}

Tender For Financial Year 24-25 Under Reconstruction Work Of Kafurpur To Haiderpur Road - Part A (Bituminous Work) 2 Construction Of Embankment With Approved Material Obtained From Borow Pits With All Lifts And Leads Trancporting Upto 3 Km Upto Sites, S, sambhal-Uttar Pradesh

Public Works Department has published Tender For Financial Year 24-25 Under Reconstruction Work Of Kafurpur To Haiderpur Road - Part A (Bituminous Work) 2 Construction Of Embankment With Approved Material Obtained From Borow Pits With All Lifts And Leads Trancporting Upto 3 Km Upto Sites, S. Submission Date for this Tender is 17-03-2025. Road Work Tenders in sambhal Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47967393
Corrigendum : Tender For Financial Year 24-25 Under Reconstruction Work Of Kafurpur To Haiderpur Road - Part A (Bituminous Work) 2 Construction Of Embankment With Approved Material Obtained From Borow Pits With All Lifts And Leads Trancporting Upto 3 Km Upto Sites, S
Open Tender
Indian
Uttar Pradesh
Sambhal
17-03-2025

Tender Documents

Tender Details

Tender For Financial Year 24-25 Under Reconstruction Work Of Kafurpur To Haiderpur Road - Part A (Bituminous Work) 2 Construction of embankment with approved material obtained from borow pits with all lifts and leads trancporting upto 3 Km upto sites, spreading, grading to required slope and compected to meet requirement of table 300.2 and lead andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3as per TechnicalSpecification Clause 405. andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. 4 Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. SI No 765andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. 5 Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means as per Technical Specification Clause 502 andincluding all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. 6 Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with Hydraulic burmer incliding as per Tecnical Specification clause 503. andincluding all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. 7 P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm to 5.60mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. usingbitumen (VG-10) @ 146.00 Kg./100Sqm.as bearing course, including heating of bitumen to required temperature, andincluding all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. Tecnical Specification clause 508 8 Providing and applying seal coat type ‘C’ with 2.36 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen (VG-10) 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone grit with suitable mixol, laying and rolling with a smooth wheeled roller andincluding all material, labour, labour cess, T&P royalty, all tasex, Bitumen ect. complete as per direction by i-in-c but excluding G.S.T. 9 Part B (CC Work) 10 Construction of embankment with approved material obtained from borow pits with all lifts and leads trancporting upto 3 Km upto sites, spreading, grading to required slope and compected to meet requirement of table 300.2 and lead andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. 11 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3as per TechnicalSpecification Clause 405. andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. 12 Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 13 Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3and incliding supply of all meterial T&P andetc. as per direction of Engineer in charge. and excluding G.S.T. 14 Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floorsand incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for propercompletion of the work. SI No- 281 and excluding G.S.T. 15 R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost. SI No- 283 (A) and excluding G.S.T. 16 Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel . SI No 504 and excluding G.S.T. 17 Mantinance Part A @ 7.50 % 18 Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 7.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% 19 Item No. 9but for 2nd year 0.75% 20 Item No. 9but for 3rd year 1.50% 21 Item No. 9 but for 4th year 2.25% 22 Item No. 9 but for 5th year 3.00% 23 Mantinance Part B @ 2.50% 24 Maintenance of constructed CC road next five year after completion the contractor shall be paid total maintenance cost 2.50% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% 25 Item No. 14 but for 2nd year 0.25% 26 Item No. 14 but for 3rd year 0.50% 27 Item No. 14 but for 4th year 0.75% 28 Item No. 14 but for 5th year 1.00%

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 05-03-2025 Date Corrigendum Date 08-03-2025
2 08-03-2025 Date Corrigendum Date 11-03-2025
3 11-03-2025 DateCorrigendum Date 17-03-2025

Key Value

Document Fees
INR 2354 /-
EMD
INR 435000.0 /-
Tender Value
INR 47 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail