Construction Of Playground For Government High School Of Mududi Village - Broken Stone Aggregate 40 Mm Size Mdgp017,Add Watering Charges At 2 % On Material Mdgp016,Add Sundries Charges At 2 % On Material Mdgp015,Add Handling , Loading And Unloading At 2% On Material Mdgp014,Mason Class Ii (With Tools) Mdgp013,Mason Class I (With Tools) Mdgp012,Water Proofing Materials Mdgp011,Brick Bats 25 To 100 Mm Mdgp010,Portland Cement Mdgp009,Coarse Sand (Zone Iii) Mdgp008,Vibratory Roller 8 Tonne Mdgp007,Water Tanker Mdgp006,Laboratory Asst. (Sslc Passed)/Mate/Supervisor Mdgp005,Gravel 2.36 Mm/Murrum Mdgp004,Water Mdgp003,Over Head & Other Miscellaneous Charges Mdgp002,Add Sundries Charges At 1 % On Labour Mdgp001,Broken Granite Metal 20 Mm Mdgp042,Plate Vibrator Having 3 Ton Compaction Force Mdgp041,Add Handling , Loading And Unloading At 1% On Material Mdgp040,Cobble Stones Of 60 Mm Thick Mdgp039,A100 Mm Dia M.S Pipe Hallow Mdgp038,Binding Wire Mdgp037,Tmt Bars Fe 500 Mdgp036,Hom Of Vibrator 0.71 Days Mdgp035,Plasticizer / Super Plasticizer Mdgp034,Caseii Unsurfaced Gravelled Road 495 T 10 Km 4950 T-Km Add 10% Of Cost Of Carriage To Cover Cost Of Loading And Unloading Mdgp033,Tipper 5 Cum Capacity Mdgp032,Paver Finisher Mechanical 100 Tph Capacity Mdgp031,Front End Loader 1 Cum Capacity Mdgp030,Generator 100 Kva Mdgp029,Wet Mix Plant (Pug Mill) Mdgp028,Grit / Stone Dust Mdgp027,K 6 Mm And Below Aggreages Mdgp026,Coarse Aggreages 12 Mm Mdgp025,Granite Metal 20 Mm Mdgp024,Granite Metal 40 Mm Mdgp023,Add Sundries Charges At 1 % On Material Mdgp022,Add Watering Charges At 1 % On Material Mdgp021,Mixer (Concrete) - 1 Cum Capacity Mdgp020,Broken Stone Aggregate 12 Mm To 10 Mm Size Mdgp019,Broken Stone Aggregate 20 Mm Size Mdgp018