Tender For Road Construction Work In The Court Premises. - Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means).DSR 16.77 2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. D.S.R.2.8.1 3 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Under Floor) as per SI no 2.27 4 GSB Grading-1Construction ofgranular Sub-baseby providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel rollerto achieve the desired density, complete as perTechincal Specificationclause 401 5 WBM Grad-2Providing, laying, spreading and compacting stone aggregates of specific sizes (45-63 mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Grading-2 as per Technical specification Clause 405 6 WBM Grade-3Providing, laying, spreading and compacting stone aggregates of 53mm to 22.4mm sizes (Crusher broken) to water bound macadam (WBM III) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(WBM III) 7 Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg per sqm using mechanical means as per Technical specification Clause 502 8 Providing and applying tack coat with bitumen usingpressure distributor at the rate of 0.275 kg per sqm on the prepared non bituminous surface cleaned with hydrolic broomas per temechanical specificatiob clause 503. 9 Providing, Laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emuslion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Tehnical Specification Clause 508 10 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels , grade and cross fall using TypeC as per Technical Specification Clause 510 11 Brick edging on both side of road with first class brick 8 cm wide 12 cm deep as per SI No 765 12 Brick work with common burnt clay F.P.S. ( Non modular ) briks of class designation 7.50 in foudation and plinth inD.S.R.6.1 13 Reinforced cement concrete work in beams, suspended floors, roof having slope upto 15 degree, landings, balconies, shelves, chajjas, lintels, bands, staircases and spiral staircases etc. above plinth level up to floor V level, excluding the cost of centering, shuttering, finishing and reinforcement : in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)-Slab 14 Steel reinforcement for R.C.C. work ready to use cut and bend rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1 15 12 mm cement plaster in single coat on rough side of single or half brick wall finished with a floating coat of neat cement. (1) 1 cement : 3 Coarse sand 16 Supply and fixing100 mm dia pipe for drainage, Ref DSR17.35.1.1 17 Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawingand Technical Specification Clause 1501 18 Supply and fixing ofsign board,including painting, lettingetc. complete