}

Tender For Civil Works For 01 No. 33 Kv M/S Shashikanta Metal Cast Pvt. Ltd. Bay At 132 Kv S/S Bilaspur Distt. Rampur. - Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 , bilaspur-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited has published Tender For Civil Works For 01 No. 33 Kv M/S Shashikanta Metal Cast Pvt. Ltd. Bay At 132 Kv S/S Bilaspur Distt. Rampur. - Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 . Submission Date for this Tender is 01-04-2025. Paver Blocking Tenders in bilaspur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47933570
Tender For Civil Works For 01 No. 33 Kv M/S Shashikanta Metal Cast Pvt. Ltd. Bay At 132 Kv S/S Bilaspur Distt. Rampur. - Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5
Open Tender
NCB
Uttar Pradesh
Bilaspur
01-04-2025

Tender Details

Tender For Civil Works For 01 No. 33 Kv M/S Shashikanta Metal Cast Pvt. Ltd. Bay At 132 Kv S/S Bilaspur Distt. Rampur. - Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kind of soil (2.8.1) 2 Supplying and filling in plinth withsand under floors, including watering, ramming, consolidating and dressing complete.(2.27) 3 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (4.1.10) 4 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (4.1.2) 5 Centering and shuttring including strutting, propping etc and removal of form work for fdn, footing, bases for columns ( 4.3.1) 6 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (5.1.2) 7 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Mild steel and Medium Tensile steel bars) (5.22.1) 8 Centering and shuttering including strutting, propping etc. and removal of form for.Foundations, footings, bases of columns, etc. for mass concrete.(5.9.1) 9 Centering and shuttering including strutting, propping etc. and removal of form for.Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(5.9.2) 10 Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts (5.9.6) 11 Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(5.12) 12 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.(5.22.6) 13 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) 6.1.1 14 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) (6.4.1) 15 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(10.2) 16 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate(11.3.1) 17 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) (13.4.1) 18 6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand) (13.16.1) 19 Neat cement punning.(13.18) 20 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.(13.62.1) 21 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar.(15.7.4) 22 Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.(15.3) 23 Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266)900 mm. long with base plate (75x75x6mm) welded with anchor boltsincluding its threading upto a length of 10cm. and also supplyof a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work(NSI-13) 24 Fixing and grouting28 mm and above dia bolts in properalignment level and setout with help of a template completeincluding supply of all labour & T&P etc. required for propercompletion of the work.(labour rates only)(NSI-14) 25 Supplyof 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mmlong with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work.(NSI-15) 26 Fixing and grouting 25 mmand below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) .NSI-16 27 Fixing and grouting of trench edging in proper level andalignment including cost of all labour, and T&P etc. required forproper completion of the work but excluding cost of C.C. (labour rates only).(NSI-22) 28 Fixing of template in position level and alignment for groutingof Anchor bolt in main gantry (labour rate only). NSI-23 29 Fixing of template in position level and alignment for groutingof Anchor bolt in Auxiliary structure (labour rate only). (NSI-24) 30 Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). NSI -25 31 Fabrication of template for main gantry foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). NSI-26 32 Fabrication of template for auxiliary foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). NSI-27 33 Providing (12x15) mm section groove in plaster including all material, labour and T&P etc required for proper completion of work (NSI -33) 34 Champhering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (NSI -34) 35 Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position.(NSI-37) 36 Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (NSI-58)

Key Value

Document Fees
INR 1180 /-
EMD
INR 16000.0 /-
Tender Value
INR 7.97 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail