}

Tender For Running Contract For Hon,Ble Sansad Nidhi/Vidhayak Nidhi And Other Deposit Works Under Edd-Budaun - The Work Of Safe Carriage Of The Following Material From Nawada Store Center To Work Site Under The Jurisdiction Of Edd-Budaun. Approx. Distance, budaun-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Running Contract For Hon,Ble Sansad Nidhi/Vidhayak Nidhi And Other Deposit Works Under Edd-Budaun - The Work Of Safe Carriage Of The Following Material From Nawada Store Center To Work Site Under The Jurisdiction Of Edd-Budaun. Approx. Distance. Submission Date for this Tender is 03-03-2025. Electrification Work Tenders in budaun Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47955008
Tender For Running Contract For Hon,Ble Sansad Nidhi/Vidhayak Nidhi And Other Deposit Works Under Edd-Budaun - The Work Of Safe Carriage Of The Following Material From Nawada Store Center To Work Site Under The Jurisdiction Of Edd-Budaun. Approx. Distance
Open Tender
NCB
Uttar Pradesh
Budaun
03-03-2025

Tender Documents

Tender Details

Tender For Running Contract for hon,ble Sansad Nidhi/Vidhayak Nidhi and other Deposit Works under EDD-Budaun - The work of safe carriage of the following material from Nawada store center to work site under the jurisdiction of EDD-Budaun. Approx. distance upto 30 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 STP 11 Mtr Long 4 Line material i.e., cross arm/ conductor/ pin insulater/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc/Distribution Box etc. 5 11/0.4 KV 25 KVA T/F 6 11/0.4 KV 63 KVA T/F 7 11/0.4 KV 100 KVA T/F 8 11 KV Pilfer proof Metering cubical and CT PT Unit 9 The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom). 10 F-Clamp 11 Cross Am Holding Clamp with Nut &Bolts 12 Stone Pad 13 Garding Angle 14 Garding Angle Clamp with Nut & Bolt 15 Dropper Channel 16 Top and Dropper Channel Clamp for STP/PCC 17 Bolt Nut &Wahser 18 LT Clamp 19 Suspension I Hook 20 Suspension Clamp for XLPE Overhead 21 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms. 22 PCC Pole 8.5 Mtr Long Single Pole 23 PCC Pole 8.5 Mtr Long Double Pole 24 ST Pole 11 Mtr Long Single Pole. 25 ST Pole 11 Mtr Long Double Pole. 26 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms. 27 PCC Pole 8.5 Mtr Long Single Pole 28 PCC Pole 8.5 Mtr Long Double Pole 29 ST Pole 11 Mtr Long Single Pole. 30 ST Pole 11 Mtr Long Double Pole. 31 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms. 32 Laying, Stringing & Sagging of Following Conductor complete in all respect. 33 ACSR Weasal Conductor 34 ACSR Dog Conductor 35 3 Phase Arial Bunched Conductor 36 1 Phase Arial Bunched Conductor 37 11 KV XLPE Overhead 38 After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand form Double Pole to meetering room complete in all respect. Alongwith filling of 04 nos cable jointing kits. 39 Under groundlaying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect. Alongwith filling of 04 nos cable jointing kits. 40 11 KV XLPE Cable Size 3x70 sqmm 41 11 KV XLPE Cable Size 3x120 sqmm 42 The work of digging of pits, erection of Stay Clamp, Insulator etc. 43 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 44 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 45 Mounting of Following Capacity Transformers as per norms complete in all respect - 46 11/0.4 KV 25 KVA T/F 47 11/0.4 KV 63 KVA T/F 48 11/0.4 KV 100 KVA T/F 49 Fixing of Distribution Box complete in all respect 50 Guarding at road crossing complete in all respect 51 Safe back carriage of Scrap (if any) from work site to Nawada store Budaunapprox distance upto 30 Km including safe loading & unloading.

Key Value

Document Fees
INR 1180 /-
EMD
INR 10000.0 /-
Tender Value
INR 8.47 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail