}

Tender For Electric Motor And Pump Repairing And Other Related Works, shahada-Maharashtra

Directorate Of Municipal Administration has published Tender For Electric Motor And Pump Repairing And Other Related Works. Submission Date for this Tender is 07-03-2025. Pump repair and Maintenance Tenders in shahada Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

48012068
Tender For Electric Motor And Pump Repairing And Other Related Works
Open Tender
Indian
Maharashtra
Shahada
07-03-2025

Tender Documents

Tender Details

Tender For Electric Motor And Pump Repairing And Other Related Works-2 75 HP Motor Rewinding 3 75 HP Motor New Bearing Topside 7316 / 7320 (Skf/fag/Equi) Bearing Replacement Deep Fitting Labor Included 4 75 HP Motor New Bearing Bottomside 7316 / 6212 (Skf/fag/Equi) Bearing Replacement Deep Fitting Labor Included 5 75 HP Motor Bearing Shaft Filling Labor Included 6 75 HP Motor Cover Sleeve Installation Labor Included 7 75 HP Motor New Air Fan Installation Labor Included 8 75 HP Motor New Terminal Plate Installation Labor Included 9 75 HP Vertical Pump New Line Shaft Installation Labor Included 10 75 HP Vertical Pump New Impeller Installation with labor 11 75 HP Vertical Pump New Sleeve Installation with labor 12 75 HP Vertical Pump New Necking Installation with labor 13 75 HP Vertical Pump Assembly Shaft Installation with labor 14 75 HP Vertical Pump Rubber Bushing Installation for Line Shaft-Coupling with labor 15 75 HP Vertical Pump Metal Bushing Installation for Line Shaft-Coupling with labor 16 75 HP Vertical Pump New Line Shaft Coupling Installation with labor 17 75 HP Vertical Pump New Line Shaft Ratchet Installation with labor 18 75 HP Vertical Pump Removal labor including packing rope of pump 19 75 HP Vertical Pump New Gald (Monkey) Installation labor 20 75HP VT Pump Jackwell Removal / Pump, Shaft, Pipe Included 21 60 HP Motor Rewinding 22 60 HP Motor New Bearing Installation Labor 23 60 HP Motor Rotor Shaft Welding Installation Labor 24 60 HP Motor New Cover Sleeve Installation Labor 25 60 HP Motor New Air Fan Installation Labor 26 60 HP Motor New Terminal Plate Installation Labor 27 60 HP Motor New Joint Rubber Installation 16 Nos. for Couple Pulley Installation Labor 28 60 HP Centrifugal Pump Installing new impeller 29 60 HP centrifugal pump installing new bearing 30 60 HP centrifugal pump installing new shaft 31 60 HP centrifugal pump installing new bushing 32 60 HP centrifugal pump shaft welding and filling 33 60 HP centrifugal pump installing new body packing 34 60 HP centrifugal pump installing new rotor shaft key 35 60 HP centrifugal pump installing new necking 36 60 HP installing new couple pulley 37 60 HP couple pulley welding and filling 38 60 HP centrifugal pump installing new gate 39 60 HP centrifugal pump deep With fitting labor 40 60 HP Centrifugal Pump Bearing Cover Sleeve 41 20 HP Monoblock Motor Rewinding 42 20 HP Monoblock Motor New Bearing Installation 43 20 HP Monoblock Motor Rotor Shaft Welding Installation 44 20 HP Monoblock Motor New Air Fan Installation 45 20 HP Monoblock Motor New Terminal Plate Installation 46 20 HP Monoblock Motor New Cover Sleeve Installation 47 20 HP Pump New Impeller Installation 48 20 HP Pump New Bushing Ring Installation 49 20 HP Pump New Sleeve Installation 50 15 HP Monoblock Motor Rewinding 51 15 HP Monoblock Motor New Cover Sleeve Installation 52 15 HP Monoblock Motor New Air Fan Installation 53 15 HP Monoblock Motor New Terminal Plate Installation 54 15 HP Monoblock Motor Rotor Shaft Welding Installation 55 15 HP Pump New Impeller Installation 56 15 HP Pump New Bearing Installation 57 15 HP Pump New Cover Sleeve Installation 58 15 HP Pump New Air Fan Installation 59 15 HP Pump New Sleeve Installation 60 15 HP Pump New Gland Cable Installation 61 5 HP Monoblock Rewinding 62 5 HP Monoblock New Bearing installation 63 5 HP Monoblock Shaft welding and filling 64 5 HP Monoblock New Cover Sleeve Installation 65 5 HP Monoblock New Air Fan Installation 66 5 HP Monoblock New Terminal Plate Installation 67 5 HP Pump New Impeller Installation 68 5 HP Pump New Sleeve Installation 69 5 HP Pump New Gland Cable Installation 70 5 HP Siren Motor Rewinding 71 5 HP Siren Motor New Bearing Installation 72 5 HP Siren Motor New Shaft Welding and Filling 73 5 HP Siren Motor New Cover Sleeve (Butch) Installation 74 5 HP Siren Motor new terminal plate installation 75 5 HP Siren Motor new blower impeller installation 76 5 HP Siren Motor new sleeve installation 77 1 HP Single Phase Monoblock Motor rewinding 78 1 HP Single Phase Monoblock Motor new bearing installation 79 1 HP Single Phase Monoblock Motor new cover sleeve installation 80 1 HP Single Phase Monoblock Motor new terminal plate installation 81 1 HP Single Phase Monoblock Motor new air fan installation 82 1 HP Single Phase Monoblock Motor rotor shaft welding filling 83 1 HP Single Phase Pump new impeller installation 84 1 HP Single Phase Pump new sleeve Installation 85 1 HP Single Phase Pump New Gland Cable Installation 86 3 HP Monoblock Motor Rewinding 87 3 HP Monoblock Motor New Bearing Installation 88 3 HP Monoblock Motor New Cover Sleeve Installation 89 3 HP Monoblock Motor New Terminal Plate Installation 90 3 HP Monoblock Motor New Air Fan Installation 91 3 HP Monoblock Motor Rotor Shaft Welding Filling 92 3 HP Pump New Impeller Installation 93 3 HP Pump New Sleeve Installation 94 3 HP Pump New Water Seal Installation 95 V.8 25 HP El. Rewinding Submersible Motor 96 V.8 25 HP El. Submersible Motor Rotor Bushing Installation 97 V.8 25 HP El. Submersible Motor New Stator Lock Installation 98 V.8 25 HP El. Submersible Motor New Housing Installation 99 V.8 25 HP El. Submersible Motor New Thrust Bearing Installation 100 V.8 25 HP El. Submersible Motor New Fiber Plate Installation 101 V.8 25 HP El. Submersible Motor New Coupler 102 V.8 25 HP El. Submersible Motor New Coupler Installation 103 V.8 25 HP El. Submersible Motor New Adapter Installation 104 V.8 25 HP Pump Installing New Shaft 105 V.8 25 HP Pump Installing New Impeller 106 V.8 25 HP Pump Installing New Ring Couple 107 V.8 25 HP Pump New T Bolt Installation 108 V.8 25 HP Pump New Bottom Piece Installation 109 V.8 25 HP Pump New Sleeve Installation 110 V.8 25 HP Pump New Bushing Installation 111 V.6 12.5 HP Submersible Motor Rewinding 112 V.6 12.5 HP Submersible Motor Rotor Bushing Installation 113 V.6 12.5 HP Submersible Motor Thrust Bearing Installation 114 V.6 12.5 HP Submersible Motor Fiber Plate Installation 115 V.6 12.5 HP Submersible Motor T. Bolt Installation 116 V.6 12.5 HP Submersible Motor Couple Key Filling 117 V.6 12.5 HP Submersible Motor Couple Installation 118 V.6 12.5 HP Pump New Impeller Installation 119 V.6 12.5 HP Pump New Sleeve Installation 120 V.6 12.5 HP Pump New Bushing Installation 121 V.6 12.5 HP Pump New Shaft Installation 122 V.6 12.5 HP Pump New Bottom Piece Installation 123 V.6 10 HP Submersible New Motor Supply MJP Approved 124 V.6 10 HP Submersible New Pump 10 Stage Supply 125 V.6 10 HP Submersible Motor Rewinding 126 V.6 10 HP Submersible Motor Shaft Cutting and Installing New Bushing 127 V.6 10 HP Submersible Motor New Housing Installation 128 V.6 10 HP Submersible Motor New Fiber Plate Installation 129 V.6 10 HP Submersible Motor New Thrust Bearing Installation 130 V.6 10 HP Submersible Motor New Couple Key Installation 131 V.6 10 HP Submersible Motor New Stator Lock W Cut Installation 132 V.6 10 HP Pump New Shaft Installation 133 V.6 10 HP pump new impeller installation 134 V.6 10 HP pump new coupling installation 135 V.6 10 HP pump new sleeve installation 136 V.6 10 HP pump new bushing installation 137 V.6 10 HP pump new key installation 138 V.6 10 HP pump new T-bolt installation 139 V.6 10 HP pump new bottom piece installation 140 v.6 10HP pump repair 141 V.4 3 HP submersible motor rewinding 142 V.4 3 HP submersible motor shaft cutting and new bushing installation 143 V.4 3 HP submersible motor new housing installation 144 V.4 3 HP Submersible Motor New Fiber Plate Installation 145 V.4 3 HP Submersible Motor New Thrust Bearing Installation 146 V.4 3 HP Submersible Motor New Couple Key Installation 147 V.4 3 HP Submersible Motor New Stator Lock V Cut Installation 148 V.4 3 HP Pump New Shaft Installation 149 V.4 3 HP Pump New Impeller Installation 150 V.4 3 HP Pump New Couple Installation 151 V.4 3 HP Pump New Sleeve Installation 152 V.4 3 HP Pump New Bushing Installation 153 V.4 3 HP Pump New Key Installation 154 V.4 3 HP Pump New T-Bolt Installation 155 V.4 3 HP Pump New Bottom Piece Installation 156 V.4 3 HP New Starter for Single Phase Motor 157 Capacitor for V.4 3 HP Panel Starter 158 Supply of New Submersible El. Motor Pump V6 10 HP / 10 Stage Pump MJP Approved 159 Supply of New Submersible El. Motor Pump V8 25 HP / 8 Stage Pump MJP Approved 160 Supply of New Submersible El. Motor Pump 3 HP Openwell Submersible Pump 161 Supply of New Submersible El. Motor Pump 5 HP Openwell Submersible Pump 162 Supply of New Submersible El. Motor Pump Motor Pump 3 Phase 5 HP Supply 163 New Submersible El. Motor Pump Single Phase 3 HP Supply 164 New Submersible El. Motor Pump Single Phase 2 HP Supply 165 New Submersible El. Supply of Motor Pump Single Phase 1 HP 166 Supply of materials required for 75 HP and 60 HP starter repair (Panel Type) LC1 FDP 115 A Contact 167 Supply of materials required for 75 HP and 60 HP starter repair (Panel Type) LC1 FDP 150 A Contact 168 Supply of materials required for 75 HP and 60 HP starter repair (Panel Type) LC1 FDP 200 A Contact 169 Supply of materials required for 75 HP and 60 HP starter repair (Panel Type) LC1 FDP 250 A Contact 170 75 HP and 60 HP Starter Repair Kit (Panel Type) LC1 FDP 300 A Contact 171 75 HP & 60 HP Starter Repair Kit (Panel Type) Relay Range 63/80 AMP LRD 80363 172 75 HP & 60 HP Starter Repair Kit (Panel Type) Contact MNX-9 173 75 HP & 60 HP Starter Repair Kit (Panel Type) EN 60947-4-1 Coil 174 75 HP & 60 HP Starter Repair Kit (Panel Type) IS 13947-4-1 Coil 175 75 HP and 60 HP Starter Repair Supplies (Panel Type) EN 60947-5-1 Coil 176 75 HP and 60 HP Starter Repair Supplies (Panel Type) IS 13947-5-1 Coil 177 75 HP and 60 HP Starter Repair Supplies (Panel Type) TC1D6511 Timer Coil 178 75 HP and 60 HP Starter Repair Supplies (Panel Type) TA2 DT2 01-3OS on delay timer 179 75 HP and 60 HP Starter Repair Supplies Supply of required materials (Panel type) TA3 DT2 01-3OS on delay timer 180 Supply of 75 HP and 60 HP starter transformer new 181 Repair of 75 HP and 60 HP starter transformer coil 182 Supply of new starter 75 HP starter new - ISI Mark (Stor Delta) 183 Supply of new starter 60 HP starter new - ISI Mark (Stor Delta) 184 Supply of new starter 15-20HP starter new - ISI Mark (Stor Delta) 185 75 HP, 60 HPStor Delta Oil Starter Repair Required Providing material 100Amp Moving Contact 186 75 HP, 60 HP Store Delt 187 75 HP, 60 HP Star Delta Oil Starter Repair Supplies Transformer Oil 188 20 HP, 15 HP and 10HP New Star Delta) ISI Mark Starter Supplies 189 20 HP, 15 HP(Star Delta) ISI Mark Starter Supplies 18 X 36 Relay 190 20 HP, 15 HP(Star Delta) ISI Mark Starter Supplies Coil 360 X 440 191 20 HP, 15 HP(Star Delta) ISI Mark Starter Supplies Contact Kit 192 20 HP, 15 HP(Star Delta) ISI Mark Starter Supplies Fiber Plate 193 20 HP, 15 HP(Star Delta) ISI Mark Starter Supplies Timer Coil 194 20 HP, 15 HP and 10 HP Oil Star Data Starter Repair Supplies Relay 18 X 30 195 20 HP, 15 HP and 10 HP Oil Star Data Starter Repair Supplies Coil 360 X 440 196 20 HP, 15 HP and 10 HP Oil Star Data Starter Repair Supplies Fiber Plate 197 20 HP, 15 HP and 10 HP Oil Star Data Starter Repair Supplies Contact Kit 198 New Panel Type Starter M1/M2 (Star Delta) for 15HP/20HP 199 New Panel Type Contact M1/M2 (TC1Dx254-AC3-25Amp) for 15HP/20HP 200 Relay Panel Type Starter 21x30 TC 201 Coil 280x440 (M1/M2) 202 New Panel Type Auto Switch-3 200x450 V AC 203 New Auto Switch ISI Mark Supply From 5 HP to 25 HP 204 Supply of 5 HP and 3 HP Motor Panel Supplies MCCBN.C 332N 3PHASE C32 205 Supply of 5 HP and 3 HP Motor Panel Accessories MCCBN.C 320N 3PHASE C20 206 Supply of 5 HP and 3 HP Motor Panel Accessories MCCBN.C 310N 3PHASE C10 207 Supply of 5 HP and 3 HP Motor Panel Accessories MCCBN.C 432N 4PHASE C32 208 Supply of CHANGE OVER SWITCH DISCONNECTOR ISI Mark New 32Amp 209 CHANGE OVER SWITCH DISCONNECTOR ISI Mark 63Amp 210 CHANGE OVER SWITCH DISCONNECTOR ISI Mark 125Amp 211 Supply of Copper Cable ISI Mark New 10 SQ mm Flat 3 Core Cable 212 Supply of Copper Cable ISI Mark New 6 SQ mm Flat 3 Core Cable 213 Copper Cable ISI Mark New Supply 4 SQ mm Flat 3 Core Cable 214 Copper Cable ISI Mark New Supply 2.5 SQ mm Flat 3 Core Cable 215 Copper Cable ISI Mark New Supply 50 SQ mm Single Core Cable 216 Copper Cable ISI Mark New Supply 25 SQ mm Single Core Cable 217 Aluminum ISI Mark Armored Cable 3.5 Core Supply 20 SQ mm 218 Aluminum ISI Mark Armored Cable 3.5 Core Supply 50 SQ mm 219 Aluminum ISI Mark Armored Cable 3.5 Core Supply 185 SQ mm 220 Aluminum ISI Mark Armored Cable 3.5 Core Supply 240 SQ mm 221 Aluminum ISI Mark Armored Cable 3.5 Core Supply 300 SQ mm 222 Aluminum Service Wire ISI Mark 10 mm Single Core 223 Aluminum Service Wire ISI Mark 15 mm Single Core 224 Aluminum Cable ISI Mark 70 mm Single Core 225 Aluminum Cable ISI Mark 95 mm Single Core 226 Breaker Switch ISI Mark New 63 A MCCB 10 kA 227 Breaker Switch ISI Mark New 80 A MCCB 25 kA 228 Breaker Switch ISI Mark New 125 A MCCB 35 kA 229 Breaker Switch ISI Mark New 160A MCCB 25 kA 230 Breaker Switch (Breker Switch) ISI Mark New Supply 200A MCCB 25 kA 231 Breaker Switch (Breker Switch) ISI Mark New Supply 200A MCCB 36 kA 232 Breaker Switch (Breker Switch) ISI Mark New Supply 250A MCCB 25 kA 233 Breaker Switch (Breker Switch) ISI Mark New Supply 250A MCCB 36 kA 234 Breaker Switch (Breker Switch) ISI Mark New Supply 300A MCCB 36 kA 235 Breaker Switch (Breker Switch) ISI Mark New Supply 400A MCCB 36 kA 236 Breaker Switch (Breker Switch) ISI Mark New Supply 630A MCCB 36 kA 237 Tester (Taparia) to be provided 238 Screw driver (Taparia) to be provided 239 Pliers (Pinch) to be provided 240 Fuse wire 30/60Amp to be provided 241 Cotton tape 30 pcs to be provided 242 Screw rubber to be provided 243 Copper lugs new to be provided copper 70mm 244 Copper lugs new to be provided copper 120mm 245 Aluminum lugs new to be provided 25 mm 246 Aluminum lugs new to be provided 70 mm 247 Aluminum lugs new to be provided 120 mm 248 Aluminum lugs new to be provided 250 mm 249 Providing new auto capacitors APP type 250 L.T.L.K. Contact kit 251 L.T.L.K. Base 252 L.T.L.K. coil 253 L.T.L.K. Relay 254 L.T.L.K. claw 255 L.T.L.K. New panel type stator for 15HP/20HP 256 L.T.L.K. Panel Type Contact Kit 257 63A kit kat fuse 258 100A kit kat fuse 259 63A connector 260 100A connector 261 63A main switch 262 Starter contact kit for 75HP / 60HP motor (complete set) 263 V.6 El. Motor submersible pump removal and installation from borewell (1 to 30 meters) 264 V.6 El. Motor submersible pump removal and installation from borewell (31 to 70 meters) 265 V.6 El. Motor submersible pump removal and installation from borewell (71 to 120 meters) 266 V.8 El. Motor submersible pump removal and installation from borewell (from 1 to 30 meters) 267 V.8 El. Motor submersible pump removal and installation from borewell (from 31 to 70 meters) 268 V.8 El. Motor submersible pump removal from borewell 269 ​​V.6 Removing a motor stuck and fallen in a borewell 270 V.8 Removing a motor stuck and fallen in a borewell 271 Installing a new block piston in a blower machine 272 Installing a new packing in a blower machine 273 Adding new engine oil No. 20/40 in a blower machine 274 Installing a new coupler in a blower machine 275 Installing a new rubber belt in a blower machine 276 Aligning and installing a new big wheel in a carryfluctor 277 Aligning and installing a new small wheel in a carryfluctor 278 Installing a new 20mm chain in a carryfluctor 279 Install new coupler for carifluctor 280 Install new gear box for carifluctor 281 Repair gear box for carifluctor 282 Align gear box shaft for carifluctor 283 Install gear box shaft key 284 Install new center ball bearing for carifluctor 285 Install new center ball bearing base plate for carifluctor 286 New ele. Miter box supply 287 50mm G I Clam 288 70mm G I Clam 289 90mm G I Clam 290 Borewell Chamber Cap 291 10mm Packing Rope 292 12mm Packing Rope 293 Welding Filler 294 Bead Pan 12 Inch 295 Bead Pan 14 Inch 296 Bead Pan 16 Inch 297 T.V.S. Nut Bolt 12mm (19 No.) (S.S.) 298 T.V.S. Nut Bolt 10mm (17 No.) (SS) 299 MS 10 and plain flour nut bolt 300 Leather paper packing 301 Studs as required (SS) 302 Borewell Cap (Dugga) 303 Main Panel, 75HP, 60HP Starter Panel Ameter Installation 304 Main Panel, 75HP, 60HP Starter Panel Voltmeter Installation 305 UPVC Column Pipe for Borewell 50 mm ISI Mark Heavy ( 10 Feet )

Key Value

Document Fees
INR 1000 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail