}

Tender For Gaharpur Se Veerapur Link Road - Construction Of Embankment With Material Obtained From Borrow Pits/Right Of Way With A Lift Upto 1.5 M, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Tables 300, prayagraj-Uttar Pradesh

Public Works Department has published Tender For Gaharpur Se Veerapur Link Road - Construction Of Embankment With Material Obtained From Borrow Pits/Right Of Way With A Lift Upto 1.5 M, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Tables 300. Submission Date for this Tender is 24-02-2025. Road Work Tenders in prayagraj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47845588
Tender For Gaharpur Se Veerapur Link Road - Construction Of Embankment With Material Obtained From Borrow Pits/Right Of Way With A Lift Upto 1.5 M, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Tables 300
Open Tender
Indian
Uttar Pradesh
Prayagraj
24-02-2025

Tender Documents

Tender Details

Tender For Gaharpur Se Veerapur Link Road - Construction of Embankment with Material Obtained from Borrow Pits/Right of way with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 301 & as per direction of Engineer-in-charge. 2 Construction of subgrade and earthen shoulders with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m complete in all respect as per MORD Technical Specification Clause 303 & as per direction of Engineer-in-charge. 3 Construction of granular sub-base grading 1 by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete in all respect as per MORD Technical Specification Clause 401 & as per direction of Engineer-in-charge. 4 WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 5 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge. 6 Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete in all respects and as per direction of Engineer-in-charge. 7 Providing and applying Primer Coat with bitumen emulsion SS1 grade on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means complete in all respect as per MORD Technical Specification Clause 502 & as per direction of Engineer-in-charge. 8 Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per MORD Technical Specification Clause 503 & as per direction of Engineer-in-charge. 9 Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 2/3 part 13.2 mm approved stone grit (100% passed from 22.4 mm sieve and retained on 11.2 mm sieve) & 1/3 part 11.2 mm approved stone grit: (100% passed from 13.2mm sieve and retained on 5.6 mm sieve) using bitumen VG-10 @ 1.46 kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity, laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 506 & as per direction of Engineer-in-charge. 10 Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.7 mm size approved stone grit (100% passed from 9.5 mm sieve and retained on 2.36 mm sieve) and bitumin binder VG-10 @ 0.65 kg/sqm laying and rolling with a smooth wheeled roller, finished to required level and grades complete in all respect as per MORD Technical Specification Clause 508 & as per direction of Engineer-in-charge. 11 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge. 12 Supply & laying of 350 mm dia NP-3 HP Culvert complete in all respect as per MORD Technical Specification Clause 1101 & as per direction of Engineer-in-charge. 13 The Maintenance Cost will be provided for five years @7.50 percent.(The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill) 14 1st Year Maintenance Charges @ 0.00 % of BOQ Cost 15 2nd Year Maintenance Charges @ 0.75 % of BOQ Cost 16 3rd Year Maintenance Charges @ 1.50 % of BOQ Cost 17 4th Year Maintenance Charges @ 2.50 % of BOQ Cost 18 5th Year Maintenance Charges @ 3.00 % of BOQ Cost

Key Value

Document Fees
INR 944 /-
EMD
INR 289000.0 /-
Tender Value
INR 28.87 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail