemnt. |
| 73 | 220 kV |
| 74 | 132 kV |
| 75 | 66 kV |
| 76 | 33 KV |
| 77 | Illumination System :- Checking of healthiness of fittings in station buildings, outdoor switch yard, Tightening of terminals, etc. |
| 78 | Replacement of 200 watt LED in the outdoor switch yard |
| 79 | Replacement of LED/CFL along with fitting in the control room/ division building/office complex |
| 80 | Battery Bank:Checking and cleaning of battery cell terminals, application of patrolum gelly, if required, conduction of battery impendence test and discharge test checking voltage temperature, current, sp. Gravity of individual cells as well as terminals voltage, battery dischrge testing etc.Checking of positive/Negative earth fault of dc.Terminal tightening. |
| 81 | Battery Charger :- Checking of control cards, measurement of test point voltage values, testing of DC earthfault and U/V relays, IR measurement of charger transformer, checking of earthing etc. Checking of charger panel / DCDB for electrical connections, cleanliness etc. |
| 82 | Protection System :- Checking of relays and application of CCl4 for cleaning,replacement of worn out/ defunct relays, checking and replacement of control wiring, if required, primery & secondery injection testing,software settings etc. |
| 83 | Cleaning of cable trenches/ ducts including of dressing of cables, trays, racks , repair of damaged duct covers etc |
| 84 | Main |
| 85 | sub main |
| 86 | T-off |
| 87 | Gantry Columns and Beams :- Tightening of all nuts / bolts and providing of missing nuts / bolts and replacement of damaged members. |
| 88 | 220 kV |
| 89 | 132 kV |
| 90 | 66 kV |
| 91 | 33 KV |
| 92 | L.T. Transformer :-Testing of oil BDV, IR measurement, Testing /checking of OTI,WTI and Buchholz (if provided, Checking of healthiness of Pressure relief diaphragm, Checking healthiness of Buchholz relay, Checking tightness of earthing connections |
| 93 | L.T Pannel:Cleaning of panels,bus bar insulators etc. Relays Testing, Tightning of all electrical connections,Checking of indicating meters ,Check for change-over facility, if provided,Check operation /indications in OFF Load condition of MCCB, |
| 94 | Earthing Mat :- Measurment of earth resistivity, checking of electrical continuity of equipment earthings, tightening of earthing connectors, removal of rust from bolted earth connectors and tightening and additional earthing wherever required.220/132/66/33 kV |
| 95 | DC Distribution Board :-Checking of connections, wiring, replacement of wiring if needed and checking of healthiness of all D/C and dc circuits of 33/66/132/220 Kv yards |
| 96 | AC Distribution Board :-Checking of connections, wiring, replacement of wiring if needed,fuses,MCB,bus bar CT, relays,MFM,LT switchs etcand checking of healthiness of all connections and AC circuits of 33/66/132/220 kv yards. |
| 97 | Control Cables: Replacement of damaged/outlived/burnt control cables of different cores including proper ferruling, thimbling and tagging and finally with all appropriate connections including lifting of duct covers and placing them back. |
| 98 | below 10 core |
| 99 | above 10 core |
| 100 | Marshelling koisk:-checking of all Terminal blocks, space heaters, light illumination, checking of all connnections and its cleaning. Fixing of cable glands earthing and checking of all other electrical accessories . |
| 101 | Capacitor Banks :-Checking/ tighteningof capacitor cells terminals, reactorand checking its wiring connection and its control circuit.etc |
| 102 | BUS BAR :-Replacement of damaged ACSR Conductor along with its fittings. |
| 103 | 220 kv yard |
| 104 | 132 kv yard |
| 105 | 66 kv yard |
| 106 | 33 kv yard |
| 107 | Automatic voltage regulator:-checking and tightening of connections, auto control unit, oil and its overhaulling |
| 108 | Diesel Generator set: Maintenance and checking of its operation. |
| 109 | Deweeding of switch yard |
| 110 | Painting of outdoor equipments (Transformers, MK\"s, CT/PT/CVT, Protection wall, Circuit breaker, isolatores, poles etc. |
| 111 | AC Units: Checking and Servicing of Installed AC unit inside control room (1- 3 Ton) /office building/division building/residential quarters etc |
| 112 | White-Washing of Control Room/Residencial Quarters atGrid Stations, Guest houseand Divisional Office building |
| 113 | Upkeep of Sanitaryinstalled in the control room/ office building/division building/residential quaters/Toilets and replacement of any damageditem if required. |
| 114 | Upkeep of electrical accessories installed in the control room/ office building/division building/residential quarters and replacement of any damageditem if required. |
| 115 | Providing of skilled/ semi skilled/ un skilled labour for the works which are not coverd from s.no. 1 to 29 |
| 116 | skilled labour |
| 117 | semi- skilled |
| 118 | un skilled |
| 119 | Store Handling |
| 120 | Unloading of Material in the Divisional store |
| 121 | 220/132/66/33 KV Breaker |
| 122 | 220/132/66/33 KV CT\"s |
| 123 | 220/132/66/33 KV PT\"s |
| 124 | 220/132/66/33 KV LA\"s |
| 125 | 220/132/66/33 KV Isolator |
| 126 | Carriage of Material from Unloading site to stacking site and stacking the material properly |
| 127 | 220/132/66/33 KV Breaker |
| 128 | 220/132/66/33 KV CT\"s |
| 129 | 220/132/66/33 KV PT\"s |
| 130 | 220/132/66/33 KV LA\"s |
| 131 | 220/132/66/33 KV Isolator |
| 132 | Shifting of material to make the space for adjustment of material |
| 133 | 220/132/66/33 KV Breaker |
| 134 | 220/132/66/33 KV CT\"s |
| 135 | 220/132/66/33 KV PT\"s |
| 136 | 220/132/66/33 KV LA\"s |
| 137 | 220/132/66/33 KV Isolator |
| 138 | Carriage of material from divisional store to loading site |
| 139 | 220/132/66/33 KV Breaker |
| 140 | 220/132/66/33 KV CT\"s |
| 141 | 220/132/66/33 KV PT\"s |
| 142 | 220/132/66/33 KV LA\"s |
| 143 | 220/132/66/33 KV Isolator |
| 144 | Loading of material in the vechile. |
| 145 | 220/132/66/33 KV Breaker |
| 146 | 220/132/66/33 KV CT\"s |
| 147 | 220/132/66/33 KV PT\"s |
| 148 | 220/132/66/33 KV LA\"s |
| 149 | 220/132/66/33 KV Isolator |
| 150 | Surface density/bush cutting/levelling of store premises. |
| 151 | Disposal of material/Mulba from the store to outside the store premises |
| 152 | Replacement/repairing of Street light/LED light inside store premises by way of changing street light,control cable (Complete job) |
| 153 | Repair of Sheds inside store premises by way of changing Tin,Angles,channels Complete job( area 10ft x 63ft X 47 ft) |
| 154 | Cleaning of Drainage/front area of store/Guest house during Monsoon/Rainy season |
| 155 | Guest House-I |
| 156 | Washing of bed sheets/Curtains. |
| 157 | Repair of switch boards/electrical circuits including replacement of electrical components. |
| 158 | NIFPS |
| 159 | CHECKING OF NITROGEN PRESSURE, CHECKING OPERATING AND LOCKING MECHANISM& TIGHTENING OF CONNECTIONS ETC. |
| 160 | CLEANING OF NIFPS OIL TANKS, PAINTING IF REQUIRED AND TIGHENING AND CHECKING OF OIL AND NITROGEN PIPES AND VALVES. |
| 161 | FUNCTIONAL TEST, CHECKING CONNECTIONS AND OPERATION OF TCIV VALVE. |
| 162 | CHECKING, TIGHTNESS OF GLANDS, LIMIT SWITCH, MOISTURE INGRESS CONTROL , ALARM TEST ETC. |
| 163 | DRAINAGE |
| 164 | CLEANING AND REMOVAL OF SLUDGE FROM SUM PITS. |
| 165 | CHECKING OF 2 HP 3- PHASE DRAIN MOTOR CONNECTIONS AND OTHER PUMBING ACCESSORIES LIKE GI PIPES , CHECK VALVES ETC , ENSURING PROPER WATER EVACUATION. |
| 166 | REWINDING OF 2HP 3-PHASE MOTOR. |
| 167 | CHECKING OF 0.5 HP SINGLE-PHASE DRAIN MOTOR CONNECTIONS AND OTHER PUMBING ACCESSORIES LIKE GI PIPES , CHECK VALVES ETC , ENSURING PROPER WATER. |
| 168 | REWINDING OF 0.5 HP SINGLE-PHASE MOTOR. |
| 169 | CONTROL ROOM N STAFF COLONY WATER SUPPLY. |
| 170 | CHECKING, OVERHAULING OF 5HP 3-PHASE INDUCTION MOTOR-PUMP SET ALONG WITH ALL PLUMBING ACCESSORIES ENSURING PROPER WATER EVACUATION IN CONTROL. |
| 171 | REWINDING OF DAMAGED 5HP 3-PHASE INDUCTION MOTOR |
| 172 | CHECKING, OVERHAULING OF 5HP 3-PHASE SUBMERISBLE INDUCTION MOTOR-PUMP SET ,TIGHTENING ALONG WITH ALL PLUMBING ACCESSORIES ENSURING PROPER WATER EVACUATION IN CONTROL ROOM AND STAFF COLONY. |
| 173 | REWINDING OF DAMAGED 5HP 3-PHASE INDUCTION MOTOR-PUMP SET INCLUDING LABOUR CHARGES FOR REMOVAL OF MOTOR FROM THE BOREWELL APPROX 150FT. |
| 174 | CHECKING, TIGHTENING OF ELECTRICAL CONNECTIONS OF 3-PHASE MOTOR STARTER AND REPLACING ANY DAMAGED/FAULTY PART. |
| 175 | CLEANING OF WATER SUPPLY TANKS |
| 176 | DG SET |
| 177 | ANNUAL SERVICE OF JACKSON MADE 125 KVA DG SET INCLUDING COST OF COSUMABLES LIKE FILTERS N ENGINE OIL ETC |
| 178 | OVER-HAULING OF JACKSON MADE 125 KVA DG SET INCLUDING COST OF CONSUMABLES LIKE FILTERS N ENGINE OIL ETC |
| 179 | AIR CONDITIONERS |
| 180 | SERVICING OF 2 TONNES HITACHI MAKE AIR CONDITIONERS ALONG WITH ANY MINOR REPAIRS IF ANY |
| 181 | SERVICING OF 4 TONNE HITACHI MAKE SPACE MAKER INDUSTRIAL AIR CONDITIONERS ALONG WITH ANY MINOR REPAIRS |
| 182 | SCADA/SUB-STATION AUTOMATION SYSTEM |
| 183 | CHECKING OF LAN WIRECONNECTIONS AND REPLACING ANY DAMAGED LAN CONNECTOR/WIRE |
| 184 | CHECKING OF OPTICAL FIBRECONNECTIONS AND REPLACING ANY DAMAGED OPTICAL FIBRE CONNECTOR/WIRE SPLICING |
| 185 | TROUBLSHOOTING ANY PROBLEMS IN SUB-STATION AUTOMATION SYSTEM/SCADA SOFTWARE GE MAKE DS AGILE BY GE ENGINEER |
| 186 | NEW PARAMATER INTEGERATION IN SCADA SOFTWARE GE DS AGILE BY GE ENGINEER |
| 187 | CHECKING AND TIGHTENING CONNECTIONS OF SCADA SERVERS ,ETHERNET SWICHES ETC |
| 188 | CHECKING AND TIGHTENING CONNECTIONS OF BAY CONTROL UNITS, LIUS IN SPRS |
| 189 | ILLUMINATION |
| 190 | CHECKING CONNECTIONS, REPAIR/REPLACEMENT OF 45 WATTS LED FLOOD LIGHTS AT LIGHTNING TOWERS IN THE YARD |
| 191 | CHECKING OF CONNECTIONS, CHANGE OF MCBS, TIMERS ETC IN LIGHTENING KIOSKS IN THE YARD |
| 192 | CHECKING OF CONNECTIONS, MCCBS, TRANSFORMER ETC IN ILLUMINATION PANEL/EMERGENCY PANEL IN THE CONTROL ROOM |
| 193 | FIRE ALARM SYSTEM |
| 194 | CHECKING OF CONNECTIONS AND ENSURING HEALTHINESS OF ALL ALARM ZONES IN THE FIRE ALARM SYSTEM IN CONTROL ROOM AND SPRS |
| 195 | ONLINE DRYOUT SYSTEM |
| 196 | TIGHTENING OF INLET AND OUTLET PIPE LINE CONNECTIONS, CONNECRTORS AND VALVES, CHANGE OF CARTRIDGE, VALVE OPERATIONS AND FUNCTIONS ETC. |
| 197 | BUS-BAR |
| 198 | TIGHTENING OF ALL SUPPORT CONNECTIONS, BUNDLE SEPARATORS/PGS OF QUAD-MOOSE BUS-BAR |
| 199 | REPAIRING MOOSE BUSBAR BY PG/REWINDING |
| 200 | TIGHTENING OF ALL SUPPORT CONNECTIONS, BUNDLE SEPARATORS/PGS OF TWIN-MOOSE BUS-BAR |
| 201 | IP CAMERA BASED SURVELLIANCE SYSTEM |
| 202 | CHECKING OF ALL IP CAMERA ELECTRICAL/FIBRE/LAN CONNECTIONS, HEALTHINESS OF MEDIA CONVERTERS, POWER ADAPTERS, POWER SUPPLY, CAMERAS, MOISTURE INGRESS |
| 203 | CHECKIN HEALTHINESS CAMERA PANEL IN CONTROL ROOM, DVR CONEECTIONS, STORAGE SYSTEM AND DISPLAY, POWER SUPPLY, MEDIA CONVERTERS ETC |
| 204 | Transmission line S/C and D/C 132 KV LINE :- ( Including carriage of T&P from stores and Shutdown Factor) |
| 205 | Checking and tightening of jumpers |
| 206 | Fixing of damper/vibrator on earthwire/ACSR Conductor |
| 207 | Replacement of damaged disc insulators |
| 208 | Tension string |
| 209 | Suspension string |
| 210 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 211 | Stringing and sagging of ACSR/AAACconductor including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 212 | Repairing of ground wire when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 213 | Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 214 | Transmission line S/C and D/C 220 KV LINE :- ( Including carriage of T&P from stores and Shutdown Factor) |
| 215 | Checking and tightening of jumpers |
| 216 | Fixing of damper/vibrator on earthwire/ACSR Conductor |
| 217 | Replacement of damaged disc insulators |
| 218 | Tension string |
| 219 | Suspension string |
| 220 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 221 | Stringing and sagging of ACSR/AAACconductor including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 222 | Repairing of ground wire when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension |
| 223 | Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 224 | Tower S/C and D/C 132 KV :-( Including carriage of T&P from stores and Shutdown Factor) |
| 225 | Foundation:-Repairing of damaged foundation and protection wall(Revetment) including back filling of earthwith RCC concreating. |
| 226 | Provision of providing crate wall (Gabbon wall) |
| 227 | Tightening of nuts and bolts of tower superstructures replacement of missing ones. |
| 228 | a) Tower weight more than 4 tonnes to 7.5 tonnes |
| 229 | b) Tower weight more than 7.5 tonnes |
| 230 | Checking/ tightening of tower footing earthing bolts and measuring tower footing resistance. |
| 231 | Branch cutting: under the coridor of 132 KV S/C and D/C transmission line 16 mtrand under tower structure |
| 232 | Replacement of missing tower members. |
| 233 | Reparing damaged conductor by using helical sleeve or Bolted or by shorting method with out lowering the conductor |
| 234 | Fixing of anti-climbing device/Bird Guardover S/C &D/C tower |
| 235 | Fixing of phase plates/No. plates/danger plates overS/C & D/C tower |
| 236 | Fixing of repair sleeves compression type for over ACSR conductor |
| 237 | Tower S/C and D/C 220 KV :-( Including carriage of T&P from stores and Shutdown Factor) |
| 238 | Foundation:-Repairing of damaged foundation and protection wall(Revetment) including back filling of earthwith RCC concreating. |
| 239 | Provision of providing crate wall (Gabbon wall) |
| 240 | Tightening of nuts and bolts of tower superstructures replacement of missing ones. |
| 241 | a) Tower weight more than 4 tonnes to 7.5 tonnes |
| 242 | b) Tower weight more than 7.5 tonnes |
| 243 | Checking/ tightening of tower footing earthing bolts and measuring tower footing resistance. |
| 244 | Branch cutting: under the coridor of 220 KV S/C and D/C transmission line 16 mtrand under tower structure |
| 245 | Replacement of missing tower members. |
| 246 | Reparing damaged conductor by using helical sleeve or Bolted or by shorting method with out lowering the conductor |
| 247 | Fixing of anti-climbing device/Bird Guardover S/C &D/C tower |
| 248 | Fixing of phase plates/No. plates/danger plates overS/C & D/C tower |
| 249 | Fixing of repair sleeves compression type for over ACSR conductor |
| 250 | Store handling: |
| 251 | ShiftingofT&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Gladni including manual carriage within store yard from stacking site to loading/unloading site. |
| 252 | ShiftingofT&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Gladni including manual carriage within store yard from loading/unloadingsite to stacking site. |
| 253 | Unloading / Loading /shifting ofCement in divisional store Gladni Including manual Carriage within store yard. |
| 254 | ShiftingofTower material including all accessories in divisional store Gladni Including manual Carriage within store yard from stacking site to sorting/loading site. |
| 255 | ShiftingofTower material including all accessories in divisional store Gladni Including manual Carriage within store yard from sorting site to stacking site. |
| 256 | ShiftingofDisc Insulators/Fittings in divisional store Gladni Including manual Carriage within store yard from stacking site to carriage/loading site. |
| 257 | Making space by way of shifting material like fittings, clamps, disc insulators, conductors, control cable for the incoming material. |
| 258 | ShiftingofDisc Insulators/Fittings in divisional store Gladni Including manual Carriage within store yard from unloading site to stackingsite. |
| 259 | Unloading / Loading of conductor/control cable etc in divisional store Gladni Including manual Carriage within store yard. |