| 1 | Shifting of H.T/ L.T. lines |
| 2 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 3 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 4 | Muffs with concerete filling - PROVIDED BY HPSEBL |
| 5 | Prov AAAC 7/3.15mm² Conductor (50mm²) {Includes Cutting and wastage} |
| 6 | Prov ACSR 6/1/2.59 30MM COND. |
| 7 | LT AB cable (3x95+1x70sqmm) |
| 8 | LT AB cable (3x120+16+70sqmm) |
| 9 | LT PVC Cable 3.5C 35 sqmm |
| 10 | Anchoring Assembly |
| 11 | Suspension Assembly |
| 12 | Facade Hooks |
| 13 | Shackle Insulator (16 kN) |
| 14 | D-Iron (U- Clamps) - PROVIDED BY HPSEBL |
| 15 | Earth Knob |
| 16 | Prov.M.S C.I X-Arm (2400x100x50x6 mm),Long For Double Pole |
| 17 | Prov.M.S C.I X-Arm (1500x100x50x6 mm),Long For Single Pole |
| 18 | Prov.M.S A.I X-Arm (2700x50x50x6 mm),Long For Double Pole |
| 19 | Prov.M.S A.I X-Arm (1800x50x50x6 mm),Long For Single Pole |
| 20 | Prov M.S A.I X-Arm (50x50x6 mm), Length (2x750) mm Long For Single Pole |
| 21 | Prov M.S A.I X-Arm (50x6 mm), Length (2x600) mm Long For Single Pole |
| 22 | Prov 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN) - PROVIDED BY HPSEBL |
| 23 | Prov Disc insulator ,1 No Disc (12 kV, 90 kN) including Dead End Clamps etc. |
| 24 | Prov Danger Plate (250X200X1.6 mm) - PROVIDED BY HPSEBL |
| 25 | Prov Stay set complete in all respect- PROVIDED BY HPSEBL |
| 26 | Prov HT Stay Set - PROVIDED BY HPSEBL |
| 27 | Prov LT Stay Set - PROVIDED BY HPSEBL |
| 28 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) - PROVIDED BY HPSEBL |
| 29 | Prov HT Earthing set complete |
| 30 | Prov Double Continous Earth wire (GI, 8 SWG) @ 0.102 kg/m |
| 31 | Full Clamp - PROVIDED BY HPSEBL |
| 32 | Prov half Clamps (M.S. Flat 50X6 mm) - PROVIDED BY HPSEBL |
| 33 | Prov Egg Insulator LT- PROVIDED BY HPSEBL |
| 34 | Prov Egg Insulator HT- PROVIDED BY HPSEBL |
| 35 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 36 | Prov Barbed Wire |
| 37 | Aluminium Paint |
| 38 | Add Erection charges of AAAC 7/3.15 mm sq cond. |
| 39 | Add Erection Charges of sagging L T lineAAAC 7/3.15mm2(50mm²) |
| 40 | Laying stringing & sagging of ACSR 6/1.2.59 MMsq |
| 41 | Add Dismentalment ChargesofL T lineAAAC 7/3.15mm2(50mm²) ( 0.090*4=0.360)+(0.03*4=0.120)=0.480 |
| 42 | Add Erection chargesof LT AB Cable |
| 43 | Add Erection chargesof S.T Pole |
| 44 | Add Erection chargesof S.T Pole 9 Mtr Long (HT) |
| 45 | Add Erection chargesofLT Stay Set |
| 46 | Add Erection charges of HT Stay Set |
| 47 | Add Erection charges of HT Earthing Set |
| 48 | Add Erection chargesof Double S.T Pole 9 Mtr Long |
| 49 | Add Erection chargesof G.I wire |
| 50 | Add Transportation charges complete in all respect |
| 51 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |