Tender For Nit No 74/2024-25 Leakage Suwana - Repairing of leakages / bursts and interconnection works of AC/CI/DI/PVC pipe lines of various sizes in various Villages of PS Suwana Sl. No. Item Description 1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 2 In all type Soil AC/PVC/HDPE pipe 3 50/63/75mm 4 80/90mm 5 100/110mm 6 125/140mm 7 150/160/180mm 8 200/225mm 9 250/280mm 10 300/315mm 11 350mm 12 400mm 13 450 mm 14 500 mm 15 600 mm 16 Add 5% EXTRA on above item no. 1 for B.T. Road 17 Add 15% EXTRA on above item no.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 18 Add 20% EXTRA on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 19 Add 30% EXTRA on above no. 1 item if depth of pipeline is above3.0 mtr. 20 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 21 In all type Soil 22 80mm 23 100mm 24 125mm 25 150mm 26 200mm 27 250mm 28 300mm 29 350mm 30 400mm 31 450 mm 32 500 mm 33 600 mm 34 Add 5% EXTRAon above item no. 2 for B.T. Road 35 Add 15% EXTRAon above item no.2 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 36 Add 20% EXTRA on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 37 Add 30% EXTRA on above no. 2 item if depth of pipeline is above3.0 mtr. 38 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 39 In all type Soil 40 50/63/75mm 41 80/90mm 42 100/110mm 43 125/140mm 44 150/160/180mm 45 200/225mm 46 250/280mm 47 300/315mm 48 350mm 49 400mm 50 450 mm 51 500 mm 52 600 mm 53 Add 5% EXTRAon above item no. 3 for B.T. Road 54 Add 15% EXTRA on above item no.3 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 55 Add 20% EXTRA on above no.3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 56 Add 30% EXTRA on above no. 3 item if depth of pipeline is above3.0 mtr. 57 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 58 In all type Soil 59 80 mm 60 100 mm 61 125 mm 62 150 mm 63 200 mm 64 250 mm 65 300 mm 66 350 mm 67 400 mm 68 450 mm 69 500 mm 70 600 mm 71 Add 5% EXTRAon above item no. 4 for B.T. Road 72 Add 15% EXTRA on above item no.4 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 73 Add 20% EXTRA on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 74 Deduct 20%on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 75 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 76 In all type Soil 77 75 mm 78 90/80 mm 79 110/100 mm 80 140/125 mm 81 180/160/150 mm 82 225/200 mm 83 250 mm 84 300 mm 85 Add 5% EXTRAon above item no. 1.5 for B.T. Road 86 Add 15% EXTRAon above item no.1.5 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 87 Add 20% EXTRA on above item no. 1.5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 88 Add 30% EXTRA on above item no. 1.5 if depth of pipe line is above3.0 mtr. 89 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 90 In all type Soil 91 80 mm 92 100 mm 93 125 mm 94 150 mm 95 225/200 mm 96 250 mm 97 300 mm 98 Add 5% EXTRA on above item no. 6 for B.T. Road 99 Add 15% EXTRA on above item no.6 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 100 Add 20% EXTRA on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 101 Add 30% EXTRA on above item no. 6 if depth of pipe line is above 3.0 mtr 102 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. 103 Add 5% EXTRA on above item no. 7 for B.T. Road 104 Add 15% EXTRA on above item no.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 105 Add 20% EXTRA on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 106 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) 107 In all type Soil 108 80 mm dia pipe to 100mm 109 125 mm dia pipe to 150mm 110 200 mm dia pipe to 250mm 111 300 mm dia pipe to 350mm 112 400 mm dia pipe 113 450 mm dia pipe 114 500 mm dia pipe 115 600 mm dia pipe 116 Add 5% EXTRA on above item no. 8 for B.T. Road 117 Add 15% EXTRAon above item no.8 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 118 Add 20% EXTRAon above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 119 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 120 In all type Soil 121 80 mm to 110 mm 122 125 mm to 165 mm 123 200 mm to 300 mm 124 Add 5% EXTRA on above item no. 9 for B.T. Road 125 Add 15% EXTRA on above item no.9 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 126 Add 20% EXTRA on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 127 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 128 In all type Soil 129 80 mm to 100 mm 130 125 mm to 150 mm 131 200 mm to 300 mm 132 350 mm to 450 mm 133 500 mm to 600 mm 134 Add 5% EXTRA on above item no.10 for B.T. Road 135 Add 15% EXTRAon above item no.10 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 136 Add 20% EXTRA on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 137 Labour charges for removal of complaint of polluted water supply to the consumers 138 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours 139 Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 140 In all type Soil 141 50 to 75 mm 142 80-110 mm 143 125 to 165 mm 144 200 to 300 mm 145 350 to 400 mm 146 Add 5% EXTRA on above item no.12 for B.T. Road 147 Add 15% EXTRA on above item no.12 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 148 Add 20% EXTRA on above item no. 12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 149 Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 150 In all type Soil 151 80-100 mm 152 125 to 150 mm 153 200 to 300 mm 154 350 to 450 mm 155 Add 5% EXTRA on above item 13 for B.T. Road 156 Add 15% EXTRA on above item no.13 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only 157 Add 20% EXTRA on above item no.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 158 Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 159 Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 160 Providing, lowering, laying and jointing in trenches, standard lengths HDPEISI marked Pipes as per IS-4984: 1995 (amended up to date)with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe byelectro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) .Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.Supply may be in coil or straight length in 6 M/12 M. 161 HDPE PE-80PN-6 162 75 mm dia 163 90 mm dia 164 110 mm dia 165 125 mm dia 166 140 mm dia 167 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil 168 Ordinary rock 169 Hard rock(blasting prohibited)