Supply Of Materials For Construction Of Nrlm Shed Work At Niduvalu Village In Tumkur Taluk - Transportation Charges Of Materials Beyond 5Km At 10 Perceent,Pvc Pipe Of 4Kgcum,75Mm,Pvc Pipe Of 6Kg Cum,63Mm,Pvc Pipe Of 10Kg Cum, 110Mm,Sorp Trap 100 Mm,Enamel Paint,Distemper Primer,Tw Beading For Fixing Glass__Glass Mr9556,Electrification Fabrication Charges.,Cost Of 6.5Mm M.S.Coil,Bib Cock 20Mm Nominal Bore,Polythylene Pipes High Density 32Mm External Dia,Add 5% For Fitting Sand Wastage Charges Add Cements And Andgrit 1% On Material Handling Loading And Unloading 3% On Material,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material Polyenthylene Water Storage Tank Of Specified Capacity L,Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrests,Add White Lead Paint, Gasket, Cement,_____ Sand For Making Good The Wall And Floor At 2% On Material,Licenced Plumber With ___Tools,Lead Or Pvc Connection Pipe 32Mm ____Dia (For Wash Basin),C.I./M.S.Brackets For Flushing ___Cistern,Brasss Top ___Cock,Cp Brass Waste 32Mm Of___ Standard Pattern,Cp Brass Chain With ___Plug,Copper Plated Brass___ Piller Tap 15Mm,White Vitreous China Clay Flat Back Wash Basin Size___ 550X400mm,Add White Cement For ___Pointing At2% On Material,Border___Tiles30x10cms,Glazed___ Tiles 300X450,Hinges __5 Inch Heavyduty__,Ceramic Tiles ____30X30cms,Vitrified Tiles ____600X600mm,Add Brush, Putty, Sand Paper At3%On Cost Of ____Paint_____,Add Brush, Putty, __Sandpaperat 2% On Cost Of Paint,Water___ Proofing Cement Paint__,Add Brush, Puttyat 5%On Cost Of Distemper____ Primer,Add Brush, Putty, Glue ___At5%On Cost Of Paint,Whitening____,Dry ____Distemper,Lime_____,Add Providing And ____Removing Scaffolding At 3% On Labour,Painter__ Classi,Welder ___Gradei,Fitter Classi__,Zsection___,Reeded__ Glass 2Mm Thick,Stays__,Handles__,Ms __Clamps__,Mullion Section___,Tsection____,Honne Wood Planks For Panels 20Mm Thick___,Solid Concrete Block (40X15x20cms 5.00 N/Sqmm__,Casurina Poles 100-150 Mm,Boulders Honne__ Wood Unit Cost As Per The Specification,Add Cutting And Other Wastage5%,Mathi/Nandiwood Planks For Panels25mm Thick Binding Wire,Tmt Bars Fe500__,Casurina Poles75-100Mmdia Mason Classi (Withtools)__,Add Handling , Loading And Unloading At 1% On Material Burnt Bricks Class35 (Nonmodular Addwateringchargesat1%Onlabour,Add Handling , Loading And Unloading At 2% On Material Silveroak Or Equivalent Planks 38Mm Thick,Jungle Wood Runner Sand Planks,Hom Of Vibrator 0.71Days Plasticizer__/Superplasticizer,Mixer_ (Concrete Small Used In Culvert),Bond Stone _20X20x45cm,Size Stone 20X20x25cms,Formwork, Centering & Scaffolding For Columns And Piers Add Watering Charges At1% On Material,Mixer Concrete)-1Cum Capacity,Portland Cement,Coarsesand (Zoneiii),Broken Stone Aggregate 12Mmto10mm_Size,Broken Stone Aggregate 20Mm _Size__,Broken_Stone__Aggregate40mm Size