supply installation testing and commissioning OF 7KW, ON-GRID SOLAR POWER PLANT TO VP OFFICE AT KUNDEWAHAL, TALUKA: PANVEL, DISTRICT: RAIGAD Supply And Erecting Of 7Kw On-Grid Solar Power Plant To Vp Office At Kundewahal Taluka Panvel Distrcit Raigad , Supply & Erecting Of 7Kw, On-Grid Solar Power Plant To Vp Office At Kundewahal, Taluka: Panvel, District: Raigad. , Supplying, Installing, Testing And Commissioning Of 7 Kwpl On-Grid Solar Pvsystem/Plant Consisting Solar Pv Polycrystalline Panel (335 Wp X 21 Nos.) And Solar On-Grid |Inverter Of Similar Capacity (Thd<3%) Withinterconnecting Wires / Cables Up To Solar On Grid Inverter, Proper Base Plate, Canopy Box To House Inverter And Necessary Accessories I.E. Acdb/ Dcdb Mcb Etc. Wiring Up To Solar Inverter Incasing And Capping, Display Board, Signboard, Two Distinct Earthing, Lightning Arrester, Liaisoning Charges, Remotemonitoring System With Maintaining Card/Chip For 5| |Years Including Net Charges For Rms System, Complete Up To Net Meter Installation And Export To The Grid Withs Year On-| Site Warranty And Fully Comprehensive Aintenance Contract As Per Specification No. Esd-Rt-Ong. Dsr Ino. 4-5-1. , Supplying, Erecting, Testing & Commisioning Static Energy Meter With 240V 50 Hz. Ac Supply 5 To 30 A, Accuracy Class |1.0 With Backlit Lcd Display, (Measuring And Display Kwh, |Kvah, V, I, Pf, Frequency, Kw, Kva, Six Months History Of] Energy & Md In Kw & Kva) With Transparent Hinge Type Box Complete Erected On Polished Teak Wood Board Duly Wired With Required Size Of Weatherproof Pvc Wires Duly Tested By Electric Supply Company. Dsr Ino. 6-5-1. , Supplying And Erecting Single Phase 10 To 60 A Net Meter Of Accuracy Class 1.0,240V, 50 Hz, With Backlit Lcd Display, Optical Port (Measures Import Kwh,Export Kwh, Net Kwh, V, I, Kw, 12 Months History Of Energy) With Wiringconnections And Mounting Hardware On Provided Panels Complete With Calibration Certificate From Manufacturer Dsr 6-5-12 , Supplying And Erecting Pipe Type Earthingwith Gi Pipe 1613.85 Complete With All Materials, Testing & Rec The Results As Per Spe Ea-Ep Dsr Ino.9-1-4 , Supplying, Erecting & Terminating Xlpe Armoured Cable 2 |Core 10 Sq. Mm. Aluminium Conductor With Continuous 5.48, S4. Mm. (12 Swg) Gi. Earth Wire Complete Erected With Glands & Lugs, On Wall/ Trusses/Pole Or Laid In Provided Trench/ Pipe As Per Speci No.Cb-Lt/Al Dsr Ino 7-1-6. , Supplying And Erecting Slotted Angles, Frames Etc. For Panell| L61.70 |Board Or Anyother Purposes Complete With Bending, Cutting, Drilling And Welding Completeerected At The Position With Necessary Materials Duly Painted With One Coat Ofred Oxide And |Two Coats Of Enamel Paint To Match The Switchgears Or As Perdirections By The Authority Dsr Ino 6-1-22.Making Cement Concrete Foundation Including Excavation (45 X 45 X 120 ) Cm Deep In 1:3:6 Cement Concrete, 20 To 25 Mm Cach Slone Metal, (45 X 45 X 45) Cm/ 45 Cm Dia. X 45 Cm Height |Plinth Duly Plastered, With Necessary Curing And Finishing Complete. (For 6 M Pole). Dsr L6.3.2. , Making Cement Concrete Foundation Including Excavation (45| X 45 X 120 ) Cm Deep In 1:3:6 Cement Concrete, 20 To 25 Mm Cach Slone Metal, (45 X 45 X 45) Cm/ 45 Cm Dia. X 45 Cm Height |Plinth Duly Plastered, With Necessary Curing And Finishing Complete. (For 6 M Pole). Dsr L6.3.2 , Grand Total = Including Gst, Transportation, Labour, Electrical Work & Civil Works.